12.07.2015 Views

Autop 2-Post - Mohawk Lifts

Autop 2-Post - Mohawk Lifts

Autop 2-Post - Mohawk Lifts

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

autop CargoliftInstallation instructionlevelspacer blockTop of finished floor levelhas to be marked by thearchitect.steel cassetteFig. 2.1 Installation of the steel cassetteThe cassette must be perfectly adjusted in lengthand width to the level of the finished floor +1/8”.To prevent water in the lift the steel cassette hasto be mounted in concrete at 1/8“ above finishedfloor. Slope concrete away from the frame.Pour concrete in two or three separate steps eacha few hours time distance apart to allow theconcrete to lightly set between pours.DO NOT use the lift until the concrete has fullycured to 3500 psi.In case of a high ground water table watertightconcrete has to be used.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!