12.07.2015 Views

Understanding Differences in Harmonic Restraint and Harmonic ...

Understanding Differences in Harmonic Restraint and Harmonic ...

Understanding Differences in Harmonic Restraint and Harmonic ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

100restra<strong>in</strong>t, the difference between the red curve black curve is ⋅ I op 2nd, , as wePCT 2can see from <strong>in</strong>equality (14). Per <strong>in</strong>equality (14), the actual differential slope is25 100*0.075+ = 75% if the actual 2 nd harmonic is 7.5%. The blue operat<strong>in</strong>g curve100 15is associated with 15% of 2 nd harmonic ratio. The slope is calculated to be 125% fromequation (14) if the actual 2 nd harmonic ratio is 15%.In Figure 4, only the 2 nd harmonic component is used <strong>in</strong> the harmonic restra<strong>in</strong>t. If the4 th harmonic restra<strong>in</strong>t is enabled with the 2 nd harmonic component, the slope of theoperat<strong>in</strong>g curve would be raised more significantly. In an energization event, theharmonic ratios fluctuate slightly. The actual operat<strong>in</strong>g curve changes dynamicallywith the actual calculated harmonic ratios.We have studied <strong>and</strong> illustrated the difference between harmonic restra<strong>in</strong>t <strong>and</strong>harmonic block<strong>in</strong>g <strong>in</strong> transformer differential protection. It is important to underst<strong>and</strong>the difference when we set transformer differential protection.V. Analysis of transformer differential eventsLet us review the event we <strong>in</strong>troduced section II. The recorded related SCADA eventsare listed <strong>in</strong> Table 1.Table 1: Recorded SCADA eventsDate <strong>and</strong> TimeOperation10/21/2008 7:06:58 AM BT1-2 Breaker Closed by Operator10/21/2008 7:07:42 AM TR1 34.5kV Breaker Opened byOperator10/21/2008 7:08:18 AM 115kV 5X148 Breaker Opened byOperator10/21/2008 7:08:50 AM 115kV 5X150 MOD Opened byOperator10/21/2008 7:09:35 AM 115kV 5X148 Breaker Closed byOperator10/21/2008 7:09:35 AM 115kV 5X148 Breaker Opened10/21/2008 7:09:35 AM TR2 34.5kV Breaker Opened10/21/2008 7:29:53 AM TR2 34.5kV Breaker Closed byOperator10/21/2008 9:02:03 AM 115kV 5X148 Breaker Closed byOperator10/21/2008 9:02:32 AM TR1 34.5kV Breaker Closed byOperator10/21/2008 9:02:12 AM BT1-2 Breaker Opened by Operator

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!