<strong>DGBR</strong> <strong>MONTHLY</strong> <strong>NEWS</strong> <strong>LETTER</strong>1. This News Letter covers the period from 01 Mar 2013 to 31 Mar 2013. The <strong>in</strong>formation givenis of <strong>in</strong>formative nature and cannot be quoted as an authority.DG SECRETARIAT2. Important events for the month of Mar 2013 <strong>in</strong> respect of this Sectt are as under:-(a) Visit to ADMC, Bangalore: <strong>DGBR</strong> visited ADMC, Bangalore wef 23 Mar 2013 to 25Mar 2013.(b) Visit to Project Sewak : <strong>DGBR</strong> visited Project Sewak wef 28 Mar 2013 to 31 Mar2013 and <strong>in</strong>spected progress of ongo<strong>in</strong>g works on the follow<strong>in</strong>g road sectors :-(i)(ii)(iii)(iv)Insp of NH-29Jotsama Bypass Road.Kohima-Pedi-Peren Road.<strong>DGBR</strong> also called on Lt Gen AK Sahni, SM, VSM, GOC 3 Corps.BRIDGING AND TUNNELING DTE3. Progress of Major Permanent Bridges The progress of major permanent bridgesdur<strong>in</strong>g the year 2012-13 up to 31 Mar 2013 is given as under:-4. Progress of Rohtang TunnelS/No Project Target Achievement(a) Arunank 108.61 46.25(b) Beacon 224.40 139.85(c) Brahmank 378.31 199.07(d) Chetak 102.90 51.50(e) Dantak 66.60 25.64(f) Deepak 137.50 167.96(g) Himank 137.10 124.88(h) Pushpak 213.00 178.90(j) Rohtang 15.00 14.11(k) Sampark 565.87 401.35(l) Setuk 92.37 12.17(m) Sewak 244.44 55.41(n) Shivalik 233.42 116.43(o) STF Hirak 193.50 161.43(p) Swastik 229.17 87.28(q) Udayak 493.54 329.81(r) Vartak 326.39 276.43(s) Vijayak 100.35 72.89Total 3862.47 2461.46The progress of Tunnel works upto 31 Mar 2013 is 3305 m.


D&S DIRECTORATEDetails of Sem<strong>in</strong>ars/Workshops/Conferences dur<strong>in</strong>g the month of Mar 20135.S/No(a)(b)(c)Type of Sem<strong>in</strong>ar/workshop/courseShort Course on Geotech<strong>nic</strong>al aspects ofEarth QuakeSem<strong>in</strong>ar on Vigilanceand ethics <strong>in</strong> publicprocurement - A roadmap for elim<strong>in</strong>at<strong>in</strong>gcorruptionTunnel<strong>in</strong>g – The WayAheadDate Venue Organiser Officers attended04 to 08Mar 201314 to 15Mar 201321 Mar2013AhmedabadNew DelhiChennaiIITGandh<strong>in</strong>agarIRILMML&TIDPLPERSONNEL DIRECTORATEShri Virendra Kumar, EE(Civ)(P) SwastikShri RK Dhiman, VSM, SE(Civ), DirTP, HQ <strong>DGBR</strong>Shri Rahul Rathee, AEE(E&M), DDE3ES, HQ <strong>DGBR</strong>Col KS Malladi, Dir Tunnels, B&TDte, HQ <strong>DGBR</strong>Shri Vivek Shrivastava, EE(Civ),Dy Dir, B&T, HQ <strong>DGBR</strong>Assumption of Appo<strong>in</strong>tment6. The follow<strong>in</strong>g Officers have assumed the appo<strong>in</strong>tments as shown aga<strong>in</strong>st each dur<strong>in</strong>g themonth of Mar 2013 :-(a)Chief Eng<strong>in</strong>eer/Brig(i) IC-43657 Brig - CE (P) VartakPD Naidu (17.03.2013)(ii) IC-47984N Brig - CE (P) DeepakSK Kataria (22.03.2013)(iii) IC-47938Y Brig - CE (P) BeaconRaj Kumar Sharma (22.03.2013)(iv) IC-43709W Brig - CE (P) HimankBS Sandhu (25.03.2013)(b)Commander Task ForcePost<strong>in</strong>g : GREF Officers(i) IC-54421W Col - Cdr 753 BRTF/HimankAmit R Goray (08.03.2013)7. The follow<strong>in</strong>g post<strong>in</strong>gs of various cadres of GREF officers have been issued dur<strong>in</strong>gthe month of Mar 2013 :-(a) SE (Civ) - 03(b) EE(Civ) - 11(c) SAO - 07(d) MO-1 - 02(e) SPS - 01(f) CDM - 01(g) AE (Civ) - 04


