12.07.2015 Views

02441 Microtunneling

02441 Microtunneling

02441 Microtunneling

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.1 MICROTUNNELING OF CASING PIPEA. Measurement: By linear foot of casing pipe installed in place as shown on Drawingsmeasured horizontally along the centerline of tunnel between interior face of the jackingpits to the interior face of receiving pits.B. Payment: At unit price per linear foot listed in Bid Schedule.1. Payment includes labor, materials, tools and equipment, excavation and backfilloutside the limits of the normal trench width, disposal of excess excavated material,receiving and jacking pits, casing pipe, necessary grouting, bulkheads at each end onthe casing pipe, subsurface settlement indicators, settlement markers, and other workinvolved in the <strong>Microtunneling</strong> of casing pipe following Contract Documents.2. Carrier pipe installed inside the casing pipe will be measured and paid for asdescribed elsewhere in specifications.**WSSC**<strong>02441</strong>-10 July 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!