12.07.2015 Views

M25 Managed Motorways J16 - Highways Agency

M25 Managed Motorways J16 - Highways Agency

M25 Managed Motorways J16 - Highways Agency

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex AConsultation Paper – Controlled <strong>Motorways</strong><strong>M25</strong> Junctions 16 to 233.2 NORMAL OPERATIONDuring normal motorway operation, signals on gantries will be blank and themotorway will operate as a standard motorway, as shown in Figure 3A below.This follows the same operating approach as the existing controlled motorwayscheme operating on the <strong>M25</strong> between Junctions 10 to 16. When any otheroperational regime is introduced signals will be displayed over the carriagewaylanes.Figure 3A: The Controlled Motorway Scheme during Normal OperationRelevant Questions:When variable mandatory speed limit signs are left blank what speed limits apply?When signs are left blank the motorway will revert to the National Speed Limit and thereforea maximum speed of 70mph will apply to all lanes.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!