<strong>Gujarat</strong> <strong>International</strong> <strong>F<strong>in</strong>ance</strong> <strong>Tec</strong>‐<strong>City</strong> (<strong>GIFT</strong>)Presentation atRegional lBest Practices Sem<strong>in</strong>arManila, Philipp<strong>in</strong>es129 – 30 April, 2009


Need for <strong>F<strong>in</strong>ance</strong> <strong>City</strong> <strong>in</strong> <strong>India</strong>• Follow<strong>in</strong>g sectors have been acknowledged as high growth for <strong>India</strong>:• F<strong>in</strong>ancial Services• IT/ITeS• BPO/KPO• As per McK<strong>in</strong>sey Study by 2020, :• The sector could provide a potential 10 million to 11 million jobs• About 800 mn sq ft of office space• GDP contribution could outperform at a rate of 15 to 20 per cent• Opportunities are constra<strong>in</strong>ed:• Infrastructure t bottlenecks• Overcrowded Cities• Solution: Sett<strong>in</strong>g up Self‐susta<strong>in</strong><strong>in</strong>g Cities33


Need for <strong>F<strong>in</strong>ance</strong> <strong>City</strong> <strong>in</strong> <strong>India</strong>“If <strong>India</strong> builds an<strong>International</strong> f<strong>in</strong>ancialcenter, with suitable rulesand regulations theearn<strong>in</strong>gs out of f<strong>in</strong>ancialsector exports will surpassthat of IT”– Percy Mistry, (Fmr) World Bank44“Offshor<strong>in</strong>g <strong>in</strong>dustryneeds at least fivenew ‘Gurgaon’ andfive to seven new‘Pune plus’”– Nasscom–McK<strong>in</strong>seyreport


F<strong>in</strong>ancial Services Opportunities5• <strong>Gujarat</strong> has Potential to Access a Large F<strong>in</strong>ancial Services OpportunitySr.No.F<strong>in</strong>ancial ServicesEstimated Noof fJobs(Thousands)Year 20201F<strong>in</strong>ancial Services Operations 125-150CoreF<strong>in</strong>ancial Services Corporate2 F<strong>in</strong>ancial100-125CentreServices3 Select Product Markets 10-154 Capital Markets & Trad<strong>in</strong>g 2-45 IT for F<strong>in</strong>ancial Services 200-2252256 ITeS for F<strong>in</strong>ancial Services 75-100Total 500-600An additional 5,00,000 <strong>in</strong>direct jobs is expected to be created by 202055


<strong>Gujarat</strong> <strong>International</strong> <strong>F<strong>in</strong>ance</strong> <strong>Tec</strong>‐<strong>City</strong>Transport‣ <strong>Gujarat</strong> <strong>International</strong> <strong>F<strong>in</strong>ance</strong> <strong>Tec</strong>‐<strong>City</strong> Company Limited(<strong>GIFT</strong>CL) <strong>in</strong>corporated <strong>in</strong> June 2007‣ 50: 50 Jo<strong>in</strong>t Venture between‣ <strong>Gujarat</strong> Urban Development Co. Ltd. (GUDC) and‣ Infrastructure Leas<strong>in</strong>g and F<strong>in</strong>ancial Services Ltd. (IL&FS)‣ Share Capital: Rs. 5 Cr and PDF of Rs. 40 Cr‣ Management‣ 4 Directors nom<strong>in</strong>ated by Government of <strong>Gujarat</strong>‣ 4 Directors nom<strong>in</strong>ated by IL&FS‣ 4 Independent Directors66


Location of <strong>GIFT</strong>‣ 12 km from Ahmedabaddbd‣ 8 km from Gandh<strong>in</strong>agar‣ <strong>GIFT</strong> Area: 550 acres77


Master Plann<strong>in</strong>g8‣ 30 Build<strong>in</strong>g Blocks‣125 Build<strong>in</strong>gs‣3 Landmark Build<strong>in</strong>gs above 350 mt‣27 Build<strong>in</strong>gs above 150 mt‣46 Build<strong>in</strong>gs above 100 mt‣3 Schools‣200 Bed Hospital‣4 Hotels (~2500 rooms)88


