11.07.2015 Views

(IFC) in relation to Jubilee Ghana FPSO - modec

(IFC) in relation to Jubilee Ghana FPSO - modec

(IFC) in relation to Jubilee Ghana FPSO - modec

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 3People, there are no <strong>in</strong>digenous people liv<strong>in</strong>g near the Project. PS 8: Cultural Heritage doesnot apply because of the already-noted limited shore-based impact.E&S Categorization Rationale:Consistent with the categorization assigned <strong>to</strong> both Tullow and Kosmos projects for thePhase 1 Development of the <strong>Jubilee</strong> Field, the <strong>FPSO</strong> project, which is a component of thesame field development, is a Category B project accord<strong>in</strong>g <strong>to</strong> <strong>IFC</strong>’s Environmental and SocialReview Procedures, because a limited number of specific environmental and social impactsmay result that can be avoided or mitigated by adher<strong>in</strong>g <strong>to</strong> generally recognizedperformance standards, guidel<strong>in</strong>es, or design criteria. The key issues identified dur<strong>in</strong>gappraisal of the project, and described <strong>in</strong> detail <strong>in</strong> this Environmental and Social ReviewSummary, were:- Implementation of the sponsor’s <strong>in</strong>tegrated HSE management system at project leveldur<strong>in</strong>g construction and operation of the <strong>FPSO</strong>, and <strong>in</strong>tegration with the Unit Opera<strong>to</strong>rmanagement system;- Implementation of the <strong>FPSO</strong> hull <strong>in</strong>tegrity and safety measures, <strong>in</strong>clud<strong>in</strong>g operations,ma<strong>in</strong>tenance and <strong>in</strong>spection;- Management of production water, bilge water, deck dra<strong>in</strong>age water, ballast water, andhydrostatic test<strong>in</strong>g water;- Implementation of the emergency response plan, <strong>in</strong>clud<strong>in</strong>g oil spill preparedness andresponse measures;- Compliance with <strong>IFC</strong> and the International Convention for the Prevention of Pollutionfrom Ships (“MARPOL”) requirements for the management of air emissions (particularlyrelated <strong>to</strong> m<strong>in</strong>imization of flar<strong>in</strong>g and vent<strong>in</strong>g, and greenhouse gas emissions), producedwater, other wastewater and contam<strong>in</strong>ated waters, and hazardous materials and wastes;- Occupational health and safety management dur<strong>in</strong>g operation of the <strong>FPSO</strong>, <strong>in</strong>clud<strong>in</strong>g jobhazard analyses, fire and explosion prevention and control, personnel transfer and vessels,workplace air quality, and housekeep<strong>in</strong>g; and- Labor and work<strong>in</strong>g conditions for MODEC’s <strong>Ghana</strong> operations.The <strong>FPSO</strong> will be located at the northern edge of the <strong>Jubilee</strong> field <strong>in</strong> approximately 1,100mof water, approximately 60 km from the nearest po<strong>in</strong>t on the coast with <strong>Ghana</strong>. The locationof the <strong>FPSO</strong> will mean that impacts from production waste will be limited, and any healthand safety issues can be readily handled us<strong>in</strong>g well-known procedures and eng<strong>in</strong>eer<strong>in</strong>gtechnology. S<strong>in</strong>ce mitigation measures for the identified impacts can be readily def<strong>in</strong>ed,adverse impacts are not expected <strong>to</strong> be diverse or irreversible, and they will be limited <strong>to</strong> theproject area.Description of key Enviornmental and Social Issues and Mitigation:The Un<strong>in</strong>corporated Jo<strong>in</strong>t Venture (“UJV”) for the Phase 1 Development of the <strong>Jubilee</strong> Fieldhas presented plans <strong>to</strong> address the identified impacts for the Phase 1 Development, asdiscussed <strong>in</strong> the Tullow and Kosmos ESRS’s. These plans, <strong>in</strong>clud<strong>in</strong>g Contrac<strong>to</strong>r HSEPerformance Requirements and the <strong>FPSO</strong> technical specifications, and the MODECcorporate and project HSE management systems will ensure that the proposed project,which is a component of the Phase 1 Development project, will, upon the implementation ofthe specific agreed measures, comply with the environmental and social requirements: 1) thehost country laws and regulations, 2) the <strong>in</strong>ternational treaties and <strong>in</strong>dustry standards, 3)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!