12.07.2015 Views

XLC 2nd Stage Service Manual.pdf - Aberdeen Watersports

XLC 2nd Stage Service Manual.pdf - Aberdeen Watersports

XLC 2nd Stage Service Manual.pdf - Aberdeen Watersports

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

12 <strong>XLC</strong> Second <strong>Stage</strong> <strong>Service</strong> & Repair <strong>Manual</strong>CAUTION: Over-adjustment of the orifice crown will causeexcessive spring load in the second stage valve, and mayseverely degrade the performance of the regulator.8. Apply a hand driver with 4" tapered hex to the locknut,through the open port of the box bottom. Turn the locknutclockwise in very small increments of adjustment, only untilthe lever stands at its maximum height; even with the rim ofthe box bottom (see Fig. 15).9. Lightly depress the lever several times to cycle the regulatorand listen closely to check for the return of any leakage, whichmay indicate that the locknut has been over-adjusted. Ifleakage is detected, it is important to return the crown andlocknut to their original preliminary settings, and then repeatsteps 7-8 before proceeding any further.CAUTION: Over-adjustment of the locknut will retract thepoppet from the crown, resulting in leakage past the LP seat.Do not attempt to correct this condition by only readjustingthe crown further in clockwise. Doing so may dangerouslyincrease the opening effort and inhalation resistance of theregulator due to excessive spring load in the second stagevalve.10. When the crown and locknut are properly set with no leaksand the lever is standing at its correct height, turn the valve ofthe air source completely shut, and purge the second stage todepressurize the system. Disconnect the in-line adjustmenttool from the second stage and the LP hose.Final Assembly & Testing1. Install the purge button(2) with decal(1) into the purgecover(3), if it was previously removed, with the logo facingright side up and horizontally straight. Insert the femalefitting of the LP hose through the retaining collar on the leftside of the purge cover for right-handed configuration, orthrough the right side for left-handed (see Fig. 16). For eitherconfiguration, check to ensure that the purge cover will beproperly oriented with the logo facing right side up when it isfitted over the second stage. Slide the purge cover up the hoseso that it doesn’t interfere with the next step.2. Connect the female fitting of the LP hose to the second stageinlet and tighten by hand until finger snug. Apply a torquewrench with n” crow-foot to tighten the IP hose fitting to atorque measurement of 40 inch-lbs (±3).3. Install the O-ring(29) onto the end plug(28), and insert the endplug into the box bottom so that it locks securely in place.4. Fit the sealing ring(4) inside the top of the diaphragm(5), andinstall these together into the box bottom. Check to ensurethat the diaphragm is seated flush on all sides.Fig. 15 – Lever Height Preliminary SettingFig. 16 – Purge Cover Installation© 1999 Aqua Lung America, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!