Landmark Build<strong>in</strong>gs534465 Diamond Tower12River front213Convention Centre4Gateway Towers5Transit Node996Crystal Tower


Diamond TowerPlot Area (Sq. Mt) 28,628Total Area (Sq. ft) 4,286,056- Above Ground (Sq. ft) 2,721,372- Below Ground (Sq. ft) 1,564,684Max Height <strong>in</strong> Meters 405Max No. of Floors 86Build<strong>in</strong>g UseOffice withsupport facilities1010Package – D / Diamond Tower


Gateway TowersPlot Area (Sq. Mt) 39,864Total Area (Sq. ft) 7,184,602- Above Ground (Sq. ft) 5,356,978- Below Ground (Sq. ft) 1,827,624Max Height <strong>in</strong> Meters 350Max No. of Floors 75Build<strong>in</strong>g UseOffice withsupport facilities1111Package – C / Gateway Towers


Transit NodePlot Area (Sq. Mt) 28,628Total Area (Sq. ft) 4,286,056- Above Ground (Sq. ft) 2,721,372- Below Ground (Sq. ft) 1,564,684Max Height <strong>in</strong> Meters 231Max No. of Floors 55Build<strong>in</strong>g UseHotel, Office&Commercial1212Package – G / Transit Node


Crystal TowersPlot Area (Sq. Mt) 45,390Total Area (Sq. ft) 8,484,407- Above Ground (Sq. ft) 6,502,149,- Below Ground (Sq. ft) 1,982,258Max Height <strong>in</strong> Meters 276Max No. of Floors 65Build<strong>in</strong>g UseOffice withsupport facilities1313Package – H / Crystal Towers


Convention CentrePackage – W/Convention Centre/ MuseumPlotArea(Sq. Mt)Total Area(Sq. ft)Above Ground(Sq. ft)BelowGround (Sq.ft)MaxHeight <strong>in</strong>MetersMax No. ofFloorsBuild<strong>in</strong>g Use214,550 6,545,388 3,548,233 2,997,165 65 16 ConventionCenter** Musuem, Auditorium, Cultural Center, Exhibition spaces 14 with Support Facilities14


River FrontPackage – V1 / Dream RiverPlot Area(Sq. Mt)TotalArea (Sq.ft)AboveGround(Sq. ft)BelowGround(Sq. ft)Max Height<strong>in</strong> MetersMax No. ofFloorsBuild<strong>in</strong>g Use31, 540 2,493,662 216,333 2,277,329 17 4 Recreational Placewith support facilities1515


The <strong>GIFT</strong> Real Estate Component comprises Office, Service and Residential facilities<strong>GIFT</strong> Land use (<strong>in</strong> %)19%37%BUA ComponentArea (MillionSq.Ft.)*In %Residential 20.94 23%11%Residential+ CommercialGreen space + Water bodiesPSPTranspotationCommercial 54.0 5 60%Hotel 2.05 2%Retail 4.78 5%Public Build<strong>in</strong>g 7.49 9%Recreation 1.02 1%Total 91.2 100 %For ~91 Mn. Sq.Ft., balance area is basement5%33%Built-up Area2% 9% 1% 23% ResidentialCommercialRetailHotelPublic Build<strong>in</strong>gsRecreational60%1616


Compared to the best CBD’s of the worldParis La Defense Tokyo London Pudong <strong>GIFT</strong>Paris LaDefenseTokyo London Pudong <strong>GIFT</strong>Land use Scale (sqkm) 1.6 1.6 1.05 1.7 2.04Constructionti 25 2.5 mn 16 1.6 mn 11 1.1mn 45 4.5 mn 848 8.48 mnScale(sqm)Floor-area Ratio 1.56 1.00 1.05 2.65 4.13Greenbelt (sqm) 40,000000 120,000000 50,000000 363,500 517,821Height (m) 200 250 250 490 4051717


