<strong>Overall</strong> <strong>planning</strong><br />

<strong>Transrapid</strong> <strong>Berlin</strong> - <strong>Hamburg</strong> <strong>maglev</strong> <strong>train</strong><br />

<strong>Section</strong> G2 Schleswig-Holstein<br />

<strong>Transrapid</strong> <strong>maglev</strong> <strong>train</strong> (test site in Emsland)<br />

This <strong>maglev</strong> line, with a total length of<br />

291 km, is planned to run from <strong>Hamburg</strong><br />

to <strong>Berlin</strong> through the federal states of<br />

Schleswig-Holstein, Mecklenburg-Western<br />

Pomerania and Brandenburg. Passenger<br />

<strong>train</strong>s will reach a speed of 450<br />

km/h and travel non-stop or with a single<br />

stop in Schwerin, cutting the journey time<br />

from <strong>Hamburg</strong> to <strong>Berlin</strong> from three hours<br />

to one hour.<br />

The total costs for the project, which was<br />

planned from 1994 to 2000, are estimated<br />

at 4,9 billion Euros, whereby the track<br />

and stations would cost 3,05 billion Euros,<br />

the remaining ca. 1,85 billion Euros<br />

for systems technology and vehicles.<br />

<strong>Hamburg</strong><br />

main station<br />

Altona<br />

<strong>Hamburg</strong><br />

Moorfleet station<br />

Harburg<br />

Lower Saxony<br />

14,5<br />

10,0<br />

Barsbüttel<br />

Substation Öjendorf<br />

20,0<br />

Reinbek<br />

Bergedorf<br />

Trittau<br />

Schleswig-Holstein<br />

Schwarzenbek<br />

The <strong>Transrapid</strong> <strong>maglev</strong> was the first major<br />

“private public partnership” project in<br />

Germany. A large number of public and<br />

private institutions were involved.<br />

Among other tasks, Krebs und Kiefer<br />

was responsible for the outline design<br />

<strong>planning</strong> and for the production of the<br />

public <strong>planning</strong> procedure documents<br />

(authorization <strong>planning</strong>) in the Schleswig-Holstein<br />

section. Its activities included<br />

object <strong>planning</strong>, structural design,<br />

coordination of equipment <strong>planning</strong>, project<br />

support, cost and schedule <strong>planning</strong><br />

as well as support for public relations<br />

work and for the public hearings procedure.<br />

Mölln<br />

Substation Elmenhorst<br />

60,1<br />

Zarrentin<br />

30,0 40,0 50,0 60,0<br />

70,0<br />

Geesthacht<br />

Büchen<br />

Mecklenburg-Western Pomerania<br />

Course of the line in Schleswig-Holstein in close proximity to the A 24 motorway<br />

Wittenburg<br />

Owner<br />

FWG Magnetschnellbahn<br />

Fahrweggesellschaft mbH<br />

Client<br />

MPG Magnetschnellbahn<br />

Planungsgesellschaft mbH<br />

Processing period<br />

1996 - 2000<br />

Construction costs<br />

Ca. 500 million EUR<br />

(Schleswig-Holstein section<br />

only)<br />

Project data<br />

Schleswig-Holstein section<br />

only:<br />

- New two-lane <strong>maglev</strong> track<br />

(length 45 km) parallel with<br />

the A 24 motorway<br />

- 25 km elevated section<br />

- 20 km at ground level or in<br />

cuttings<br />

- Maglev flyover at <strong>Hamburg</strong><br />

Ost motorway junction<br />

- Maglev overpass at<br />

Billetal<br />

- Maglev flyover over<br />

A 24 at Hornbek<br />

- Maglev overpass over<br />

Elbe-Lübeck-canal<br />

- Numerous road crossings<br />

- Energy supply substation<br />

- Road/rail transfer facility for<br />

construction logistics<br />

<strong>Transrapid</strong><br />

1/2


www.kuk.de<br />

<strong>Overall</strong> <strong>planning</strong><br />

<strong>Transrapid</strong> <strong>Berlin</strong> - <strong>Hamburg</strong> <strong>maglev</strong> <strong>train</strong><br />

