11.07.2015 Views

View Case Study - ERO-TEX The Ground Control Leaders

View Case Study - ERO-TEX The Ground Control Leaders

View Case Study - ERO-TEX The Ground Control Leaders

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GEOWEB®<strong>ERO</strong>SION & HARD-ARMOR PROTECTIONMcCook Quarry Flood ReservoirPROJECT TEAMOWNERMETROPOLITAN WATER RECLAMATIONDISTRICT OF GREATER CHICAGOENGINEERU.S. ARMY CORPS. OF ENGINEERSCONTRACTORSCHWARTZ EXCAVATING INC.ON-SITE MFG REP &MATERIAL SUPPLIER<strong>ERO</strong>-<strong>TEX</strong>PERMANENT EMBANKMENT PROTECTIONTop view of the GEOWEB installed on the steep slopes at McCook Quarry.PROJECT OVERVIEWPermanent erosion protection was necessary for theMcCook Quarry flood reservoir for the City of Chicago.<strong>The</strong> reservoir averages 300 ft deep and is approximately1.75 miles in diameter. <strong>The</strong> 105 ft long slopes above thequarry face required a system that would be low maintenanceand stable at 2H:1V. A major site specific challengewas installing an erosion control product on asteep, long slope with a 300 ft drop at the bottom. <strong>The</strong>product of choice was required to be installed by hand asmachines are not safe on the slope.GEOWEB® SLOPE PROTECTION SOLUTIONAfter evaluating several hard armor systems, the USACEselected Presto Geosystems’ GEOWEB cellular confinementsystem with gravel and concrete infill. <strong>The</strong> GEOWEBsystem met the installation requirements in the restrictedarea along with minimal long-term maintenance.Concrete being poured within theGEOWEB structure’s cells.An up-close look of aggregate withinthe GEOWEB confinement system.


GEOWEB®<strong>ERO</strong>SION & HARD-ARMOR PROTECTIONMcCook Quarry Flood ReservoirMCCOOK QUARRY BEFORE THE GEOWEB SYSTEM INSTALLATIONGEOWEB® SLOPE PROTECTIONPer USACE requirements, a contractor is required to obtain materialquotes from at least three manufacturers. But Jeff Russell fromSchwartz Excavating wasn’t about to compromise.“We were dead set on using the Presto GEOWEB® cellular confinementsystem due to the patented ATRA keys, ATRA clips and theability to use the GAD attachment with a Hilti air hammer. <strong>The</strong>sefeatures have drastically cut our installation costs down while givingus the highest performing finished product.”- Jeff Russell, Schwartz Excavating GEOWEB sections are quick and easyto connect with ATRA® keys. <strong>The</strong> keysare three times faster and three timesstronger than stapling. <strong>The</strong> GEOWEB system with aggregateand concrete infill provides a flexible,hard-armored slope cover.MCCOOK QUARRY DURING THE GEOWEB INSTALLATION PROCESS“<strong>The</strong> GEOWEB system madesense on several fronts. It metinstallation requirements,requires virtually no maintenanceand provides long termerosion protection of theslopes.” notes Brian Ericson,Ero-Tex, on-site manufacturer’sfield representative.MCCOOK QUARRY INSTALLATION<strong>ERO</strong>SION PROTECTION NECESSARY<strong>The</strong> 2H:1V quarry slopes required erosion protectionon its 105 foot long slopes.GEOWEB® INSTALLATIONInstalling aggregate in the GEOWEB structure onone of the slopes. No other formwork is required.LONG TERM SLOPE PROTECTIONMcCook Quarry’s slopes are now protected with the30-year proven GEOWEB® slope protection system.PRESTO©2012 Presto Products Company. All Rights Reserved.GEOWEB® is a registered trademark of Reynolds Presto Products Inc.Photos courtesy Schwartz Excavating Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!