<strong>GIFT</strong> Infrastructure Development OverviewCore Infrastructure‐ Site Development‐ Landscap<strong>in</strong>g‐ Ma<strong>in</strong>tenance SystemsTransportation & Utilities‐ Roads and Transportation‐ Water Systems‐ Waste Management Systems‐ Power Generation and Distribution‐ District Cool<strong>in</strong>g System‐ ICT‐ Domestic Gas Distribution1818


Transportation …………………………………………………………. (1/8)TRANSPORT CONNECTIVITY‣Direct Access fromall directions‣Extension of BRTSto <strong>GIFT</strong>External planned Road Network for <strong>GIFT</strong> connectivity‣MRTS PlanEXTERNAL ROAD CONNECTIVITY1919• External Connectivity at 6po<strong>in</strong>ts• Grade Separators tosupport the network• Proposed RoW: 60-80m


Transportation ………………………………………………………. (2/8)Extension of BRTS upto<strong>GIFT</strong> <strong>City</strong>BRTS Extension –37 kmPHASE 12020


Transportation …………………………………………………………… (3/8)• Additional l<strong>in</strong>k of 25 kmbetween <strong>GIFT</strong>, Airport,Ahmedabad and Gandh<strong>in</strong>agar• Transport Demand Generatedby <strong>GIFT</strong> between Ahmedabad& Gandh<strong>in</strong>agar• 2.5 lakhs trips per day one wayby Year 2012THALTEJ• 5 lakhs trips per day one way byYear 2018KALUPUR2121


Transportation ……………………………………………………………. (4/8)TransportTRANSPORT VISIONTRANSPORT ELEMENTS‣Segregat<strong>in</strong>g vehicular & pedestrianmovement to maximum‣Modal Split of 10:90 between privateand public transport‣Walk to work concept‣Aim<strong>in</strong>g Zero Fatal Accident <strong>City</strong>‣Transit Oriented Development‣Surface Roads (2/4 lane –14 km)‣Recessed Roads ‐ underground (15.55km)‣Intelligent Transport System‣ 210 CCTV Cameras‣ 96 HR Cameras2222Recessed Road


Transportation ……………………………………………………………. (5/8)23PARKING HUBS<strong>GIFT</strong> Build<strong>in</strong>g Basements:Total Car parks capacity 85,000 cars• 4 External Park<strong>in</strong>g Hubs:• Total capacity of 30,000000 cars■LOGISTIC HUBServe to receive – store – distribute supplies tothe cityLogisticCentre■ Area = 12 acreCapacity : 800 ton■■Located at junction of NH8 & ma<strong>in</strong> arterialroad to <strong>GIFT</strong>3 Lane entry/exit road with lay bye from NH8NH 82323


Transportation ……………………………………………………………. (6/8)Liv<strong>in</strong>g Bridge:‣The ‘Liv<strong>in</strong>g Bridge’ would have a length of 600 m,8 lanes of divided carriageway with verticalsegregation of public transport and pedestrianwalkway2424


Transportation …………………………………………………………. (7/8)Signature Bridge:‣The ‘Signature Bridge’ would be approximately550m <strong>in</strong> length , have four lane dividedcarriageway with footpath on either sideTunnel:‣Total Length of Tunnel – 800m2525


Transportation …………………………………………………………. (8/8)<strong>PRT</strong> – PERSONAL RAPID TRANSPORTInnovative <strong>Tec</strong>hnology■ Automatic personal transit service■ Intelligent vehicle■ Available on demand 24 x 7■ Dedicated guide‐way network■ Non stop travel direct to dest<strong>in</strong>ation■ Stations are offl<strong>in</strong>eTransport2626Video


