11.07.2015 Views

(IFC) in relation to Jubilee Ghana FPSO - modec

(IFC) in relation to Jubilee Ghana FPSO - modec

(IFC) in relation to Jubilee Ghana FPSO - modec

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 3People, there are no <strong>in</strong>digenous people liv<strong>in</strong>g near the Project. PS 8: Cultural Heritage doesnot apply because of the already-noted limited shore-based impact.E&S Categorization Rationale:Consistent with the categorization assigned <strong>to</strong> both Tullow and Kosmos projects for thePhase 1 Development of the <strong>Jubilee</strong> Field, the <strong>FPSO</strong> project, which is a component of thesame field development, is a Category B project accord<strong>in</strong>g <strong>to</strong> <strong>IFC</strong>’s Environmental and SocialReview Procedures, because a limited number of specific environmental and social impactsmay result that can be avoided or mitigated by adher<strong>in</strong>g <strong>to</strong> generally recognizedperformance standards, guidel<strong>in</strong>es, or design criteria. The key issues identified dur<strong>in</strong>gappraisal of the project, and described <strong>in</strong> detail <strong>in</strong> this Environmental and Social ReviewSummary, were:- Implementation of the sponsor’s <strong>in</strong>tegrated HSE management system at project leveldur<strong>in</strong>g construction and operation of the <strong>FPSO</strong>, and <strong>in</strong>tegration with the Unit Opera<strong>to</strong>rmanagement system;- Implementation of the <strong>FPSO</strong> hull <strong>in</strong>tegrity and safety measures, <strong>in</strong>clud<strong>in</strong>g operations,ma<strong>in</strong>tenance and <strong>in</strong>spection;- Management of production water, bilge water, deck dra<strong>in</strong>age water, ballast water, andhydrostatic test<strong>in</strong>g water;- Implementation of the emergency response plan, <strong>in</strong>clud<strong>in</strong>g oil spill preparedness andresponse measures;- Compliance with <strong>IFC</strong> and the International Convention for the Prevention of Pollutionfrom Ships (“MARPOL”) requirements for the management of air emissions (particularlyrelated <strong>to</strong> m<strong>in</strong>imization of flar<strong>in</strong>g and vent<strong>in</strong>g, and greenhouse gas emissions), producedwater, other wastewater and contam<strong>in</strong>ated waters, and hazardous materials and wastes;- Occupational health and safety management dur<strong>in</strong>g operation of the <strong>FPSO</strong>, <strong>in</strong>clud<strong>in</strong>g jobhazard analyses, fire and explosion prevention and control, personnel transfer and vessels,workplace air quality, and housekeep<strong>in</strong>g; and- Labor and work<strong>in</strong>g conditions for MODEC’s <strong>Ghana</strong> operations.The <strong>FPSO</strong> will be located at the northern edge of the <strong>Jubilee</strong> field <strong>in</strong> approximately 1,100mof water, approximately 60 km from the nearest po<strong>in</strong>t on the coast with <strong>Ghana</strong>. The locationof the <strong>FPSO</strong> will mean that impacts from production waste will be limited, and any healthand safety issues can be readily handled us<strong>in</strong>g well-known procedures and eng<strong>in</strong>eer<strong>in</strong>gtechnology. S<strong>in</strong>ce mitigation measures for the identified impacts can be readily def<strong>in</strong>ed,adverse impacts are not expected <strong>to</strong> be diverse or irreversible, and they will be limited <strong>to</strong> theproject area.Description of key Enviornmental and Social Issues and Mitigation:The Un<strong>in</strong>corporated Jo<strong>in</strong>t Venture (“UJV”) for the Phase 1 Development of the <strong>Jubilee</strong> Fieldhas presented plans <strong>to</strong> address the identified impacts for the Phase 1 Development, asdiscussed <strong>in</strong> the Tullow and Kosmos ESRS’s. These plans, <strong>in</strong>clud<strong>in</strong>g Contrac<strong>to</strong>r HSEPerformance Requirements and the <strong>FPSO</strong> technical specifications, and the MODECcorporate and project HSE management systems will ensure that the proposed project,which is a component of the Phase 1 Development project, will, upon the implementation ofthe specific agreed measures, comply with the environmental and social requirements: 1) thehost country laws and regulations, 2) the <strong>in</strong>ternational treaties and <strong>in</strong>dustry standards, 3)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!