12.07.2015 Views

Electricity Supply - Drakenstein municipality

Electricity Supply - Drakenstein municipality

Electricity Supply - Drakenstein municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BULK TARIFF GROUPS - URBAN AREAS31% Increase*25% Increase iro KvA (LT and HT)(Subject to 14% VAT)*Bulk consumers can take supply at 400V or at 11kv*Council reserves the right to connect consumers with an estimated demand exceeding 5kVa as Bulk Consumers.Consumers with expected demand exceeding 50kVa, but does not exceed 100kVa, can only be supplied at400V with special permission of the Town Engineer: Electrical, whose decision will be based on the capacity ofthe 400V distribution network*Where the expected maximum demand of a consumer exceeds 100kVa, supply shall only be at 11kV. However,measurement can be done on Low Tension where possible.Basic Charge Energy *Max DemandRand/monthCent/kWhRand/kVa(a) Low Tension 787.85 25.87 97.23(b) High Tension 787.85 25.87 96.16Maximum demand charge applicable during day hours only.Day hours 07:00 to 20:00Day hours for Sport Stadiums 07:00 to 17:00Maximum ChargeIf the total of the demand charge plus the active energy charge above, divided by the number ofkWh’s supplied in the month exceeds 100.69c plus VAT, then the customer will be charged ata rate of 100.69c plus VAT = 114.78c kWh of energy supplied in the month.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!