12.07.2015 Views

- 1 - PERPETUAL AERIAL EASEMENT ACQUISITION AGREEMENT ...

- 1 - PERPETUAL AERIAL EASEMENT ACQUISITION AGREEMENT ...

- 1 - PERPETUAL AERIAL EASEMENT ACQUISITION AGREEMENT ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit 2Page 51 of 55No storm water may be directed towards or allowed to stand or pond within the Railway right-of-way. Earthswales or concrete or asphalt gutters shall be used to convey storm water to Municipal or private collectionsystems or storage ponds outside the Railway right-of-way.If the Roadway Authority work will affect or require modification to any existing Railway drainage facilitiesthrough or parallel to the work, it will be the Roadway Authority’s responsibility to properly design and provide adrainage system to accommodate the existing drainage, while not promoting or directing any additional volumeof storm water onto or towards the Railway right-of-way.No drainage structures (i.e. catch basins, manholes, junction boxes, etc.) shall be placed within the Railwayright-of-way.All storm water shall flow away from the Railway crossing surface and tracks structure. At no time shall anystorm water be directed towards the Railway crossing surface or track structure.Section 4: Traffic (Items 16-19)16 No Traffic Lane Shifts shall be allowed within the Railway right-of-way during construction. Therefore the followingnote is to be added to plans and the Maintenance of Traffic plans shall reflect this requirement.The Roadway Authority, or designated Contractor, shall not be allowed to perform Temporary LaneClosures, Lane Shifts, or detour routes within the Railway right-of-way without prior authorization from theRailway’s Signal Department personnel. The Roadway Authority will be required to contact the followingRailway Personnel to coordinate this phase of the project.Andy Fowler – Assistant Chief Engineer Signals and CommunicationsFlorida East Coast Railway7150 Philips HighwayJacksonville, Florida 32256Office: 904-279-3182Mobile: 904-669-1199E-mail: Andy.Fowler@fecrwy.comORFor Railway Mile Post 0+0000’ to 281+4096’James Powell – Signal Supervisor North EndFlorida East Coast Railway972 Deer Chase DriveSt. Augustine, Florida 32086Mobile: 904-669-2888E-Mail: James.Powell@fecrwy.comFor Railway Mile Post 282+2264 to 368+3059’John Marquette – Signal Supervisor South EndFlorida East Coast Railway3125 South Andrews LaneFt. Lauderdale, Florida 33316-4125Office: 305-889-5567Mobile: 954-325-3607E-Mail: John.Marquette@fecrwy.com5 of 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!