Ship Remediation & Dismantling <strong>Facility</strong><br />
Working Under<br />
Local, State, & Federal<br />
Environmental, Safety, & Health<br />
Regulatory Laws
<strong>ESCO</strong>’s B.M.P.<br />
Environmental Programs<br />
• (PCB’s) Polychlorinated Biphenyls - Including Liquid and solid media<br />
• Asbestos<br />
• (Petroleum Hydrocarbons) Fuel oil/ Hydraulic oil/ Lubricants / Grease /<br />
Sludge / and Sump oil<br />
• RCRA Metals Lead, Barium, Cadmium and Chromium , Zinc s )<br />
• (Universal Waste) Mercury ,(liquid) (solid) Fluorescent bulbs<br />
•<br />
• (CFC’s)Ozone Depleting Substances<br />
• Waste Water / Fire fighting, bilge water, ballast water<br />
• Solid Waste<br />
• 10 Approved Navy Cutting Pads- 60 mil lined with 1,000 gallon liquid<br />
collection tanks @ each pad.
Safety & Health Programs<br />
• Diving Operations<br />
• Work Permits<br />
• Fire Prevention and Protection<br />
• Scaffolds, Ladders, and Other Working Surfaces<br />
• Health and Sanitation<br />
• Employee Training and Documentation<br />
• PCB Management<br />
• Personal Protective Equipment<br />
• Fall Protection<br />
• Lead Management<br />
• Respiratory Protection<br />
• Workplace Electrical and Lighting<br />
• Accident and Incident Investigation<br />
• Drug and Alcohol Program<br />
• Water Operations Safety<br />
• Confined and Enclosed Spaces<br />
• Welding, Cutting, and Heating<br />
• Compressed Gas Cylinders<br />
• Housekeeping and Temporary Lighting<br />
• Hazard Communication<br />
• Asbestos Management<br />
• Rigging and Material Handling<br />
• Hearing Conservation<br />
• Employee Emergency Plans<br />
• Spill Program and Emergency Response<br />
• Blood borne Pathogens Program<br />
• Machine Guarding
<strong>ESCO</strong> Marine Inc. Ship Dismantling<br />
<strong>Facility</strong> - Statistics<br />
• 3,945 Feet of waterfront Dockage<br />
• (3) – Slips with Containment Boom, & Winching Capabilities.<br />
• (4) - Vessels, can be berthed along shoreline, with engineered mooring.<br />
• (1) – 2,000 hp ocean tug<br />
• (4) – Hopper Barges – Scrap hauling<br />
• (3) - 150 ton Lifting Cranes<br />
• (1) - 165 Ton Lifting Crane<br />
• (2) - 220 ton Lifting Cranes<br />
• (1) – 110 ton lift crane and magnet<br />
• (5) - Magnets - Scrap Handler<br />
• (5) – Off-road articulated trucks<br />
• (5) – Loaders with Forks and Buckets<br />
• (1) – 2500 hp Universal Hammer mill Shredder<br />
• (1) –3000 psi High Speed Bailers<br />
• (1) – Electrical Cable Chopper - Copper Processer<br />
• (2) –Steel Process Handlers – Genesis Mobile Sheer/Stationary Richards Sheer<br />
• (350) - Trained employees of various crafts.<br />
• [1] – Power cat C Wire Chopper
<strong>ESCO</strong> <strong>Facility</strong> Map -1
Waste Accumulations from<br />
` the past 18 ships<br />
• Asbestos 7,671,728 pounds<br />
• PCB Bulk Waste 10,715,854 pounds<br />
• PCB Oil 20,506 pounds<br />
• Recyclable Oil 431,672 gallons<br />
• OWS 2,537,203 gallons<br />
• Mercury 1,878 pounds
<strong>ESCO</strong> Marine Offices<br />
<strong>ESCO</strong> Management, Navy, MARAD<br />
Offices<br />
Field -Environmental, Safety,<br />
Medical & Production Offices
Safety & Health<br />
Training Department<br />
