12.07.2015 Views

Electricity Supply - Drakenstein municipality

Electricity Supply - Drakenstein municipality

Electricity Supply - Drakenstein municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DOMESTIC TARIFF GROUP (CONVENTIONAL METER)31 % Increase(Subject to 14% VAT)Fixed TariffEnergy TariffRand per monthCent per kWh#* 1 x 20 Amp (8) 58.37 (35)* 1 x 30 Amp and 1 x 40 Amp 142.89 (9) 61.35 (34)* 1 x 50 Amp and 1 x 60 Amp 193.72 (32) 61.35 (34)[ 1 x 70 Amp] 207.31 (33) 61.35 (34)[ 1 x 80 Amp] 244.58 (34) 61.35 (34)[ 1 x 90 Amp] 269.94 (51) 61.35 (34)Tariffs in brackets not available for new consumers.Fixed TariffRand per monthEnergy TariffCent per kWh3 x 20 Amp 235.15 (35) 58.53 (33)3 x 30 Amp 387.63 (11) 58.53 (33)3 x 40 Amp 489.29 (36) 58.53 (33)3 x 50 Amp 590.91 (37) 58.53 (33)3 x 60 Amp 692.57 (12) 58.53 (33)3 x 70 Amp 794.19 (38) 58.53 (33)3 x 80 Amp 895.84 (39) 58.53 (33)3 x 100 Amp 1099.13 (61) 58.53 (33)Change from higher to lower scale 7,5% 132.90Tariffs in brackets not available for new consumers ( to be phased out)First 100 Kwh free for 1x20 amp consumers only# 10% Increase iro 20amp connection


COMMERCIAL, SMALL, INDUSTRIAL & GENERAL TARIFF GROUP(31% Increase)(Subject to 14% VAT)Fixed TariffRand per monthEnergy TariffCent per kWh1 x 20 Amp (13) 86.66 (63)1 x 30 Amp 120.85 (14) 64.23 (64)1 x 40 Amp 146.96 (40) 64.23 (64)1 x 50 Amp 173.13 (41) 64.23 (64)1 x 60 Amp 199.24 (22) 64.23 (64)*[ 1 x 70 Amp] 225.35 (42) 64.23 (64)*[ 1 x 80 Amp] 251.55 (43) 64.23 (64)*[ 1 x 90 Amp] 277.62 (52) 64.23 (64)Tariffs in brackets not available for new consumers.Fixed TariffRand per monthEnergy TariffCent per kWh3 x 20 Amp 241.88 (44) 62.54 (33)3 x 30 Amp 398.65 (15) 59.05 (33)3 x 40 Amp 503.21 (23) 59.05 (33)3 x 50 Amp 607.70 (24) 59.05 (33)3 x 60 Amp 712.23 (16) 59.05 (33)3 x 70 Amp 816.80 (45) 59.05 (33)3 x 80 Amp 980.54 (46) 59.05 (33)3 x 100 Amp 1130.39 (47) 59.05 (33)3 x 150 Amp 1309.76 (79) 59.05 (33)Change from higher to lower scale 7.5% 132.90*Not available for new consumers (to be phased out over a period of time as prescribed by NER)


PRE-PAID METER (COMMERCIAL)(31% Increase)(Subject to 14% VAT)Energy TariffCent per kWh1 x 20 Amp 87.011 x 30 Amp 90.991 x 40 Amp 92.801 x 50 Amp 92.801 x 60 Amp 96.603 x 40 Amp 88.793 x 60 Amp 92.803 x 80 Amp 92.803 x 100 Amp 97.14To change from higher to lower scale (7,5%) 132.90To change from lower to higherFree


