11.07.2015 Views

Download Pdf - All India Artisans and Craftworkers Welfare ...

Download Pdf - All India Artisans and Craftworkers Welfare ...

Download Pdf - All India Artisans and Craftworkers Welfare ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

P a g e | 9papers for the 12th Five Year Plan.Recommendations onEnvironmental issues – H<strong>and</strong>loomsEnvironmental impact needs to beinserted as an area of focus intoexisting schemes, especially theIntegrated H<strong>and</strong>loom DevelopmentScheme. Diagnostic studies shouldinclude a section on environmentalimpact <strong>and</strong> interventions as part of thescheme should include strategies tomitigate water use <strong>and</strong> discharge ofuntreated wastewater.Two pilot schemes need to beintroduced to mainstreamenvironmental concerns <strong>and</strong> mitigationstrategies in the h<strong>and</strong>loom sector:A primary Effluent Treatment Plant costsapproximately Rs. 4 - 5 lakh. However, thistreatment would only neutralize water <strong>and</strong> will notbe useful for units with high effluent content. Asecondary/tertiary Effluent Treatment Plant wouldbe needed for larger MSMEs clusters, which costsapproximately Rs. 12-15 lakhs. The secondarytreatment, depending on the technology used, cantreat discharge of various kinds of dyes (vat,reactive, natural etc).The pilot scheme can seek to support a mix ofprimary <strong>and</strong> secondary treatment plans in selectedclusters based on the environmental assessment <strong>and</strong>the amount of discharge that needs to be treated.With regard to scheme eligibility, individual unitscan be eligible to receive scheme support forprimary treatment plants; <strong>and</strong> cluster levelassociations, cooperatives <strong>and</strong> large enterprises canbe eligible for setting up secondary treatmentplants. Based on an estimate of 15 selectedh<strong>and</strong>loom clusters, the cost estimate of the schemewas provided.Scheme for Environmental Assessmentsof Major Textile Clusters: A pilotscheme to conduct environmentalassessments of up to 15 selected majorh<strong>and</strong>loom clusters can be introduced.The scheme should support technicalagencies in carrying out environmentalassessments that identify <strong>and</strong> quantifyenvironmental impact <strong>and</strong> proposespecific mitigation strategies at thecluster level. A proposed costing ofsuch a pilot scheme for 15 clusters wasprovided.Scheme for Setting up of Small-scaleEffluent Treatment Plants in H<strong>and</strong>loomproducer communities: A pilot schemeto promote effluent treatment in majorh<strong>and</strong>loom production clusters needs tobe initiated. The scheme shouldsupport capital costs of setting up aneffluent treatment plant (ETP) as wellas costs associated with mobilizingsmall-scale units to use commoneffluent treatment facilities.ANNUAL REPORT 2011 - 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!