12.07.2015 Views

Safe Work Procedures - Manitoba Heavy Construction Association

Safe Work Procedures - Manitoba Heavy Construction Association

Safe Work Procedures - Manitoba Heavy Construction Association

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Safe</strong> <strong>Work</strong> ProcedureChanging Bucket TeethFacility: Written By: Approved By: Date Created Date of Last Revision:Hazards Present: PPE or Devices Required: Additional Training Required:Pinch pointsMuscle strainCrush by machineSteel toed boots<strong>Safe</strong>ty glassesHand protection<strong>Safe</strong> <strong>Work</strong> Procedure:1 Park equipment on level ground with brake applied2 Raise bucket and place supports3 Hammer out pins, using bolts from left to right side4 Remove teeth with hammer5 Clean shank with wire brush6 Install pin lock7 Install tooth8 Drive pin lock in left to rightIf an emergency situation occurs while conducting this task, or there is an equipment malfunction, engagethe emergency stop and follow the lock out procedureREPORT ANY HAZARDOUS SITUATIONS TO YOUR SUPERVISORGuidance Documents/Standards:This <strong>Safe</strong> <strong>Work</strong> Procedure will be reviewed any timethe task, equipment or materials change and at aMB <strong>Work</strong>place <strong>Safe</strong>ty & Health Act & Regulations: minimum of every three years6 Personal Protective Equipment8 Musculoskeletal Injury Reviewed By <strong>Work</strong>er Rep/WSH Committee:16 Machines, Tools and RobotsDate:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!