Guidelines for the Removal of Typical Unauthorized Building Works ...
Guidelines for the Removal of Typical Unauthorized Building Works ...
Guidelines for the Removal of Typical Unauthorized Building Works ...
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
(c)UBW erected on top <strong>of</strong> ano<strong>the</strong>r UBW(i)(ii)Be<strong>for</strong>e <strong>the</strong> commencement <strong>of</strong> <strong>the</strong> removal <strong>of</strong> <strong>the</strong> UBW at <strong>the</strong>top, all <strong>the</strong> occupants <strong>of</strong> <strong>the</strong> UBW below must be evacuated.Staff <strong>of</strong> BD will be able to assist where necessary byobtaining a Closure Order from <strong>the</strong> courts.A contractor should take note that any excessive loadingfrom building material dismantled from <strong>the</strong> UBW at <strong>the</strong> topcould cause <strong>the</strong> UBW at <strong>the</strong> bottom to collapse. There<strong>for</strong>e,any building material or debris from <strong>the</strong> removal worksshould be put into bags and lowered to ground level as soonas <strong>the</strong>y are dismantled.(iii) Similar methods <strong>of</strong> demolition and safety measures, as <strong>for</strong><strong>the</strong> removal <strong>of</strong> UBW over service lane provided aboveshould be followed.(iv) In addition, a double scaffolding should be provided around<strong>the</strong> external perimeter <strong>of</strong> <strong>the</strong> UBW to be removed to providea working plat<strong>for</strong>m <strong>for</strong> <strong>the</strong> workers and as a protectivemeasure against <strong>the</strong> accidental falling <strong>of</strong> any small debris asindicated in fig 4.(d) Ro<strong>of</strong>top and flat ro<strong>of</strong> structures(i) Be<strong>for</strong>e <strong>the</strong> commencement <strong>of</strong> any removal works, <strong>the</strong>external perimeter <strong>of</strong> <strong>the</strong> structures should be enclosed bydouble scaffolding to provide a working plat<strong>for</strong>m and toprevent <strong>the</strong> accidental falling <strong>of</strong> any small debris asindicated in fig 4.(ii) Where <strong>the</strong> UBW is adjacent to <strong>the</strong> external walls <strong>of</strong> <strong>the</strong> mainbuilding, a catchfan should be erected to protect <strong>the</strong> falling<strong>of</strong>f <strong>of</strong> any small debris from <strong>the</strong> demolition works. Catchfanshall be installed at a vertical distance <strong>of</strong> not more than 10mbelow <strong>the</strong> working plat<strong>for</strong>m. A typical detail <strong>of</strong> suchcatchfan is provided in fig 5.(iii)The sequence <strong>of</strong> demolition should generally follow those<strong>for</strong> lane structures.(iv) There<strong>for</strong>e, any debris from <strong>the</strong> demolition work should beput into small bags and transported through <strong>the</strong> mainbuilding to ground level as soon as <strong>the</strong>y are removed from<strong>the</strong> UBW.(v)Any excessive loading could cause a danger to <strong>the</strong> mainbuilding.