12.07.2015 Views

IAM at PMV: Past, Present, Future & Lessons Learned - staging.files ...

IAM at PMV: Past, Present, Future & Lessons Learned - staging.files ...

IAM at PMV: Past, Present, Future & Lessons Learned - staging.files ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>IAM</strong> <strong>at</strong> <strong>PMV</strong>:<strong>Past</strong>, <strong>Present</strong>, <strong>Future</strong> &<strong>Lessons</strong> <strong>Learned</strong>Mo MofradGary Toshp o r t m e t r o v a n c o u v e r.c o m


<strong>PMV</strong>’s <strong>IAM</strong> History• Start: 2009• Port-owned asset definition and identific<strong>at</strong>ion• A two year process• <strong>Lessons</strong>• Background d<strong>at</strong>a: ownership, drawings, inspections,photos, etc.• Scope definition: Wh<strong>at</strong> m<strong>at</strong>ters to your Port?• Docks, Roads, Buildings, Services, less/more?• Relax, d<strong>at</strong>a will always be missing; 80/20 rule• Fixed Asset Ledger: useful but beware, new assetsvs. upgradesp o r t m e t r o v a n c o u v e r.c o m


<strong>PMV</strong>’s <strong>IAM</strong> History• 730 assets in 14 asset classes• D<strong>at</strong>a recorded in Excel for eventual d<strong>at</strong>abase• Lesson: Consult departments for their d<strong>at</strong>a needs• Baseline inspection performed for each asset• Inspected in-person or by ‘table-top’ Q&A• Lesson: Consistency• Five-year plan for in-depth inspections• Based: age, inspection history and critical n<strong>at</strong>ure.• Lesson: Review after inspections, alter as requiredp o r t m e t r o v a n c o u v e r.c o m


<strong>PMV</strong>’s <strong>IAM</strong> History• Functional Requirements for <strong>IAM</strong> software• Wh<strong>at</strong> affected departments need, should and wantto see from AM software• Lesson: Google• 98% of <strong>PMV</strong> assets in GIS• Searchable by unique Asset ID• To come: Baseline condition r<strong>at</strong>ing (VG, G, F, P, VP)• Lesson: Goal <strong>at</strong>tained? show it off.• <strong>IAM</strong> Directive• Draft completed• For program success, AM cannot be optional.p o r t m e t r o v a n c o u v e r.c o m


<strong>PMV</strong>’s <strong>IAM</strong> <strong>Present</strong> & <strong>Future</strong>• Gap Analysis• Issue: Asset inform<strong>at</strong>ion sharing within <strong>PMV</strong>• Multiple dept’s acquire/maintain/divest assets• Goal: Identify inform<strong>at</strong>ion gaps and recommendnew processes between key departments whoacquire/maintain/divest infrastructure assets• GIS-centered <strong>IAM</strong> Software• Existing asset loc<strong>at</strong>ions (macro)• Deficiency/Issue loc<strong>at</strong>ions within the asset (micro)• Hyperlinked drill-down for as-built drawings, photos,report details, etc.• Loc<strong>at</strong>ion referencing for consistent future inspectionsp o r t m e t r o v a n c o u v e r.c o m

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!