12.07.2015 Views

Pump Powered Water Supplies - Flow-Rite

Pump Powered Water Supplies - Flow-Rite

Pump Powered Water Supplies - Flow-Rite

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Operation ContinuedStep 3 - Qualify <strong>Water</strong> Supply- Check flow rate through included purger by mating purger withhose end assembly. Verify that a minimum of 2 GPM (Gallons perminute) is achieved. This can be measured with a bucket and astop watch or a watch with a second hand.Note: Should a 2 GPM flow rate not be produced refer to thetroubleshooting guide in your water supply’s instruction booklet.PurgerHose End AssemblyStep 4- Remove Dust CoverStep 5 - Mate Couplers- Insert the male coupler on the spwsystem into the female coupler on theend of the water supply.Step 6 - Observe <strong>Flow</strong> Indicator- The red balls inside the flow indicatorwill begin to spin indicating that wateris flowing into the battery. As the cellsfill and the valves shut off, the balls willbegin to spin slower until they come toa stop. This indicates that all valveshave shut off and filling is complete.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!