11.07.2015 Views

Read Report - ccemc

Read Report - ccemc

Read Report - ccemc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1000 TPD CO 2 CAPTURE PLANT FEED STUDYDEVON JACKFISH 1 OILSANDS OPERATIONSFEED STUDY REPORTDEV-JA-03-001-1 (R1)Off GastoAtmosphere276,900 kg/hr11,499 J/kg36 o C0.2 kPa (g)Battery limit for CO 2 Capture PlantBattery limit between DEVON and HTCCO 2 Capture PlantFlue gasOnce-Through SteamGenerator (OTSG)DEVON Jackfish 1ProductionFacilities342 ,000 kg/hr173,500 J/kg182 o C0.2 kPa (g)Flue GasBlowerFlue GasCoolerAbsorberwith WashSectionSolvent SurgeTankIntermittentSolvent MakeupSolvent StorageTankL/R HeatExchangerReclaimer(IntermittentOperation)Stripper &CondenserReboiler(129 .75 GJ/hr)42,331 kg/hr7,040 J/kg35 o C68.5 kPa (g)CO 2Compression& DehydrationCO 2 sendout pipelineElectrical Power Supply= 2575 kWSolventInstrument airTotal Cooling Duty= 230 GJ/hrFuel GasExhaust gas toAtmosphereExcess WaterResidue toDisposal22,745 kg/hr-2,403,000 J/kg35 o C349 kPa (g)Intermittent StreamFigure 2 - Heat and Mass Balance over battery limitHTC PURENERGYPage12 (19)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!