Respirator Fit Test Confined Space Training<br />
Respirator Care Fall Protection
Digital Truck Scale/ Radiation<br />
Detector & Digital Cordless Remote<br />
Crane Scale
Steel Processing Techniques<br />
Stationary Richards Shear<br />
1500 R. Genesis Shear / 385 Cat<br />
75 Cutters / 6 Ft. Torch
2,500 hp Hammer-Mill Shredder<br />
&<br />
Conveyer Separation System
2,500 hp Hammer-Mill Shredder<br />
&<br />
Master Control Station
Processed Steel<br />
Scrap Handling Equipment
Container Transports<br />
Roll Off Trucks Case 821 Forklift
Fuel & Maintenance Trucks<br />
• Fuel – Oil – Lube – Air - Greases
Maintenance Building with Offices
Road Maintenance Equipment<br />
Motor Grader<br />
Dozer<br />
Dust Control Truck
Lifting Cranes
Oil & Water Transports<br />
4 – Vac. Trucks
Center Slip / Winch
West Slip / Winch
<strong>ESCO</strong>’s Self-Contained Cutting Pads<br />
Total of 10 Cutting Pads
East Slip & Support Offices
NON-Ferrous Department<br />
Loading Dock
3000 psi High Speed Bailer<br />
40 tons per day
Oil & Water Separator<br />
Flood Alarm System<br />
Separator Unit<br />
Digital TPH Meter<br />
Clarifier/Processed Water Tanks
PCB & Mercury Hazmat<br />
Storage Area
Vessel Make-Ready Equip.
PCB Paint Removal Process<br />
• Process Containment<br />
• 40,000 PSI Water Blaster<br />
• Processed water disposal tank<br />
• Solid paint flake collected,<br />
bagged, placed into container
Pre Cable & Post Copper
Electrical Cable Chopper / Copper<br />
Recovery Processor
2 - Vectors – 1400 CFM Air Movers<br />
Dry & Wet Material removal
1st - Lunch Room-Climate Controlled<br />
• Filtered Drinking Water &<br />
Ice<br />
• Hand Washing Station<br />
• Decon Area<br />
• Eating Facilities
2nd - Lunch Room-Climate Controlled
Shower / Decon Area
Clean / Dirty Rooms
Uniform - Laundry Room<br />
Lead Program
Processed Scrap Ready for Market
Scrap Barge Load Out
<strong>ESCO</strong> Sales Division
<strong>ESCO</strong> Metals –1 of 3 Feeder<br />
Yards<br />
<strong>ESCO</strong> has 3 separate feeder yards, located in Donna, Tx., Brownsville,<br />
Tx., & Matamoras, Mexico. The three feeder yards supply <strong>ESCO</strong> <strong>Facility</strong><br />
with materials for shredding ops., Non Ferrous ops., and Sheering ops.
Special Projects<br />
• Ex-Albert Watts: Dolphin Island Mobile, AL<br />
Remediation/Dismantlement While Afloat<br />
• Ex-Oriskany: Pensacola, FL Remediation and<br />
Sinking of Largest Man-Made Artificial Reef<br />
• Hwy 90 Bridge: St. Louis Bay, MISS<br />
Removal of Hwy Bridge Damaged by Hurricane<br />
Katrina
Special Projects Continued<br />
• Harrah’s Casino: Lake Charles, LA<br />
Remediation and Demolition of Hurricane<br />
Damaged Casinos<br />
• USCG Shrimp Boat Salvage: Gulf Coast<br />
Salvage of Hurricane Damaged Shrimp Boats<br />
• Lone Star Brewery: San Antonio, TX<br />
Asbestos Remediation and Demolition of<br />
Internal Process Controls
Special Projects continued<br />
• Texas Clipper: Brownsville, Texas<br />
Remediation & Sinking of Artificial Reef .<br />
• Zeus Drilling Rig: Freeport, TX<br />
Dewatering/Repair and Remediation of all Tanks
Oriskany Sink<br />
ZEUS Platform<br />
Special Projects<br />
Texas Clipper Sink<br />
Prep