24.11.2012 Views

AHP PEF Programme work - NHS Education for Scotland

AHP PEF Programme work - NHS Education for Scotland

AHP PEF Programme work - NHS Education for Scotland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NHS</strong> EDUCATION FOR SCOTLAND<br />

<strong>AHP</strong> PRACTICE-BASED EDUCATION FACILITATION PROGRAMME<br />

<strong>Programme</strong> of <strong>work</strong> 2011-2012<br />

Aim of paper<br />

To describe the <strong>AHP</strong> Practice-based <strong>Education</strong> Facilitation (<strong>PEF</strong>) <strong>work</strong>streams and<br />

priorities <strong>for</strong> 2011/2012 and to outline the structures to support this.<br />

Target Audience<br />

<strong>AHP</strong> <strong>PEF</strong>s/ PELs, <strong>AHP</strong> <strong>PEF</strong> leads <strong>AHP</strong> <strong>PEF</strong> line managers, <strong>AHP</strong> NES team, NES NM <strong>PEF</strong><br />

programme team, and Academic Heads Group<br />

Background<br />

The <strong>AHP</strong> <strong>PEF</strong> programme has evolved over the past 5 years, from a project to a<br />

substantive programme with <strong>AHP</strong> Practice <strong>Education</strong> Facilitators (<strong>PEF</strong>s)/Leads (PELs) now<br />

permanently embedded in every <strong>NHS</strong> Board. The vision and objectives of the programme<br />

remains (figure 1) but the delivery has evolved.<br />

Figure 1 - <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> Vision and Strategic Objectives<br />

…‘An aspirational investment in linking all <strong>AHP</strong>s together, in equal partnership<br />

with patients/carers and their health and social care providers, integral to<br />

wherever they practice, to create an effective learning culture that is nurturing and<br />

safe <strong>for</strong> all involved’<br />

The Strategic Objectives:<br />

1. Increasing capacity of <strong>work</strong>-based learning<br />

2. Increasing capability <strong>for</strong> quality <strong>work</strong>-based learning<br />

3. Developing the learning environment<br />

Following the launch of the NES <strong>AHP</strong> Integrated <strong>Education</strong> Strategy – The next Chapter<br />

(2011) the programme has further aligned itself to ensure that the <strong>AHP</strong> NES objectives are<br />

embedded within practice. These objectives are underpinned by the Scottish Government<br />

Quality Strategy (2010) ambitions of safe, effective and person centred care.<br />

NES has, and continues to, consult with a wide range of stakeholders from which a new<br />

model <strong>for</strong> delivery of the <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> has evolved.<br />

1


In March 2011 the <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> hosted a “conversation” with <strong>AHP</strong> <strong>PEF</strong>s/PELs,<br />

<strong>AHP</strong> <strong>PEF</strong> Leads and <strong>AHP</strong> <strong>PEF</strong> line managers to determine the priorities <strong>for</strong> 2011/12 and<br />

ways of <strong>work</strong>ing and engaging across boards, regions and with other NES <strong>work</strong>streams.<br />

The <strong>AHP</strong> <strong>PEF</strong> programme management group have taken these discussions and<br />

assimilated them with the <strong>AHP</strong> NES Strategy and the <strong>NHS</strong> <strong>Scotland</strong> Quality Strategy<br />

(2010) to <strong>for</strong>m the approach <strong>for</strong> the <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> <strong>for</strong> 2011/12.<br />

<strong>AHP</strong> <strong>PEF</strong> National Strands<br />

The national strands were aspects of the <strong>AHP</strong> <strong>PEF</strong> programme that benefitted from a<br />

national approach. In moving <strong>for</strong>ward with the <strong>AHP</strong> <strong>PEF</strong> programme these strands have<br />

either been encompassed within the one of the four <strong>work</strong>streams, placed within other NES<br />

programmes or put on hold <strong>for</strong> this financial year. The <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> National<br />

Strands Update (Spring 2011) provides the final report on these and will be sent out shortly.<br />

<strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> Staff Titles<br />

Following discussion and leading on from the <strong>AHP</strong> <strong>PEF</strong> event in March it is recommended<br />

that the title of the <strong>AHP</strong> Practice <strong>Education</strong> Facilitators be changed. There have already<br />

been changes to this title within a number of boards and the lack of consistency is making<br />

identification confusing. The Chief Executive of NES, Malcolm Wright has confirmed his<br />

commitment to supporting the practice education structures within the boards and the <strong>AHP</strong><br />

<strong>PEF</strong> <strong>Programme</strong> feel it is there<strong>for</strong>e essential that the NES funded <strong>AHP</strong> staff are visible<br />

within the boards. The preferred title appears to be <strong>AHP</strong> Practice <strong>Education</strong> Leads (NES)<br />

and we are requesting that boards utilise this title <strong>for</strong>thwith. Future correspondence and<br />

service level agreements will refer to the <strong>NHS</strong> Board <strong>PEF</strong> programme staff as <strong>AHP</strong> PELs<br />

(NES).<br />

The <strong>AHP</strong> <strong>PEF</strong> priorities <strong>for</strong> 2011 - 2012<br />

The programme activity <strong>for</strong> 2011-2012 will fall under 4 <strong>work</strong>streams from which there will be<br />

core objectives.The 4 <strong>work</strong> streams are:<br />

1. <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> Management and <strong>AHP</strong> Practice <strong>Education</strong> Lead<br />

Development<br />

2. Advancing preregistration <strong>AHP</strong> practice-based education<br />

3. Embed and sustain existing NES educational solutions<br />

4. Supporting <strong>AHP</strong> PELs to nationally share and coordinate local <strong>NHS</strong> Board<br />

Practice-based <strong>Education</strong> Priorities.<br />

The structure of the programme will adapt to support these <strong>work</strong>streams ensuring that there<br />

is robust governance to underpin all the <strong>work</strong> we are doing and also to ensure connectivity<br />

with our stakeholders and other NES <strong>work</strong>streams.<br />

2


Delivering the <strong>work</strong> programme<br />

Appendix 1 provides an overview of the structure that we will adopt to deliver the <strong>work</strong><br />

programme <strong>for</strong> 2011/12. Within NES we have an established <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong><br />

Management Group, composed of the three regional practice education co-ordinators, the<br />

programme lead and project management staff. We will utilise this group to oversee the<br />

overall budgetary management, delivery and reporting of the <strong>work</strong> programme <strong>for</strong> 2011-12.<br />

A pre-registration reference group (Appendix 2) has been established which will oversee<br />

and direct <strong>work</strong>stream 2. This model will be explored with the other <strong>work</strong>streams to provide<br />

key stakeholders with the opportunity to engage with the <strong>work</strong> programme in advisory and<br />

governing roles. This will limit the number of reference groups that the programme needs<br />

and will make the most effective use of stakeholder’s time.<br />

Historically the national strands were supported by those boards with less <strong>AHP</strong>s but still<br />

retaining the minimum 0.4 sessions, and <strong>NHS</strong> Highland with additional sessions due to<br />

geography. In 2009 the programme secured additional substantive funding from NES of 1.0<br />

WTE <strong>AHP</strong> <strong>PEF</strong> role. There<strong>for</strong>e, further recurring sessions to deliver on the national strands<br />

were brokered with two boards that had originally been allocated the minimum 0.4 WTE but<br />

had an <strong>AHP</strong> <strong>work</strong><strong>for</strong>ce that had almost warranted additional sessions in the initial WTE<br />

allocation (<strong>NHS</strong> Fife and <strong>NHS</strong> Forth Valley). The remaining 0.6 WTE additional funding was<br />

used through service level agreements with <strong>NHS</strong> Boards to deliver on specific projects<br />

linked to the national strands. This was effective in completing the <strong>work</strong> however used<br />

considerable project administration resources.<br />

This year, in order to support the specific projects within each <strong>work</strong> stream, the additional<br />

0.6 WTE will be allocated on a recurring basis to those boards with no current national role<br />

attached (i.e. <strong>NHS</strong> Glasgow and Clyde, <strong>NHS</strong> Ayrshire and Arran, <strong>NHS</strong> Grampian, <strong>NHS</strong><br />

