12.07.2015 Views

eerste project in mexico complex project sterk afgerond samen sterk ...

eerste project in mexico complex project sterk afgerond samen sterk ...

eerste project in mexico complex project sterk afgerond samen sterk ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INNOVATIONThe 125 meter-high revolv<strong>in</strong>g mast crane with a lift<strong>in</strong>gcapacity of 4,000 mT. (phto: Jeroen Tresfon).(coat<strong>in</strong>g) and as necessary the fitt<strong>in</strong>g ofanodes. These are transported to thetower via a smart system, raised to thevertical and <strong>in</strong>stalled <strong>in</strong> the tower. At thebottom of the tower is a weld<strong>in</strong>g station.Below this, <strong>in</strong> the 25 metre-long and10 metre-wide moonpool, the hang-offunit is <strong>in</strong>stalled. Also on deck are a gantrycrane and two Dreggen knuckleboomcranes, each with a lift<strong>in</strong>g capacity of40 mT. The 48 MW power plant, dividedbetween two separate eng<strong>in</strong>e rooms,consists of six diesel generator sets eachrated at 8 MW. The transit speed is <strong>in</strong>excess of 12 knots. The Aegir has twobridges. The front bridge is used for seatransport operations from a to b, whilethe survey, ROV, dp and pipelay<strong>in</strong>gactivities are controlled from the rearbridge. On board, the vessel is capableof accommodat<strong>in</strong>g 305 people.View from the rear bridge from where the survey, ROV, dp and pipelay<strong>in</strong>goperations are controlled (photo: Jeroen Tresfon).4 / 2013 OFFSHORE VISIE 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!