12.07.2015 Views

Autop 2-Post - Mohawk Lifts

Autop 2-Post - Mohawk Lifts

Autop 2-Post - Mohawk Lifts

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

autop CargoliftInstallation instruction6.0 Installation of the superstructuresThe autop Cargolift will be delivered with one of the following super structures:Cargolift 85 Pv “Repair” Item no. 3000265 (4 Screws M20x50)Cargolift 90 Sa “standard” Item no. 3000206 (4 Screws M20x50)Cargolift 120 Saav “Jumbo” Item no. 3000140 (4 Screws M20x50)Cargolift 120 F “Drive-on” Item no. 3000221 (4 Screws M20x60)The superstructures need to be mounted onto thecylinders with four screws M20x50 (part no.80090)or M20x60 (part no.80243). The tightening torqueof the screws must be 560 Nm.7.0 Installation ofthe coverBefore the cassette is closed and sealed check forleakage in the hydraulic pressure system, actuatethe air valve and check if the locking mechanismoperates properly.Place the two flat bars into the U-holder left andright hand side at the aluminum guides now gluethe two rubber profiles with silicone to the bars.Replace the cover and fix it with ten screwsM10x40 DIN 7991. The screws must be mountedwith grease or anti seize. If screws need to beplaced make sure genuine stainless steel screwsare used (part no.80126).Finally fill the space between the cover and the tileframe with silicone.17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!