Lanarkshire, <strong>NHS</strong> Tayside and <strong>NHS</strong> Lothian). This then enables all boards to participate<br />

within the overarching <strong>work</strong> streams in addition to their on-going commitment to implement<br />

the <strong>AHP</strong> <strong>PEF</strong> programme locally.<br />

Each of the <strong>work</strong>streams and their associated projects will develop specific objectives <strong>for</strong><br />

the coming year and beyond as and when appropriate. The <strong>AHP</strong> <strong>PEF</strong> programme will<br />

utilise the evidence base to support implementation and change, specifically recognising<br />

that this requires a sustained input. Utilising the NES <strong>AHP</strong> continuous improvement model<br />

(Figure 2) the <strong>AHP</strong> <strong>PEF</strong> programme will support the development of high quality practicebased<br />

education through:<br />

• scoping what is already there<br />

• sharing educational solutions or <strong>work</strong>ing collaboratively to develop new solutions<br />

• embedding NES resources within practice<br />

• developing exit strategies to ensure that educational solutions are sustained<br />

3


• continually seeking to improve through ongoing evaluation of impact and quality<br />

Figure 2 - NES <strong>AHP</strong> Continuous Improvement Model<br />

We will further develop our communication strategy to ensure that all aspects of the <strong>AHP</strong><br />

<strong>PEF</strong> <strong>Programme</strong> are reported on in a timely and accessible <strong>for</strong>mat.<br />

<strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> <strong>work</strong> streams 2011/2012<br />

Workstream 1<br />

<strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> Management and <strong>AHP</strong> PEL Development<br />

1.1 Within the NES <strong>AHP</strong> <strong>PEF</strong> programme management group we will <strong>work</strong> to<br />

maintain the <strong>AHP</strong> <strong>PEF</strong> structures across all the 14 territorial health boards.<br />

1.2 We will support and develop the <strong>AHP</strong> Practice <strong>Education</strong> Leads (PELs) through:<br />

• Strengthening our induction programme <strong>for</strong> new PELs<br />

• Providing one-to-one personal development contacts <strong>for</strong> PELs with Practice<br />

<strong>Education</strong> Co-ordinators that will support a learning needs analysis and<br />

identification of appropriate development opportunities <strong>for</strong> these posts.<br />

• Support national development events<br />

• Continue to develop the <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> volumes on the web<br />

• Continuing to support individual PEL educational development e.g. by linking with<br />

the NES career fellowship scheme.<br />

4


• Setting national objectives <strong>for</strong> the programme and supporting PELs to meet these<br />

We propose to <strong>work</strong> with our external stakeholders and the <strong>PEF</strong> net<strong>work</strong> to advance the<br />

quality of pre-registration practice education <strong>for</strong> <strong>AHP</strong>s. Our activities and structures will be<br />

underpinned by the quality strategy and we have established a central pre-registration<br />

reference group to advise and govern our projects in this area.<br />

The specific projects <strong>for</strong> this years <strong>work</strong> are:<br />

2.1 Implementation of the practice placement agreements (PPA)<br />

2.2 Preparation of practice educators<br />

2.3 Implementation of Quality Standards <strong>for</strong> Practice Placements (QSPP)<br />

2.4 Developing common terminology and data collection <strong>for</strong> practice placements<br />

2.5 Developing models of practice placement provision<br />

2.6 Growing the next generation of <strong>AHP</strong>s (Occupational Therapy pilot)<br />

Further in<strong>for</strong>mation on these individual projects will be released shortly.<br />

We will continue to <strong>work</strong> with the NES <strong>AHP</strong> team and Nursing and Midwifery colleagues to<br />

help embed and sustain educational solutions that have been developed within NES. This<br />

will enable PEL roles to support quality <strong>work</strong>-based learning locally.<br />

Project/ Activity<br />

Workstream 2<br />

Advancing Preregistration <strong>AHP</strong> Practice <strong>Education</strong><br />

Workstream 3<br />

Embed and sustain existing NES educational solutions<br />

3.1 Flying Start <strong>NHS</strong> -<br />

3.2 Effective Practitioner – this year’s <strong>work</strong> will involve awareness raising<br />

understanding of the content and purpose of the new programme locally.<br />

3.3 Ryan Harper Legacy experience in wheelchair services<br />

3.4 <strong>AHP</strong> <strong>PEF</strong> volumes on the web<br />

5


To avoid duplication and to provide opportunities <strong>for</strong> support and sharing of educational<br />

solutions the <strong>AHP</strong> <strong>PEF</strong> programme will support the establishment of national groups<br />

focussed on specific shared Health Board priorities. The three projects chosen this year<br />

have been highlighted by a number of Boards and also link into wider NES <strong>AHP</strong> and<br />

