12.07.2015 Views

Safe Work Procedures - Manitoba Heavy Construction Association

Safe Work Procedures - Manitoba Heavy Construction Association

Safe Work Procedures - Manitoba Heavy Construction Association

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Safe</strong> <strong>Work</strong> ProcedureFueling VehiclesFacility: Written By: Approved By: Date Created Date of Last Revision:Hazards Present: PPE or Devices Required: Additional Training Required:Eye injuryFire/Explosion hazardsBurnsSteel toed bootsEye protectionHand protection<strong>Safe</strong> <strong>Work</strong> Procedure:1 Bring vehicle to pump2 Shut off ignition, extinguish any smoking material, leave cell phone in vehicle3 Remove fill cap4 Insert nozzle in to tank and flip lever to on position5 Fill until click is heard or to desired amount then turn lever to off position6 Place nozzle back on holder and replace the fill capIf an emergency situation occurs while conducting this task, or there is an equipment malfunction, engagethe emergency stop and follow the lock out procedureREPORT ANY HAZARDOUS SITUATIONS TO YOUR SUPERVISORGuidance Documents/Standards:This <strong>Safe</strong> <strong>Work</strong> Procedure will be reviewed any timethe task, equipment or materials change and at aMB <strong>Work</strong>place <strong>Safe</strong>ty & Health Act & Regulations: minimum of every three years6 Personal Protective Equipment19 Fire and Explosive Hazards Reviewed By <strong>Work</strong>er Rep/WSH Committee:35 <strong>Work</strong>place Hazardous Materials InformationSystemsDate:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!