12.07.2015 Views

- 1 - PERPETUAL AERIAL EASEMENT ACQUISITION AGREEMENT ...

- 1 - PERPETUAL AERIAL EASEMENT ACQUISITION AGREEMENT ...

- 1 - PERPETUAL AERIAL EASEMENT ACQUISITION AGREEMENT ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FIRST AMENDMENT TORAILROAD REIMBURSEMEN T <strong>AGREEMENT</strong>GRADE SEPARATION <strong>AGREEMENT</strong>Exhibit 2Page 47 of 55FEC Standard Construction Plan Review ItemsThe following notes are to be addressed in all construction plan submittals to the Florida East CoastRailway by the Roadway Authority as applicable to the specific project. The following list is not intendedto be inclusive of all construction plan review comments. Additional comments will be generated duringthe construction plan review that is specific to the project.Section 1: Notes and Labels (Items 1· 7)1 The project Roadway At Grade and/or Grade Separated Crossings should be identified on all applicable plans asfollows:Roadway NameRoadway Design Station X+XX.XX (0+00' RT) =Florida East Coast Railway (FEC)FEC Val-Map Sta. XXXX+XX.XCrossing Name Reference per FECAAR\DOT# XXXXXXXRR MP: X+XXXX'Roadway Station X+XX.XX is to be verified by the Roadway Authority. The Roadway Design Station is the point ofintersection of the centerline of Roadway Name with the centerline of the Mainline Northbound track (to be obtainedfrom the FEC Time Table).If there are multiple Crossings shown on the plans then identify all crossings (At Grade and Grade Separated).Include this note on all sheets and profiles where the Grade Crossings are shown including plan sheets, profiles,drainage plans, utility plans, landscape plans, signalization plans, signing, and pavement marking plans, etc.2 Prior to entering into, or working on the Railway's right-of-way, you will need to contact Florida Sunshine at 1-800-432-4770 for utility locates, as you will be working around live fiber-optic cables at this location. The Railway'ssignal cables are not listed with Sunshine and require a separate locate. Call 1-800-342-1131 ext 2377 and selectoption 1 to schedule a signal cable locate. Call the same number, 1-800-342-1131 ext 2377 and select option 2 fora Watchman. The Watchman will have to be scheduled 72 hours in advance of the start date for the work. Tomaintain a safe working environment, a Watchman will have to be present anytime you or your contractors areworking within the Railway's right-of-way. The roadway contractor will need to provide proof of insurance in theamounts required by the FEC at the time of construction.All Persons working within the Railway's right-of-way must have valid Roadway Worker Protection certifications inplace and must adhere to all the rules and reg ulations regarding that certification. This includes the use ofPersonal Protection Equipment (PPE). PPE includes the following items:• Hard Hat with reflective band.• Safety Glasses with side protection.• Fluorescent green safety vest.• Steel toed boots with minimum 6" cuff and non slip tread.• Hearing protection as needed.Please place the above notes on the plans.I of7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!