NM<strong>AHP</strong> <strong>work</strong>. The project groups <strong>for</strong> these will lead on the development of practice based<br />

education that can then be utilised within other Boards as and when appropriate.<br />

Projects:<br />

4.1 Leadership<br />

4.2 Support <strong>work</strong>ers<br />

4.3 Supervision<br />

Workstream 4<br />

<strong>AHP</strong> <strong>PEF</strong> <strong>NHS</strong> Board Priorities Supporting <strong>AHP</strong> <strong>PEF</strong>s/PELs with the national<br />

sharing and coordination of local <strong>NHS</strong> Board Practice-based <strong>Education</strong> Priorities.<br />

Next steps<br />

In order to take this <strong>work</strong> programme <strong>for</strong>ward a new infrastructure will be utilised. This will<br />

replace the <strong>AHP</strong> <strong>PEF</strong> programme regional groups, bringing together groups of <strong>AHP</strong> PELs<br />

with common interest rather than <strong>for</strong> geographical reasons. However, the <strong>AHP</strong> practice<br />

educator preparation project will involve close collaboration with the HEIs within each of the<br />

regions and there<strong>for</strong>e there will still be opportunities <strong>for</strong> some regional group <strong>work</strong>. All the<br />

<strong>AHP</strong> PEL roles will be supported to net<strong>work</strong> and meet; and the development events will<br />

also enhance this.<br />

The <strong>AHP</strong> Practice <strong>Education</strong> Regional Coordinator role will continue in both a regional<br />

capacity and also to lead on specific aspects of the <strong>work</strong>streams. Their role will support the<br />

connectivity with other regional colleagues and programmes and also to provide in<strong>for</strong>mation<br />

sharing to and from the Health Boards within their regions. They will retain responsibility <strong>for</strong><br />

the <strong>AHP</strong> PELs in the region and ensure that there is support <strong>for</strong> practice education and<br />

leadership <strong>for</strong> personal development needs.<br />

This is an exciting next step <strong>for</strong> the <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> and we are looking <strong>for</strong>ward to<br />

engaging with you over the coming months to move this <strong>for</strong>ward.<br />

6


The NES <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> Team<br />

Jenny Miller – NES <strong>AHP</strong> Practice <strong>Education</strong> <strong>Programme</strong> Lead<br />

Jenny.miller@nes.scot.nhs.uk<br />

Karen Allan – NES <strong>AHP</strong> Practice <strong>Education</strong> Regional Coordinator – North<br />

Karen.allan@nes.scot.nhs.uk<br />

Peter Glover - NES <strong>AHP</strong> Practice <strong>Education</strong> Regional Coordinator - West<br />

Peter.glover@nes.scot.nhs.uk<br />

Bruce McCulloch - NES <strong>AHP</strong> Practice <strong>Education</strong> Regional Coordinator – South-east<br />

Bruce.mcculloch@nes.scot.nhs.uk<br />

Pauline Morrison – Project Officer<br />

Pauline.morrison@nes.scot.nhs.uk<br />

Anne Richardson – Project Administration<br />

Anne.richardson@nes.scot.nhs.uk<br />

References<br />

<strong>NHS</strong> <strong>Education</strong> <strong>for</strong> <strong>Scotland</strong>. 2011, The NES <strong>AHP</strong> <strong>Education</strong> Strategy: The Next Chapter<br />

2011-2014, <strong>NHS</strong> <strong>Education</strong> <strong>for</strong> <strong>Scotland</strong>, Edinburgh.<br />

Scottish Government, 2010, The Healthcare Quality Strategy <strong>for</strong> <strong>NHS</strong><strong>Scotland</strong>. Scottish<br />

Government, Edinburgh,<br />

7


Appendix 1 – <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> Structure


Appendix 2 – The <strong>AHP</strong> <strong>PEF</strong> <strong>Programme</strong> Pre-Registration Reference Group

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!