<strong>Section</strong> G2 Schleswig-Holstein<br />

In addition to the pure <strong>planning</strong> tasks, a<br />

main focus of the project was on coordination<br />

and management. Many expert reports<br />

and results of specialist <strong>planning</strong><br />

work, e.g. on geology, hazardous waste,<br />

environmental impact, noise and vibrations,<br />

technical equipment of the line,<br />

energy supply and temporary measures<br />

for construction logistics purposes were<br />

integrated and matched during numerous<br />

meetings in order to ensure seamless<br />

<strong>planning</strong>.<br />

An important prerequisite for the construction<br />

of a successful high-tech transportation<br />

facility is the choice of the best<br />

possible route layout. For this purpose,<br />

Krebs und Kiefer evaluated aerial photos<br />

of the terrain which had been transformed<br />

into a digital terrain using the latest<br />

computer technology.<br />

Existing settlements, buildings and infrastructure<br />

were taken into consideration<br />

in the <strong>planning</strong> process, as were environmental<br />

and cost criteria, in order to identify<br />

the best position for the new line which<br />

was to be in close proximity to the existing<br />

A24 motorway. As a result, the line<br />

crosses the motorway in two places at a<br />

very oblique angle.<br />

The large numbers of traffic routes crossing<br />

the line make high demands on the<br />

<strong>planning</strong> and construction of the required<br />

civil engineering structures. In the<br />

Schleswig-Holstein section, the two flyovers<br />

over the motorway, the Billetal bridge<br />

(needed to cross the Billetal nature reserve<br />

and flora and fauna habitats in the<br />

area) and the bridge over the Elbe-<br />

Lübeck canal are of special interest.<br />

For these structures, difficult structural<br />

and construction issues (deformation limits,<br />

poor subsoil) have to be solved and<br />

demanding requirements on design,<br />

cost-effectiveness and environmental acceptability<br />

must be fulfilled.<br />

Informing the public about the progress<br />

of the <strong>planning</strong> process is another important<br />

factor in successful project management.For<br />

this purpose, the <strong>planning</strong> documents<br />

are sent to the affected rural dis-<br />

The <strong>Transrapid</strong> as a long-distance <strong>maglev</strong> <strong>train</strong> for Deutsche Bahn AG<br />

BAB 24<br />

Richtung Towards <strong>Hamburg</strong> Richtung Towards <strong>Berlin</strong><br />

Cross-section of the <strong>maglev</strong> overpass over the Elbe-Lübeck canal<br />

tricts, towns/villages and relevant authorities,<br />

and many public information<br />

events held locally. This gives all the affected<br />

parties the opportunity to find out<br />

about the project at an early stage, which<br />

helps to optimize the handling of the authorization<br />

process. The results from this<br />

preparatory project agreement phase<br />

are integrated into the outline design<br />

<strong>planning</strong> and the public <strong>planning</strong> procedure.<br />

Krebs und Kiefer's <strong>planning</strong> work also includes<br />

support for the public <strong>planning</strong> procedure.<br />

All objections are documented,<br />

analyzed and addressed individually<br />

using a special objection processing system.<br />

Krebs und Kiefer took part in the hearings<br />

and explanatory meetings, preparesfor<br />

these and provided support for the<br />

preparation of the public <strong>planning</strong> decisions.<br />

Witzhave<br />

Printing works<br />

Axis of the <strong>maglev</strong> line at km 25,96<br />

Noise protection<br />

and retaining wall<br />

(absorbing)<br />

Cross-section of the <strong>maglev</strong> line at Witzhave<br />

4,00<br />

5,10<br />

Noise and safety<br />

wall (absorbing)<br />

Existing noise<br />

protection wall<br />

Axis Streckenachse of the <strong>maglev</strong> MSB-km line at km 49,90 49,90<br />

Krebs und Kiefer services<br />

- <strong>Overall</strong> <strong>planning</strong><br />

- Object <strong>planning</strong>:<br />

- <strong>maglev</strong> facilities<br />

- road facilities<br />

- road/rail transfer facilities<br />

- civil engineering structures<br />

- Structural design of civil<br />

engineering structures<br />

- Coordination of all specialist<br />

planners<br />

- Public relations work<br />

- Route layout selection<br />

process<br />

- Outline design <strong>planning</strong><br />

- Partial cost estimates<br />

- Preparatory agreements<br />

on the project<br />

- Authorization <strong>planning</strong><br />

- Support for the public<br />

<strong>planning</strong> process<br />

BAB 24<br />

Towards <strong>Hamburg</strong> Towards <strong>Berlin</strong><br />

Option:<br />

expansion<br />

to 6 lanes<br />

2/2