11.07.2015 Views

Rack oven MIWE lift-in

Rack oven MIWE lift-in

Rack oven MIWE lift-in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Rack</strong> <strong>oven</strong> <strong>MIWE</strong> <strong>lift</strong>-<strong>in</strong> Ample hot air <strong>in</strong> perfect dosageBak<strong>in</strong>g goods are variable dough products.What is advantageous for one type ofbak<strong>in</strong>g goods is not necessarily also goodfor another. This is especially also true forthe climate <strong>in</strong> the bak<strong>in</strong>g chamber.Formulations conta<strong>in</strong><strong>in</strong>g a large amount offat and prote<strong>in</strong> turn out best with „soft“heat, other bak<strong>in</strong>g goods profit from amplehot air circulation <strong>in</strong> certa<strong>in</strong> phases of thebak<strong>in</strong>g process.In order to achieve a f<strong>in</strong>e, differentiatedbak<strong>in</strong>g result you therefore require a rack<strong>oven</strong> that allows you to adjust thetemperature and the volume of circulat<strong>in</strong>gair <strong>in</strong>dividually for every bak<strong>in</strong>g phase andtherefore create different bak<strong>in</strong>gcharacteristics. The <strong>MIWE</strong> <strong>lift</strong>-<strong>in</strong> boasts an<strong>in</strong>geniously simple and therefore alsodurable and safe solution, even underextreme wear: the <strong>MIWE</strong> aircontrol. Thevolume of air can be controlled accuratelywith the help of a regulator that is locatedbetween the bak<strong>in</strong>g chamber and thetransverse current fan and can be openedor closed.But not only your products profit from this<strong>oven</strong>. The <strong>MIWE</strong> aircontrol also savesvaluable heat<strong>in</strong>g energy and spares theheat<strong>in</strong>g unit. And because the steam onlyhas to fill the bak<strong>in</strong>g chamber you requirenoticeably less water than before. This savesadditional energy and also has a positiveeffect on the durability of the steam device. Us<strong>in</strong>g energy to its fullestThe costs for heat<strong>in</strong>g energy are ever<strong>in</strong>creas<strong>in</strong>g. That is why we at <strong>MIWE</strong> tryeveryth<strong>in</strong>g <strong>in</strong> our power to make your lifeeasier with bak<strong>in</strong>g <strong>oven</strong>s that make themost of the energy used.The <strong>MIWE</strong> <strong>lift</strong>-<strong>in</strong> achieves this through anoutstand<strong>in</strong>g degree of effectiveness of theentire bak<strong>in</strong>g <strong>oven</strong> system. A special heat<strong>in</strong>ggas conduction accord<strong>in</strong>g tothe pr<strong>in</strong>ciple of countervail<strong>in</strong>g <strong>in</strong>fluencetakes care that the waste gas temperature isonly m<strong>in</strong>imally higher than the temperature<strong>in</strong> the bak<strong>in</strong>g chamber. This way less energyis lost right from the start.Or take a look at the door of the <strong>MIWE</strong> <strong>lift</strong>-<strong>in</strong>:the adjustable door seal<strong>in</strong>g and the stabledoor lock provide last<strong>in</strong>g steam seal<strong>in</strong>g. Thisis not only good for your products, but ofcourse also for your heat<strong>in</strong>g cost bill.That is exactly what we wanted.Technical Information<strong>MIWE</strong> <strong>lift</strong>-<strong>in</strong>2.1826 SL<strong>Rack</strong> trolley 1 or 2Bak<strong>in</strong>g tray size " / cm1x28/36 or 2x18/26 (") / 1x71/91,5 or 2x46/66 (cm)Bak<strong>in</strong>g area <strong>in</strong> square feet / m 2 140 or 130 ft 2 / 13 or 12 (m 2 )Exterior dimensions <strong>in</strong> " / cm (w x d x h)M<strong>in</strong>imal room height <strong>in</strong> " / cmHeat<strong>in</strong>gControl systemAssembly90,6/67/100,8 (") / 203/170/256 (cm)117 (") / 297 (cm)GasFP 10 fixed programApprox. 6-8 hoursSubject to technical modifications and errors<strong>MIWE</strong> Michael Wenz GmbH · D-97448 Arnste<strong>in</strong> · Germany · Phone +49 (93 63) 68-0 · Fax +49 (93 63) 68-400 · www.miwe.com 0906

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!