The evaluators c<strong>on</strong>cluded that the nature, number, and structure of the policy reform benchmarksc<strong>on</strong>ta<strong>in</strong>ed <strong>in</strong> the NHSSG resulted <strong>in</strong> a great many activities be<strong>in</strong>g <strong>in</strong>itiated by the MOPHSA <strong>in</strong> anuncoord<strong>in</strong>ated manner (the grant identified 60 benchmarks spread out over six policy areas requir<strong>in</strong>gcoord<strong>in</strong>ati<strong>on</strong> of at least four separate m<strong>in</strong>istries). While the total volume of work carried out was deemedimpressive, there was a result<strong>in</strong>g lack of focus by policymakers and an <strong>in</strong>complete understand<strong>in</strong>g of thenature of the reform agenda which the NHSSG def<strong>in</strong>ed. The reforms and the resources did not appearclosely l<strong>in</strong>ked <strong>in</strong> the m<strong>in</strong>ds of MOPHSA policymakers and therefore provided little <strong>in</strong>centive to undertakethe reform package. NHSSG resources were not allocated to the <strong>in</strong>stituti<strong>on</strong>s resp<strong>on</strong>sible for the reformsso that <strong>in</strong> the eyes of many (<strong>in</strong>clud<strong>in</strong>g the evaluators) the c<strong>on</strong>necti<strong>on</strong> between "carrot and stick" was notachieved.The delays experienced <strong>in</strong> meet<strong>in</strong>g reform agenda benchmarks has meant that the f<strong>in</strong>ancialresources have not been released to the MOPHSA accord<strong>in</strong>g to the orig<strong>in</strong>al time l<strong>in</strong>e. Less than $5 milli<strong>on</strong>of the $10.4 milli<strong>on</strong> allocated has been released after eight years (1986-1994). The orig<strong>in</strong>al time l<strong>in</strong>eanticipated the disbursement of the entire $10.4 milli<strong>on</strong> with<strong>in</strong> a five-year period (1991). As a result ofthese delays (and others brought about by the de-certificati<strong>on</strong> of the <strong>in</strong>stituti<strong>on</strong> resp<strong>on</strong>sible for theallocati<strong>on</strong> and track<strong>in</strong>g of funds for the Government of Niger) the ec<strong>on</strong>omic impact of the grant has,clearly, been significantly reduced. It was noted by the evaluati<strong>on</strong> that complicated and unclear directivesfor the development of subgrants for the use of the NHSSG counterpart funds c<strong>on</strong>tributed to the lack ofec<strong>on</strong>omic impact of the grant.Instituti<strong>on</strong>al weaknesses identified dur<strong>in</strong>g the evaluati<strong>on</strong>s have plagued the NHSSG as well. TheMOPHSA has never allocated a sufficient number of qualified and capable pers<strong>on</strong>nel to assist <strong>in</strong>undertak<strong>in</strong>g grant activities. This is most likely a functi<strong>on</strong> of a lack of ownership for the reform agendaand an absolute lack of pers<strong>on</strong>nel capable of the analytic work required to achieve many of the NHSSGbenchmarks.The secretariat established by the M<strong>in</strong>istry of Plann<strong>in</strong>g to execute and track the disbursement ofNHSSG funds was deemed <strong>in</strong>adequate and decertified by <strong>USAID</strong>. Additi<strong>on</strong>ally, <strong>USAID</strong> found that it didnot have sufficient resources to adequately m<strong>on</strong>itor grant activities.L<strong>in</strong>kage of NHSSG reform c<strong>on</strong>diti<strong>on</strong>alities to those of the World Bank program proved to beproblematic. The MOPHSA was not able to undertake the activities required by the World Bank with<strong>in</strong>the orig<strong>in</strong>al time frame. As a result, several NHSSG activities were held hostage and were not able to becompleted, thus hold<strong>in</strong>g up the eventual disbursement of NHSSG fund<strong>in</strong>g.14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!