BULK TARIFF GROUPS - URBAN AREAS31% Increase*25% Increase iro KvA (LT and HT)(Subject to 14% VAT)*Bulk consumers can take supply at 400V or at 11kv*Council reserves the right to connect consumers with an estimated demand exceeding 5kVa as Bulk Consumers.Consumers with expected demand exceeding 50kVa, but does not exceed 100kVa, can only be supplied at400V with special permission of the Town Engineer: Electrical, whose decision will be based on the capacity ofthe 400V distribution network*Where the expected maximum demand of a consumer exceeds 100kVa, supply shall only be at 11kV. However,measurement can be done on Low Tension where possible.Basic Charge Energy *Max DemandRand/monthCent/kWhRand/kVa(a) Low Tension 787.85 25.87 97.23(b) High Tension 787.85 25.87 96.16Maximum demand charge applicable during day hours only.Day hours 07:00 to 20:00Day hours for Sport Stadiums 07:00 to 17:00Maximum ChargeIf the total of the demand charge plus the active energy charge above, divided by the number ofkWh’s supplied in the month exceeds 100.69c plus VAT, then the customer will be charged ata rate of 100.69c plus VAT = 114.78c kWh of energy supplied in the month.


SUNDRY TARIFFS7,5% Increase<strong>Electricity</strong> Tariffs applicable to consumers at SimonsbergTariff(R) p/mVatIncl Vat( R )(a) City of Cape Town 79.87 11.18 91.05(b) Municipality of Stellenbosch53.29 7.46 60.75(c) Spoornet158.71 22.22 180.93(d) Bellville70.05 9.81 79.86(e) Data Page 168.16 23.54 191.70Stellenbosch Farmers pump for fire protectionVictoria Park 69.34 9.71 79.05EB Steam - Eskom Wheeling dealSTREETLIGHTS*On private Property Per Light 31.74 4.44 36.18Telephone Booths and Road signs Per Light 31.74 4.44 36.18MUNICIPAL ELECTRICITY TARIFFS - Increase 31%Streetlights Cent per Unit (kWh) 56.74 7.94 64.68Demand Charges HT Rand per kVa - 25%91.34 12.79 104.13LT Rand per kVa - 25%92.40 12.94 105.34HT Rand per kWh 22.90 3.21 26.11LT Rand per kWh 25.87 3.62 29.49Other: Applicable commercial or bulk tariff shall be applied*To be the same as Road signs etc.


AGRICULTURAL / RURAL TARIFF GROUP31% Increase*25% Increase iro KvA (LT and HT)(Subject to 14% VAT)Consumers directly supplied from rural 11kV lines or from line through transformer and meterbox, L.Tdistribution involved. Where more consumers require a L.T Distribution System to be installed, it will beragarded as an Urban Area.D0D1Basic Charge*Max DemandRand/Month Cen/kWh Rand / kVaConsumers with supply of 16kVaand less (20Amp) (68) 457.27 51.69 -Consumers with supply of 25kVaand less (40Amp) (53) 523.37 49.06 -D2 Consumers with supply of 26 - 50kVa (80Amp) (54) 640.52 49.06 -D3Consumers with supply of51kVa (150 Amp) (55) 809.96 49.06 -D4 Low Tension Bulk (supply exceeding 100kVa) Maximum(A) Demand Charge applicable during day hours only (56) 787.85 26.49 97.23D4 High Tension Bulk (supply exceeding 100kVa) Maximum(A) Demand Charge applicable during day (57) 787.85 26.49 96.16Day hours 7:00 to 20:00For Single Phase required in Rural Areas, Tariff Scale D1 will be used.Pre-Paid Connections can be given using the Commercial Tariff Scales, however, vending points will not be conveniently placed.Maximum ChargeIf the total of the demand charge plus the active energy charge above, divided by the number ofkWh’s supplied in the month exceeds 100.69c plus VAT, then the customer will be charged at a rate of100.69c plus VAT =114.78c kWh of energy supplied in the month.


