12.07.2015 Views

GPS Navigation System Generation 4 - Lexus Drivers

GPS Navigation System Generation 4 - Lexus Drivers

GPS Navigation System Generation 4 - Lexus Drivers

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• I-520 has been upgraded to Road level(s) 2 from GA-121 in Georgia to previous terminus atUS-1 in Aiken County, SC.• Municipal city boundaries were updated in Aiken, Beaufort, Charleston, Lancaster, Lexington,and Sumter counties.• Municipal city boundaries were updated in Greenville and Richland counties.• N Pleasantburg Dr has been upgraded from single to multi-lane between Lowndes Hill Rd andVilla Rd in Greenville County.• New exit ramps and roads has been added at Robert Edge Parkway on SC-31 in Horry County,SC.• SC-343 has been updated from multi-lane to single-lane in Florence County, SC.• SC-5 has been upgraded from single to multi-lane between McGill Hwy and Cedar Grove Rd inYork County• SC-68 has been upgraded to a multi-lane road between Jackson St and Murry Dr in HamptonCounty.• Scenic route named Edisto Island National Scenic Bywy was added in South Carolina.• The following four Rest Area POIs will remain closed indefinitely and have been deleted: milemarker 89 on I-85 southbound in Cherokee County, SC, mile marker 202 on I-26 westbound inBerkeley County, SC, and mile marker 171 on I-95 north and southbound in Florence County,SC.• The roads at the intersection of US-301 and US-378 has been updated in Clarendon County,SC.• The roads of the ramps was updated for the interchange of River North Dr and the JeffersonDavis Hwy in Aiken County. An off ramp was added for the north bound side and an on rampwas added to the southbound side.• The polygon for Charleston Southern University has been added in Charleston County, SC.• The Ravenel Caw Caw Interpretive Center (park) polygon and POI have been added inCharleston County, SC• The signage on I-26 was updated at Exits 218 (northbound) and 216B (southbound) to reflectreality. This involved changing the text from 'Naval Base' to 'Federal Complex' in CharlestonCounty, SC.• Tryon Rd has been updated from singly to multi-lane between New Waverly Pl and Keisler Drto Walnut St in Wake County, NC.• US-17 was recently reconstructed and now bypasses the town of Washington and is a Roadlevel(s) 2 road in Beaufort County. The old US-17 is now US-17-BR, and has beendowngraded from a Road level(s) 2 to a Road level(s) 4 road.• W Catawba Ave has been updated from singly to multi-lane between Torrence Chapel Rd andMagnolia Estates Dr in Mecklenburg County, NC.• W Washington St has been upgraded to a multi-lane road between Alston St and Boddie St inHorry County.• South Dakota:• Approximately a three mile stretch of I-90 from Exit 48 in Meade County, SD to the PenningtonCounty line has been Field Verified for new roads, attributes, signs and naming. Thesechanges include a new interchange, Exit 52, at Peaceful Pines Rd and the elimination of Exit51 that used to exist at Foothills Rd and SD-79. Construction continues in this area and will be

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!