12.07.2015 Views

GPS Navigation System Generation 4 - Lexus Drivers

GPS Navigation System Generation 4 - Lexus Drivers

GPS Navigation System Generation 4 - Lexus Drivers

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

constructed section of US-93 at Exit 2 to the Hoover Dam has been changed to NV-172 anddowngraded from Road level(s) 1 to Road level(s) 5.• Additional names and addresses were added in Elko County.• Additional names and addresses were added in Humboldt and Lander counties.• Additional names, addresses, and roads were added in numerous counties in Nevada as partof upgrading rural counties.• An exit ramp was added from eastbound US-95 to S Martin L King Boulevard in Clark County.• City Parkway was added to the database in Clark County, replacing D Street. The new roadconnects exit 43 of northbound I-15 to W Bonanza Road.• I-15 Express Lane (Road level(s) 1) was added between E Desert Inn Road and W RussellRoad in Clark County.• Ramps were modified at the intersection of CR-215 and Far Hills Avenue in Clark County.• Scenic route named Las Vegas Boulevard Scenic Route was added in Nevada.• The Las Vegas City Center project in Clark County was updated, including the addition ofroads and Points of Interest.• US-395 was extended from US-50 to Fairview Drive in Carson City. Fairview Drive wasupgraded to Road level(s) 2 between S Carson Street and US-395. N/S Carson Street wasdowngraded to Road level(s) 4 between US-395 and Fairview Drive. E Williams Street wasalso downgraded to Road level(s) 4 between US-395 and N Carson Street.• US-95 was changed to Multi-lane between Airport Road and Loran Station Road and betweenKidwell Hanger Road and Palm Gardens Drive in Clark County.• W Galleria Drive was changed to Multi-lane and Road level(s) 4 between N Stephanie Streetand N Gibson Road in Clark County. An interchange between I-515 and W Galleria Drive wasalso added.• Walkways were included for parks in Las Vegas. Additional navigable roads were added whenrequired for connectivity of the walkways.• New Hampshire:• Additional names and addresses were added in Grafton County.• Additional names, addresses, and roads were added in Coos and Sullivan counties in NewHampshire as part of upgrading rural counties.• Adjusted roads along 1-293/Everett Tpke which also included the adjustment of Exit 5 rampsand the addition of turn lane roads.• E911 Addressing was completed in New Hampshire as part of ongoing maintenance.• Entrance ramp at I-93 Exit 5 has been reconfigured to more accurately reflect reality inRockingham County.• Exit 12 ramps on Spaulding Turnpike were adjusted in Strafford County. The ramps weremodified due to ongoing construction for multi-lane expansion on this highway. Constructionwill continue to be monitored in this area.• I-93 Southbound Exit 5 on and off ramps in Londonderry, Rockingham County werereconfigured to reflect new construction.• Moved hamlet POI for Willey House to a more accurate location and added Willey HouseHistorical Site as a tourist attraction POI in Carroll County.• New separately digitized high speed toll lanes and toll structures were added to I-95 inRockingham County. These are EZ Pass Lanes that allow drivers to pass at higher speeds

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!