Water Source, Promenade and Water Front Development‣ Total Water Requirement : 20 MGD‣ Water Sources:‣ Narmada Ma<strong>in</strong> canal‣ Recycl<strong>in</strong>g and Reuse of Wastewater‣ Ra<strong>in</strong>water Harvest<strong>in</strong>g‣ <strong>GIFT</strong> Master Reservoir‣ Concept of Zero Discharge <strong>City</strong>‣ Perennial Water Front ensured throughconstruction o of three eebarrages ages on river Sabarmatiat‣ Proposed Landscaped promenade at the riverbank along <strong>GIFT</strong>2727


Sewage treatment3 STAGESStage I: Primary treatmentScreen<strong>in</strong>g and Degritt<strong>in</strong>gConcept of Zero Discharge <strong>City</strong>Stage 2: SecondarytreatmentIncludes biological processto remove organic matterand BODStage 3: TertiarytreatmentPolish the treated sewageafter secondary treatmentto br<strong>in</strong>g the water qualityup to the level of reuseSewageTreatmentPlant38 MLD (8.44MGD) capacityMdl Modular DesignRecycled Water UseTreated Water would be used for Flush<strong>in</strong>g,Landscap<strong>in</strong>g and as Make-up Water for ACCool<strong>in</strong>g Towers2828


Solid Waste ManagementProjected Waste Quantity of <strong>GIFT</strong>: 488 TPDM<strong>in</strong>imize impact on environment, human <strong>in</strong>tervention, spacerequirement, impact on health hazardAutomatic Collection and Transportation System111223 31. The waste is thrown <strong>in</strong>to a disposal chute2. Computer controlled access3. Waste sucked through pipes at a speed of 90 km/hrPlasma <strong>Tec</strong>hnology would be used for Waste Treatment2929Video


Power‣ Planned Captive Power Plant Capacity‐ 1000 MW‣ Underground cabl<strong>in</strong>g for power distribution with<strong>in</strong> the area of <strong>GIFT</strong>‣ Substation and Distribution Automation‣ Indoor substationReliability – 99.999% which meansoutage of 5.3 53m<strong>in</strong>utes/annum1. MRSS (Ma<strong>in</strong> Receiv<strong>in</strong>g Substation) 2 nos.2. UG (Underground cabl<strong>in</strong>g system) 584 km.3. ASS (Area Sub station) 14 nos.4. PSS(Package Substation) 850 nos.5. CCR ( Central Control Room) 1 nos.Power Distribution Network <strong>in</strong> <strong>GIFT</strong>3030Central ControlCentre


District Cool<strong>in</strong>gCentralized Air Condition<strong>in</strong>g System• Conventional AC System not Required• Efficiency through economies of scale• Reduces energy costs by 30%• Reduces ma<strong>in</strong>tenance costs• Improves air quality and temperature control• Reduces noise and vibration• Total Capacity : 3.25 Lakh Ton3131


Service TrenchesIntegrated t dUnderground dService Trenches• 7.5 Km <strong>in</strong> length,6.5 mt height andwidth vary<strong>in</strong>g from 24 to 36 mts• Supply of services <strong>in</strong> a sub‐surfaceregular grid• Build<strong>in</strong>gs to tap <strong>in</strong> the grid whereverrequired• All services housed <strong>in</strong> variousdivisions i i of sub‐surface ditch• No service l<strong>in</strong>es aboveground• Alternate sources & technology to beused for resource management –water & power <strong>in</strong> particular3232


Service TrenchesIntegrated Underground Service Trenches3333


Information and Communication <strong>Tec</strong>hnology (ICT)• <strong>GIFT</strong> Occupants would have access to follow<strong>in</strong>g ICT ServicesInfrastructure Platforms Services•High Speed Fibre *Network•Diverse Local and<strong>International</strong>Connectivity•Pervasive Wireless andMobile Network•Data Centres•F<strong>in</strong>ancial Extranets•CUG to Exchanges•Voice•Industry SpecificPlatforms•<strong>City</strong> e‐Portal•Sensor Networks•IPTV Internet Gateway* About 8000 km fibre ( equivalent to Ahmedabad – Chicago Distance! )•Data•Voice•Wi‐Fi•Tier‐4 Data Centres•Bus<strong>in</strong>ess Cont<strong>in</strong>uity•Security•High Speed InternetAccess•Monitor<strong>in</strong>g3434


