12.07.2015 Views

ERTMS/ETCS RAMS Requirements Specification Chapter 2 - RAM

ERTMS/ETCS RAMS Requirements Specification Chapter 2 - RAM

ERTMS/ETCS RAMS Requirements Specification Chapter 2 - RAM

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EEIG <strong>ERTMS</strong> Users Group2.2.3.1 Acceptance Criteria2.2.3.1.1 Reliability Acceptance CriteriaThe reliability acceptance is conditioned to the adequacy of the <strong>RAM</strong> ValidationReport, issued by the Validation Team, which purpose is to document thesuccess, or the unsuccess, of the Reliability Demonstration Tests or of thedocumental proof, where applicable, as stated in the <strong>ERTMS</strong>/<strong>ETCS</strong> Test<strong>Specification</strong>.The Reliability Demonstration Tests shall be considered as successful if thefollowing conditions are respected:® the <strong>ERTMS</strong>/<strong>ETCS</strong> Qualitative Mission Reliability Targets defined at §2.2.2.2.1. and the Quantitative Mission Reliability Targets defined at §2.2.2.2.2., § 2.2.2.2.3. and § 2.2.2.2.4. are fulfilled;® all the <strong>ERTMS</strong>/<strong>ETCS</strong> equipment have been operated in the specifiedconditions (as defined in § 2.2.1.1., § 2.2.1.2., § 2.2.1.3. and § 2.2.1.4.2.) forthe specified testing time.The documental proof shall be considered as successful if also all the relevantconditions stated in the Test <strong>Specification</strong> are fulfilled.If the Reliability Demonstration Test or the documental proof, where applicable,are unsuccessful, the Validation Team will identify the responsibility of the nonconformityand will require appropriate corrective actions.In case the responsibility is recognised in the system operator activity, forinstance due to wrong or missing preventive maintenance, any intervention of theContractor is required and the relevant corrective actions shall be responsibility ofthe system operator.Otherwise, the Contractor responsible for the system provisioning shall require tothe appropriate Sub-Contractor(s)/Supplier(s) and, if necessary, shall perform,appropriate modifications able to improve the System Reliability for complyingwith the specified targets.Doc. Ref.: 02s1266- page 32/83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!