12.07.2015 Views

Electricity Supply - Drakenstein municipality

Electricity Supply - Drakenstein municipality

Electricity Supply - Drakenstein municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ELECTRICITY SUPPLY(Tariff increase 7,5%)Tariff ExclVat( R )Vat ( R )Tariff InclVat( R )#1 DEPOSITS (20% increase rounded off)(a) New consumersDomestic consumers 650.00 - 650.00Commercial Consumers-double the average monthlyconsumption with minimum of 1800.00 1800.00(Deposits to be doubled in case of non-payment of account)(b) Bank guaranteesA bank guarantee can be accepted in cases wherea deposit of R2 500 or more is requiredNo deposit required for pre-paid meters2 ELECTRICITY SUPPLY(a) Testing of electricity meter 261.18 36.57 297.75(b) <strong>Electricity</strong> connectionsEarthing at our request 189.52 26.53 216.06The contractor is responsible for the installationof the service cable between the main distributionboard and the street boundary, as prescribed(I) SINGLE PHASE CONNECTIONSCONVENTIONAL OR PRE PAID METER* 1 x 20 Amp 244.99 34.30 279.29Above 20 Amp (includes stove relay where applicable) 813.56 113.90 927.46Additional Meter ( in meterroom) 244.99 34.30 279.29(ii) THREE PHASE CONNECTIONSEstimated Cost* IF CONSUMER CHANGE FROM 20AMP TO ANY HIGHERCONNECTION WITHIN 24 MONTHS OF ORIGINAL CONNECTION DATETHE DIFFERENCE IN CONNECTION FEE MUST BE PAID#Not subject to VAT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!