11.07.2015 Views

06-B50 TECHNICAL MANUAL-ENGINEERING CPY-2009 - REED

06-B50 TECHNICAL MANUAL-ENGINEERING CPY-2009 - REED

06-B50 TECHNICAL MANUAL-ENGINEERING CPY-2009 - REED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>REED</strong> MODEL: <strong>B50</strong>TRAILER CONCRETE PUMPMAINTPAGE 023. PUMP CELL• Visually check for structural damage, cracked welds• Hydraulic drive cylinders in good condition, secure, no leakage• Material cylinders secure, tie rods tight• Water box/flush box structurally sound, clean, cover in place• S-tube shift mechanism structurally sound, all pins and retainers in place• Hydraulic shift cylinders in good condition• Bearing housing, seals etc. in good condition• Hydraulic hoses secure, no leaks4. HOPPER ASSEMBLY• Visually check for structural damage, cracked welds• S-tube secure, in good condition• Check condition of wear plate, wear ring, sealsREVISION:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!