Promotion-Cum-Post<strong>in</strong>g : GREF Officers8. The follow<strong>in</strong>g Personnel have been promoted and promotion-cum-post<strong>in</strong>g orders issueddur<strong>in</strong>g the month of Mar 2013.(a)JE (Civ) to AE (Civ)(i)(ii)(iii)GS-161461P JE (Civ) V<strong>in</strong>od KumarGS-161470W JE (Civ) KD UdayanGS-161472F JE (Civ) KV JosephWastage Data of GREF Officers9. (a) SuperannuationDate ofS/No GO No Rank Name Project/UnitRetirement(i) GO-3121M AO Maheswar Prasad 507 SS&TC/39 TF(P) Dpk 31 Mar 2013(ii) GO-3157L AEE(Civ) Bip<strong>in</strong> Chandra Oli 759 TF (P) Dpk 31 Mar 2013(iii) GO-2751A AEE(Civ) P Guruswamy 1401 SPL/14 TF (P) Vtk 31 Mar 2013(iv) GO-2349W AEE(E&M) RS Rawat 1062 FW/36 TF (P) Svlk 31 Mar 2013(b) Voluntary/Compulsory Retirement :S/No GO No Rank Name Project/Unit(i) GO-3952L AE(Civ) Rajendra Kumar203 PWPL/127 RCC /14TF (P) VtkDate ofRetirement01 Mar 2013Wastage Data of GREF Subord<strong>in</strong>ates10. Wastage data of GREF subord<strong>in</strong>ates for the month is as under:-(a) Voluntary Retirement - 11(b) Superannuation - 06(c) Death Cases - 18(d) Resignation/Discharge/Removal - 11from Service/Permanent Absorption(e) Promoted to Officer (rank assumed) - 01Total - 47


TECHNICAL ADMINISTRATION DIRECTORATE11. USER TRIALS COMPLETED : - 0212. USER TRIALS IN PROGRESS 04S/No FIRM SUBJECT REMARKS(a)(b)(c)(d)(e)(f)(g)(h)(j)(k)(l)(m)M/s BEMLM/S GujaratApollo IndustriesLtdM/S GujaratApollo IndustriesLtdApollo InfratechApollo InfratechApollo InfratechM/s Mah<strong>in</strong>dra &Mah<strong>in</strong>dra LtdEscorts LtdNew HollandTractor LtdM/s AMW LtdM/s Polaris IndiaPvt LtdM/s Polaris IndiaPvt LtdSnow cutterBS-42Apollo PatcherStone Crusher 20TPHConcreteMixer(Batch type)0.5 Cum & abovewith ReversibleDrum and digitalweigh batcherConcrete pump 16-30 cum/hrConcrete transitMixer 5-6 cum/hrMultiple PurposetractorMultiple PurposetractorMultiple PurposetractorAMW 1618 TP(4x2) with 8.5 CumBox BodyAll terra<strong>in</strong> Vehs :-Ranger (6x6) 800with trailerSportsman x 2 550with trailerEquipment reached at trial location. This isthe 3 rd time the firm is feed<strong>in</strong>g eqpt for trial.Firm has been <strong>in</strong>timated to bear the cost ofFOL and necessary changes <strong>in</strong> MoU shallaccord<strong>in</strong>gly be <strong>in</strong>corporated.F<strong>in</strong>al trial report received from Project.Certa<strong>in</strong> clarification sought from project videour letter No.55008/Trial/Apollo Road pachter/<strong>DGBR</strong>/68/ E4 Tech dated 15 Mar 2013.Plant dispatched to trial site as <strong>in</strong>formed byfirm rep. Project has been asked to <strong>in</strong>timatedate of arrival and commencement of trial.F<strong>in</strong>al trial report received from Project.Certa<strong>in</strong> clarification sought from project videletter No.5008/Trial/Apollo/Infra/<strong>DGBR</strong>/41/E4Tech dated 13 Mar 2013.F<strong>in</strong>al trial report received from project.Certa<strong>in</strong> clarification sought from project videletter No. 5008/Trial/Apollo/Infra/<strong>DGBR</strong>/41/E4Tech dated 13 Mar 2013.Equipment not yet placed at trial site by firm.Firm has been asked to place eqpt at trial sitevide letter No. 55008/trial/Apollo<strong>in</strong>fra/<strong>DGBR</strong>/33/E4 Tech dated 01 Feb 2013.Trial under progress.Trial under progress.Equipment dispatched to trial site on 05 Mar2013 by firm. Project has been asked to<strong>in</strong>timate date of arrival and commencement oftrial.F<strong>in</strong>al trial report under evaluation.Trial report under evaluation.(n) M/s ACE Ltd Crane 14/15 Ton Trial under progress.Vehicle not yet placed at trial site by firm.Firm has asked to place vehicle at trial sitevide 55008/trial/ATV/<strong>DGBR</strong>/24/E4 Techdated 01 Feb 2013.(o)M/s ParishramIndustrial Co-opSociety LtdStone Crusher 20TPHFirm ready to place plant by 15 th Apr 13 as<strong>in</strong>timated by firm vide their letter No. Nil dated05 Mar 13. Firm letter received under E3 ESION No. 51037/Tender/Gen/23 E3ES dated06 Mar 2013.


