12.07.2015 Views

The Development and Implementation of a Practical Building ...

The Development and Implementation of a Practical Building ...

The Development and Implementation of a Practical Building ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Healthcare Facilities Management Conference 2012Data ManagementInformation flow<strong>The</strong>re was a large amount <strong>of</strong> information to be gathered<strong>and</strong> collated. To do this an efficient system was required.<strong>The</strong> distribution <strong>of</strong> printed sheets to manage <strong>and</strong> compilethe data was deemed unsuitable because;– We would end up with twelve sheets for each <strong>of</strong> our134 buildings. Two sheets per six trades.– This would give us a total <strong>of</strong> 1608 pages to bemanually entered into our master sheets.– <strong>The</strong> cost <strong>and</strong> time involved in this would be prohibitive.Data Management.Information flowTo manage the large amount <strong>of</strong> data all information wasprovided to the contractors on a memory stick.This memory stick contained 134 files, each with the twopages required to audit each building.<strong>The</strong> files were created on the memory stick prior todistribution to maintain control over file naming.<strong>The</strong> result <strong>of</strong> this was that data entry became a quickprocess <strong>of</strong> copy <strong>and</strong> paste.15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!