Section C/Statement of Work / Initiatives - Volpe Center
Section C/Statement of Work / Initiatives - Volpe Center
Section C/Statement of Work / Initiatives - Volpe Center
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Spectrum / Interference Prediction• Global Positioning System– DOT-sponsored Vulnerability Study– RTCA GPS L1 and L3 documents• ILS/VOR (VHF navigation band)– Quantify ILS congestion problem• MLS (C band)• TACAN / DME (L band)• Radar X-band– ASDE-X SMR– PAR / GCA• 1030/1090 Beacon Radar Frequencies– Secondary radar vulnerability– TCAS vulnerability– ASDE-X multilateration (inc. safety approval)– ADS-B/TIS-B/FIS-B approvalAdditionalInterrogatorInterrogator& VictimReceiverAdditionalInterrogatorJanuary 31, 200824