Information & Communication <strong>Tec</strong>hnology (ICT)35<strong>GIFT</strong> will exceed the ICT capabilities of comparator citiesOvertak<strong>in</strong>g"Place"Triple PlaySmartFasterCompetitiveBuild<strong>in</strong>gs Set‐upServiceProvisionAll FibreMobile/WirelessTrad<strong>in</strong>gSub SeaDataPlatform Connectivity Centre1 <strong>GIFT</strong>2345678910DIFCDICSONGDONew WTC –New YorkCanary Wharf ‐ LondonPudong ‐ ShanghaiLa‐Defense ParisS<strong>in</strong>gaporeLondon Stock Exchange11 New York Stock Exchange12TokyoSource: Study by British TelecomPoor Reasonable Excellent Not Applicable3535


Construction Work Force Development‣ 20,000 workers can be employed dur<strong>in</strong>g construction at peak‣ Specialized workforce required for‣ Construction of tunnel & Under ground roads‣ Construction of build<strong>in</strong>g hav<strong>in</strong>g height of 300 ‐ 400 Mt‣ Specialized experts for Survey, Quantity & Lab test<strong>in</strong>g‣ Installation of huge Glass work/facades‣ Meet<strong>in</strong>gs held with various stakeholders for skill set development of constructionworkforce‣ State Government to strengthen ITI’s‣ A separate <strong>in</strong>stitution to be set up for specialized construction work force3636


Talent Development Road Map‣ Talent Development and Preference Study was undertaken by Hewitt Associates.Follow<strong>in</strong>g Talent Development Road Map is recommended to match the grow<strong>in</strong>gTalent Demand <strong>in</strong> the State of <strong>Gujarat</strong>.Nodal Agency• To act as <strong>in</strong>tegrator for all Talent Development Initiatives• To Liaise with Education Department and Universities• To Create of Long Term Talent Development PlanF<strong>in</strong>ish<strong>in</strong>g Schools– Industry Specific Short Term Courses for Fresh Graduates as Interim SolutionTra<strong>in</strong><strong>in</strong>g Schools– Skill Augmentation Courses for Specific Doma<strong>in</strong>s for Entry & Middle level Management TalentEducation <strong>City</strong> Development– Development of Education <strong>City</strong> that would offer Courses to ensure Susta<strong>in</strong>able Supply of TalentSchool Education Infrastructure Development– Development of School Education Infrastructure <strong>in</strong> the State to ensure Long Term Talent Availability3737


Project Cost and Structur<strong>in</strong>gTotal Estimated Project Cost : Rs. 70,270 CrCore Infrastructure User Pay Utilities Real EstateRs.10,475Cr Rs. 25,021 Cr Rs. 34,774Cr• Site Development• Landscape• Roads• Storm Water Dra<strong>in</strong>age• River Tra<strong>in</strong><strong>in</strong>g• Power Generation• Power Distribution• Waste Mgmt tSystem• District Cool<strong>in</strong>g• Gas System• ICT• Park<strong>in</strong>g System• Office• Commercial• Residentiali • HotelsTo be developedby <strong>GIFT</strong>CLPPP basiswith ih26%equityby <strong>GIFT</strong>CLTo be developed byoccupiers /developers3838


Means of <strong>F<strong>in</strong>ance</strong>Source of FundRs. Crores<strong>GIFT</strong> Unit Fund 12,426Strategic Investors 5,555Debt 17,514Developers 34,774Total 70,2703939


Implementation• Phased: 1 st phase 20m sq feet• Core <strong>in</strong>frastructure 3000 crores• Agreement with IL&FS to build 7.3 m sq’• Design development for core<strong>in</strong>frastructure completed• Proposed bond issue by June end4040