12.07.2015 Views

Meeting Component Reliability Demands of the Aerospace Industry ...

Meeting Component Reliability Demands of the Aerospace Industry ...

Meeting Component Reliability Demands of the Aerospace Industry ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NPI process: Phase and Gate Process to achieve <strong>Reliability</strong>Identify Product RequirementsCustomer Spec., Agency SpecsTranslate to to Technical Requirements& Flowdown to to <strong>Component</strong>sDesign Specification, QFD, Risk Assessment -> Key RequirementsFlowdown, <strong>Component</strong> Specifications, Validation PlansDesign Product, Assess AgainstTargets & Make TradesFMEA, PFMEA, Lessons Learned, Design Practices, DFSS,Maintainability AnalysisValidate Customer & AirworthinessRequirements are satisfiedDesign Review, Substantiation, Testing andManufacturing CapabilityFRACAS (Failure Reporting, Analysis and CorrectiveAction System)Problem Problem Tracking Trackingand and Resolution ResolutionAchieve Type Design Certificationand Production Readiness© Avio SpA - 2009Continued AirworthinessFailure, Malfunction & Defect Mangement,Engineering Change, Service BulletinMonitor Field Performance to to AssureCustomer Requirements are satisfiedObserved <strong>Reliability</strong>, Weibull, IFSD, MTBUROct. 6th, 2009 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!