(p)(q)M/s Akona EngrPvt LtdM/s EverestRoad Eqpt LtdWMM Plant 60TPHWMM Plant 60TPHTrial Location not yet <strong>in</strong>timated.Trial Location not yet <strong>in</strong>timated.(r)(s)M/s Speed CraftLtdM/s GamzenPlast Pvt LtdWMM Plant 60TPHSkid steerLoaderTrial Location not yet <strong>in</strong>timated.MoU under preparation.(t)(u)M/s ACE LtdM/s AllenBuildewll Pvt LtdSoil Compacter10-12 TonConcrete Mixer(Penta 750-D)Copy of MoU be<strong>in</strong>g handed over to firm rep.Trial location not yet <strong>in</strong>timated13. TRAINING/COURSES(a) service tra<strong>in</strong><strong>in</strong>g(i) Service Tra<strong>in</strong><strong>in</strong>g - M/s Tata Motors - 27 TradesmenWorks AchievementTECHNICAL PLANNING DIRECTORATE14. Achievement of works upto 31 Mar 2013 is as under:-SerNo.(a)(b)NameofworkFmnSurfA/UEqvtCl-9KmEqvtCl-9Km(c) Resurf Cl-9(d)PmtWorksKm` <strong>in</strong>LakhAnnual Works Plan RE 2012-13Achievement upto31 Mar 2013GS Agency Total GS Agency Total1670.73 703.46 2374.19 1252.62 416.15 1668.772090.99 1614.03 3705.02 1240.50 1179.96 2420.462689.42 147.89 2837.31 1627.40 110.44 1737.84106466.91 70690.41 177157.32 50434.57 45451.28 95885.84Remarks


WORKS PROJECT DIRECTORATE215. Follow<strong>in</strong>g AEs / RAEs have been sanctioned dur<strong>in</strong>g the month of Mar 2013:-S/No Project Nos of AEsSanctionedNos ofRAEsSanctionedNos ofRevision AEsSanctionedCorrigendum(a) Arunank 15 - - -(b) Brahmank 8 1 - -(c) Shivalik 7 - - -(d) STF Hirak 9 - - -(e) Sewak 18 - - -(f) Setuk 1 - - -(g) Udayak 10 - - -(h) Vartak 17 1 - -(j) Beacon 21 - - -(k) Deepak 13 1 - -(l) Himank 11 - - -(m) Sampark 14 - - -(n) Vijayak 10 - - -(o) Chetak 12 1 - -(p) Pushpak 2 - - -(q) Dantak 1 - - -(r) Swastik 14 - - -(s) Rohtang Tunnel 2 - - 1Total 185 5 0 1


OBITUARY16. We regret to <strong>in</strong>form the death of the follow<strong>in</strong>g GREF/Army Offrs/Pers and CPLs dur<strong>in</strong>g themonth of Mar 2013 and convey our heartfelt sympathies to the bereaved families:-SrlGO/GS No. Trade Name Unit/TF/ProjectNoArmy/GREF PERSONNELDate ofdeath1 GS-172440Y SKT Sanjiv Kumar 1645 PC/38 TF (P) Deepak 14 Mar 20132 Army No L/Nk Chandra S<strong>in</strong>gh 71 RCC/24 TF (P) Pushpak 15 Mar 201315344019K DPMT3 GS-167239K Cook Daud Purti HQ 758 BRTF (P) Swastik 15 Mar 20134 GS-187763-Y Sr. DFM Manoj Kumar HQ 762 BRTF/(P) Vijayak 19 Mar 20135 GS-169043P Pnr Prem Nath Goswamy 54 RCC/16 TF/(P) Himank 19 Mar 20136 GS-165690N DES Vijaya Kumar M 343 SPL/55 RCC/762 TF 21 Mar 2013(P) Vijayak7 GS-181433K DVR MT V<strong>in</strong>eet Kumar Sharma 535 SS & TC/763 TF/(P) 23 Mar 2013VartakCPLs1 C/No 14764 CPL Krishna Newar 127 RCC/14 TF (P) Vartak 03 Mar 20132 C/No 18116 CPL Anju Ramesh 62 RCC/752 TF/(P) Udayak 03 Mar 20133 C/No 2068 CPL Ruphanu Begam 67 RCC/50 TF (P) STF 04 Mar 2013Hirak4 C/No 1099 CPL Kumar 97 RCC/42 TF (P) Vartak 07 Mar 20135 C/No 215 CPL Nabir Hussa<strong>in</strong> 120 RCC/755 TF (P) Setuk 09 Mar 20136 C/No 365 CPL Ch<strong>in</strong>ga 70 RCC/38 TF (P) Deepak 20 Mar 20137 C/No 134 CPL Hoih Nieng 80 RCC/25 TF/(P) Sewak 21 Mar 20138 C/No 7166 CPL Salka Shashi 125 RCC/763 TF/(P) Vartak 22 Mar 20139 C/No 2057 CPL Nukul Orang 82 RCC/25 TF/(P) Sewak 26 Mar 201310 C/No 253 CPL Ulshe Tapa -do- 26 Mar 201311 C/No 3187 CPL Jaura Phan -do- 26 Mar 201312 C/No 3801 CPL Sunder Phan -do- 26 Mar 201313 C/BNo 1556 CPL Kahavan Devi -do- 26 Mar 201314 C/No 3412 CPL Saidul Alam -do- 26 Mar 2013******