(75)(75)(75)(75)(77)(78)


BULK TARIFF GROUPS: TIME OF USE31% Increase*25% Increase iro KvA (HT and LT)BASIC AND DEMAND CHARGESDescription Low Demand (9 Months) High Demand (3 Months)Month of actual consumptionMonth of actual consumption(January - May, September - December)(June - August)Basic Charge R 653.64 653.64*Demand Charge: HT BULKR 32.26 36.05*Demand Charge: LT BULK32.61 36.23Legend: O/P Off Peak S/P Standard Period P/P Peak PeriodENERGY CHARGESLow Demand (9 months)(January - May, September - December)High Demand (3 months)(June - August)Time Periods Mondays - Fridays Saturdays Sundays Mondays - Fridays Saturdays Sundays00h00 - 06:00 O/P 25.74 c/kWh O/P 25.74 c/kWh O/P 25.74 c/kWh O/P 26.53 c/kWh O/P 26.53 c/kWh O/P 26.53 c/kWh06h00 - 07:00 S/P 41.47 c/kWh O/P 25.74 c/kWh O/P 25.74 c/kWh S/P 46.24 c/kWh O/P 26.53 c/kWh O/P 26.53 c/kWh07h00 - 10:00 P/P 74.15 c/kWh S/P 41.47 c/kWh O/P 25.74 c/kWh P/P 110.16 c/kWh S/P 46.24 c/kWh O/P 26.53 c/kWh10h00 - 12:00 S/P 41.47 c/kWh S/P 41.47 c/kWh O/P 25.74 c/kWh S/P 46.24 c/kWh S/P 46.24 c/kWh O/P 26.53 c/kWh12h00 - 18:00 S/P 41.47 c/kWh O/P 25.74 c/kWh O/P 25.74 c/kWh S/P 46.24 c/kWh O/P 26.53 c/kWh O/P 26.53 c/kWh18h00 - 20:00 P/P 74.15 c/kWh S/P 41.47 c/kWh O/P 25.74 c/kWh P/P 110.16 c/kWh S/P 46.24 c/kWh O/P 26.53 c/kWh20h00 - 22:00 S/P 41.47 c/kWh O/P 25.74 c/kWh O/P 25.74 c/kWh S/P 46.24 c/kWh O/P 26.53 c/kWh O/P 26.53 c/kWh22h00 - 24:00 O/P 25.74 c/kWh O/P 25.74 c/kWh O/P 25.74 c/kWh O/P 26.53 c/kWh O/P 26.53 c/kWh O/P 26.53 c/kWh


ELECTRICITY SUPPLY(Tariff increase 7,5%)Tariff ExclVat( R )Vat ( R )Tariff InclVat( R )#1 DEPOSITS (20% increase rounded off)(a) New consumersDomestic consumers 650.00 - 650.00Commercial Consumers-double the average monthlyconsumption with minimum of 1800.00 1800.00(Deposits to be doubled in case of non-payment of account)(b) Bank guaranteesA bank guarantee can be accepted in cases wherea deposit of R2 500 or more is requiredNo deposit required for pre-paid meters2 ELECTRICITY SUPPLY(a) Testing of electricity meter 261.18 36.57 297.75(b) <strong>Electricity</strong> connectionsEarthing at our request 189.52 26.53 216.06The contractor is responsible for the installationof the service cable between the main distributionboard and the street boundary, as prescribed(I) SINGLE PHASE CONNECTIONSCONVENTIONAL OR PRE PAID METER* 1 x 20 Amp 244.99 34.30 279.29Above 20 Amp (includes stove relay where applicable) 813.56 113.90 927.46Additional Meter ( in meterroom) 244.99 34.30 279.29(ii) THREE PHASE CONNECTIONSEstimated Cost* IF CONSUMER CHANGE FROM 20AMP TO ANY HIGHERCONNECTION WITHIN 24 MONTHS OF ORIGINAL CONNECTION DATETHE DIFFERENCE IN CONNECTION FEE MUST BE PAID#Not subject to VAT


