12.07.2015 Views

Flood protection. - Steelcom

Flood protection. - Steelcom

Flood protection. - Steelcom

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The TKR aluminum stop log system consists of alimited number of standardized parts and can beused as a barrier wall, dike opening and building<strong>protection</strong>.Stop log/gasketland-sideMiddle supportIt consists of the following elements:Stop logsColumns with or without backstaysCorner supportClamping deviceswater-sideAnchor platesBottom seal if requiredTKR aluminum stop log systemsTKR aluminum stop log systems are available inseveral profile sizes.The TKR 1 system is based on the use of standardDIN profiles for the stop logs and columns and cantherefore be varied to suit local conditions.ationThe stop logs and columns are made of aluminumprofiles. Specially developed seals made of EPDMVertical bracing is by means of wedges made ofimpact-resistant plastic, and horizontal bracing bymeans of a threaded clamping device.material ensure the system remains watertight. TheEPDM material is weather-resistant, robust andresistant to aggressive chemicals. All componentsare designed for long life.The TKR 2 system consists of specially fabricatedaluminum profiles for the stop logs and columns invarious sizes offering high efficiency of materialusage and a continuously lockable clamping device.Innovative technologyfor the future100200TKR1 | stop log200x100x4203TKR aluminum stop log system TKR 2Stop log load diagramFlow rate 1.0 m/s, approach angle 15°, material EN AW-6060[Al MgSi] T66 (DIN Al MgSi0.5) incl. deformation allowance at l/150,not including wave pressure5.004.504.00<strong>Flood</strong> heightLoad case 1:Water & current pressureUnderground sealing by sheet piling1003.50Relevant stop logAdvantages at a glanceTKR 2 | Sh 200150225<strong>Flood</strong> height [m]3.002.502.000.50 m<strong>Flood</strong> heightLoad case 2:Water & current pressure +impact loadRelevant stop logUnderground sealing by sheet pilingNo obstruction of traffic or viewsin normal conditionsTKR 1 | stop log225x150x7x41.50Unlimited life under favorable storage conditionsLimited capital tie-up and minimum maintenancerequirements compared with other systemsGuaranteed high reliability150253TKR 2 | Sh 2501.000.50TKR 2 | Sh 200TKR 2 | Sh 250TKR 1 | stop log200x100x4TKR 1 | stop log225x150x7x4Load case 1 relevantLoad case 2 relevant0.002.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00Stop log length [m]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!