12.07.2015 Views

Mt Isa System Information Pack - Issue 2.1 - May ... - Queensland Rail

Mt Isa System Information Pack - Issue 2.1 - May ... - Queensland Rail

Mt Isa System Information Pack - Issue 2.1 - May ... - Queensland Rail

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tab l e o f C o n t e n t sINTRODUCTION 5GENERAL INFORMATION 6GENERAL CLIMATE 6Cyclones 7Humidity 7Rainfall 7Temperatures 7WEATHER MONITORING SYSTEM 8DESCRIPTION OF THE RAILWAY 8Axle Loadings 8Basic Track Configuration 8Stuart to Hughenden (377 km) 9Hughenden to Flynn (492 km) 10Flynn to <strong>Mt</strong> <strong>Isa</strong> (98 km) 11Flynn to Phosphate Hill (66 km) 12DESCRIPTION OF THE TRACK 13OPERATIONAL CONSTRAINTS - INFRASTRUCTURE 14TRACKSIDE DETECTION EQUIPMENT 14Dragging Equipment Detectors (DED) 14Hot Box / Hot Wheel Detectors (HBD/HWD) 14Axle Counters 14WEIGHBRIDGES / TRAIN WEIGHING 15INFORMATION SYSTEMS 15OPERATIONAL SYSTEMS & TRAIN CONTROL 15OPERATIONAL CONSTRAINTS - ROLLINGSTOCK 16COMMUNICATIONS 16SECTIONAL RUNNING TIMES 17INCIDENT RECOVERY TIME and MANAGEMENT 17RAIL / ROAD INTERFACES 18MT ISA SYSTEM INFORMATION PACKISSUE <strong>2.1</strong> DATE - MAY 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!