27.11.2012 Views

Delivery program "Heavy Fabrication Division" - Dillinger Hütte GTS

Delivery program "Heavy Fabrication Division" - Dillinger Hütte GTS

Delivery program "Heavy Fabrication Division" - Dillinger Hütte GTS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HOT DISHING PROCESS OF<br />

ONE-PIECE HEADS<br />

OD 4.200 mm x 80 mm in steel SA 516 grade 70<br />

1. Circular blank being removed out of the furnace once heated at the proper temperature<br />

2. Circular blank being transferred to the 2500 t - hydraulic press by means of the overhead crane<br />

3. Circular blank being positioned onto the forming ring laying on the lateral transfer lorry<br />

<strong>Heavy</strong> <strong>Fabrication</strong> Division <strong>Dillinger</strong> <strong>Hütte</strong> <strong>GTS</strong>, One-piece heads [6/7], 2008<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!