12.07.2015 Views

FACILITY FUEL-OIL PIPING 231113 - Mercy

FACILITY FUEL-OIL PIPING 231113 - Mercy

FACILITY FUEL-OIL PIPING 231113 - Mercy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sisters of <strong>Mercy</strong> Health System ("<strong>Mercy</strong>")MASTER SPECIFICATIONS(2010November05)i. Perma-Pipe, Inc.j. Pneumercator Inc.k. Raychem Corp; Tyco Electronics Corporation.l. Tuthill Corporation; Tuthill Transfer Systems; Sotera Systems.m. Veeder-Root; a Danaher Corporation Company.2. Calibrated, leak-detection and monitoring system with brine antifreeze solution, reservoirsensor, and electronic control panel to monitor leaks in inner and outer tank walls.3. Include fittings and devices required for testing.4. Controls: Electrical, operating on 120-V ac.5. Calibrated, liquid-level gage complying with UL 180 with floats or other sensors andremote annunciator panel.6. Remote Annunciator Panel: With visual and audible, high-tank-level and low-tank-levelalarms, fuel indicator with registration in gallons, and overfill alarm. Include gagevolume range that covers fuel-oil storage capacity.7. Controls: Electrical, operating on 120-V ac.2.14 <strong>FUEL</strong> <strong>OIL</strong>A. Diesel Fuel Oil: ASTM D 975, Grade No. 2-D, general-purpose, high volatility.2.15 LABELING AND IDENTIFYINGA. Detectable Warning Tape: Acid- and alkali-resistant, PE film warning tape manufactured formarking and identifying underground utilities, a minimum of 6 inches wide and 4 mils thick,continuously inscribed with a description of utility, with metallic core encased in a protectivejacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inchesdeep; colored yellow.2.16 CONCRETE MANHOLESA. Precast Concrete Manhole Sections: ASTM C 478, base and concentric-cone sections withintegral ladder or steps.B. Cast-Iron Frame and Cover: Heavy-duty, water-resistant, cast-iron manhole frame, gasket, andbolted cover; 24-inch- diameter, inside opening dimension; 8-inch frame riser height.PART 3 - EXECUTION3.1 EXAMINATIONA. Examine roughing-in for fuel-oil piping system to verify actual locations of piping connectionsbefore equipment installation.B. Proceed with installation only after unsatisfactory conditions have been corrected.<strong>FACILITY</strong> <strong>FUEL</strong>-<strong>OIL</strong> <strong>PIPING</strong> <strong>231113</strong> - 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!