ELECTRICITY SUPPLY(Tariff increase 7,5%)Tariff ExclVat( R )Vat ( R )Tariff InclVat( R )(iii) CHANGE FROM CONVENTIONAL TO PRE-PAID METERSINGLE PHASE1 Voluntary change - single phase Free -(Consumer is responsible for changes to meter box)2 Non-Payers (Excluding Municipal property) Free -Same as (1), except that a new agreement must be entered intowhich stipulates that a pre-paid meter is a pre-condition.3 Municipal renting stock. Free -(iv) CHANGE FROM CONVENTIONAL TO PRE-PAID METER - THREE PHASEEstimated Cost(v) CHANGE FROM PRE-PAID TO CONVENTIONAL METER - SINGLE & THREE PHASE 407.94 57.11 465.05(a) Occasional consumers# Deposit 1236.25 1236.25<strong>Supply</strong>ing of electricity, (max 2 boxes) 364.03 50.96 414.99Plus: Per day thereafter 55.47 7.77 63.24Additional Box (per box) 317.80 44.49 362.29(b) Call out Pre-paid consumers 132.90 18.61 151.51(c) Disconnection or reconnection of supply on consumers 0.00request (i) Bulk and area supply-planned disconnection577.81 80.89 658.71(ii) Others 132.90 18.61 151.51(d) Reconnection of electricity supply 0.00(i) After temporary disconnection 132.90 18.61 151.51(ii) Because of non-payment 132.90 18.61 151.51(e) Special meter readings 0.00(i) Special meter readings at consumer's request 132.90 18.61 151.51(ii) If the consumer contests the meter reading 132.90 18.61 151.51(f) Surcharge i.r.o. late payment of account(i) An amount calculated at a rate of 10% of such anaccount subject to a maximum of R5 000.00(ii) For payment after the due of each month a surcharged of 10% will be charged oncurrent outstanding amounts to a maximum of R5000 for the first time and R10 000thereafter for each late payment within the next eleven months To a maximum of R10 000#Not subject to VAT


ELECTRICITY SUPPLY(Tariff increase 7,5%)Tariff ExclVat( R )Vat ( R )Tariff InclVat( R )(g) Non-payment of accountsTo serve a reminder by hand/mail i.r.o. a non-payment of account 69.34 9.71 79.04(h) Investigation i.r.o. power failureAt consumer's request (call out due to consumer's default) 132.90 18.61 151.51(I) Change of current limiterFrom higher to lower scale 132.90 18.61 151.51(j) Testing of installation: UrbanPer hour or portion thereof 277.35 38.83 316.18(k) Re-inspection test: UrbanPer hour or portion thereof 277.35 38.83 316.18(l) Testing of Installation: Rural and beyondSame as (k) above plus transport 277.35 38.83 316.18(m) Re-inspection test: Rural and beyoundSame as (l) above plus transport 277.35 38.83 316.18(n) Disconnection of supply on consumer’s request 132.90 18.61 151.51(o) Hiring of transformer16 KVA 179.13 25.08 204.2125 KVA 189.52 26.53 216.0650 KVA 270.42 37.86 308.27100 KVA 292.38 40.93 333.31160 KVA 435.68 60.99 496.67200 KVA 492.30 68.92 561.22315 KVA 662.18 92.70 754.88500 KVA 875.96 122.63 998.601000 KVA 1888.29 264.36 2152.65*(p) Erecting of flags on streetlamppolesper pole per week 21.50 3.01 24.51(q) (I) Tampering with electricity meter 723.42 101.28 824.70(ii) Tampering with electricity meter ( second tamper) 1445.69 202.40 1648.09<strong>Supply</strong> only to be restored afterPayment of R934.42 (R1004.50) + R92.42 (R99.40) 1341.69 187.84 1529.52Payment of illegally energy consumed plus VAT (Pre-Paid)Presenting a New certificate of compliance.3 AVAILABILITY CHARGES: (25% Increase) 655.20 91.73 746.93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!