12.07.2015 Views

Towards 2016 - Department of Taoiseach

Towards 2016 - Department of Taoiseach

Towards 2016 - Department of Taoiseach

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Energy PolicyNational Energy Efficiency AwarenessAn Energy Efficiency Action Plan was published for consultation, going beyond the energy end useand services directive target for <strong>2016</strong> by putting in place a target <strong>of</strong> 20% energy efficiency for thewhole economy for 2020, with a higher exemplar <strong>of</strong> a 30% target for the public sector.The Irish Energy Research CouncilThe Council is working on a Research Strategy for Ireland (2008 – 2013) which it expects to submit tothe Minister early in 2008.Renewable EnergyThe Bi<strong>of</strong>uels Mineral Oil Tax Relief Scheme produced 22m litres <strong>of</strong> bi<strong>of</strong>uel to end <strong>of</strong> November 2007and the Government has extended the 50% VRT relief on Flexible Fuel Vehicles, to 30 June, 2008 atwhich point the revised VRT scheme based on CO2 emissions will be implemented.The <strong>Department</strong> is currently finalising a bi<strong>of</strong>uels obligation consultation paper which will provide along-term market based framework for the development <strong>of</strong> a bi<strong>of</strong>uels sector and delivery <strong>of</strong> 2010 and2020 bi<strong>of</strong>uel targets.The grants programme for Combined Heat and Power (CHP) will enable businesses, schools andhospitals to receive grants for the installation <strong>of</strong> biomass-fuelled and anaerobic digestion CHP units.Electricity Interconnector between Ireland and WalesIn December 2007, the Minister announced that he will introduce priority legislation early in 2008 toallow EirGrid to construct, own, operate and maintain the interconnector.EirGrid has obtained a formal connection <strong>of</strong>fer from the UK National Grid located in Wales. Work ona marine survey to determine the most suitable route for the undersea cable has also commenced.EirGrid issued an Invitation to Negotiate document for the design and construction <strong>of</strong> theinterconnector.All-Island Single Wholesale Electricity MarketOn 12 November, 2007, the new all-island market was formally launchedAll-Island Gas MarketEnd 2007 saw work commence by the two <strong>Department</strong>s North and South and the Regulators, on anumber <strong>of</strong> short term actions set out in the Government’s Energy Policy Framework in order toprogress the delivery <strong>of</strong> an all-island gas market.TelecommunicationsPhase II <strong>of</strong> the Metropolitan Area Network (MANs)Phase II <strong>of</strong> the MANs programme is currently underway with 37 networks constructed and underconstruction in another 29 towns.National Broadband Scheme (NBS)The competitive dialogue process is now underway with the estimated timescale for the award <strong>of</strong> theNBS contract being quarter two <strong>of</strong> 2008, with rollout <strong>of</strong> the services due to begin as soon as possiblethereafter.Education and TrainingMeasures under the Delivery Equality <strong>of</strong> Opportunity in Schools (DEIS) action plan includedexpansion <strong>of</strong> literacy programmes such as Reading Recovery for schools and the commencement <strong>of</strong> thefamily literacy project. In addition, almost €19m in financial supports was allocated to schools underthe DEIS initiative for the 2007/08 school year.4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!