12.07.2015 Views

Grounding Products and Systems - Elec.ru

Grounding Products and Systems - Elec.ru

Grounding Products and Systems - Elec.ru

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Equipotential BondingSignal Reference GridInstallationSignal Reference Grid (SRG)®Figure 41. Signal Reference Grid (SRG) <strong>and</strong>bonded ground connections to buildingst<strong>ru</strong>cture.Figure 42. Low Impedance Riser (LIR), is welded to theSRG using the Type TW mold, For details, see page 49.InstallationImportant points to consider when installing an SRG:• Local codes must be followed.• All equipment shall be bonded to the ERICO SRG using low impedance risers. Never connectto strip closest to outside wall.• All raised floors within the computer room should be bolted stringer type.• Every 6th raised floor pedestal in each direction shall be connected to the SRG using a #6AWG concentric copper conductor. The connection to both the pedestal <strong>and</strong> the SRG shallbe CADWELD.• All columns, conduits, water pipes, ducts, etc. entering the computer room shall be bondedto the SRG (at each end of the room if these are horizontal).• Power distribution panels <strong>and</strong> power distribution center should be mounted directly to thebuilding steel or bonded to it by a short length of grounding conductor equal to the "greenwire ground" but at least #4 AWG copper. The grounding wire inside any panel or enclosuresupplying AC power to the computer must be bonded to its enclosure.44 Ph: 1-800-677-9089www.erico.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!