12.07.2015 Views

Electricity Supply - Drakenstein municipality

Electricity Supply - Drakenstein municipality

Electricity Supply - Drakenstein municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ELECTRICITY SUPPLY(Tariff increase 7,5%)Tariff ExclVat( R )Vat ( R )Tariff InclVat( R )(g) Non-payment of accountsTo serve a reminder by hand/mail i.r.o. a non-payment of account 69.34 9.71 79.04(h) Investigation i.r.o. power failureAt consumer's request (call out due to consumer's default) 132.90 18.61 151.51(I) Change of current limiterFrom higher to lower scale 132.90 18.61 151.51(j) Testing of installation: UrbanPer hour or portion thereof 277.35 38.83 316.18(k) Re-inspection test: UrbanPer hour or portion thereof 277.35 38.83 316.18(l) Testing of Installation: Rural and beyondSame as (k) above plus transport 277.35 38.83 316.18(m) Re-inspection test: Rural and beyoundSame as (l) above plus transport 277.35 38.83 316.18(n) Disconnection of supply on consumer’s request 132.90 18.61 151.51(o) Hiring of transformer16 KVA 179.13 25.08 204.2125 KVA 189.52 26.53 216.0650 KVA 270.42 37.86 308.27100 KVA 292.38 40.93 333.31160 KVA 435.68 60.99 496.67200 KVA 492.30 68.92 561.22315 KVA 662.18 92.70 754.88500 KVA 875.96 122.63 998.601000 KVA 1888.29 264.36 2152.65*(p) Erecting of flags on streetlamppolesper pole per week 21.50 3.01 24.51(q) (I) Tampering with electricity meter 723.42 101.28 824.70(ii) Tampering with electricity meter ( second tamper) 1445.69 202.40 1648.09<strong>Supply</strong> only to be restored afterPayment of R934.42 (R1004.50) + R92.42 (R99.40) 1341.69 187.84 1529.52Payment of illegally energy consumed plus VAT (Pre-Paid)Presenting a New certificate of compliance.3 AVAILABILITY CHARGES: (25% Increase) 655.20 91.73 746.93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!