12.07.2015 Views

Standard Risk Control Arrangements Concrete Operations

Standard Risk Control Arrangements Concrete Operations

Standard Risk Control Arrangements Concrete Operations

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aNo.<strong>Standard</strong> <strong>Risk</strong> <strong>Control</strong> <strong>Arrangements</strong><strong>Concrete</strong> <strong>Operations</strong>Training and Capability29 Rev 04Page 1 of 2A. Those operatives using pokers, tampers and other vibrating equipment must be trained in the <strong>Risk</strong>Assessment and Method Statement, and in the use of the required PPE.B. Those Banksman/Signallers assisting in the reversing of concrete wagons must be trained in the <strong>Risk</strong>Assessment and Method Statement, and in the use of the required PPE.C. All operators of machinery shall be competent<strong>Control</strong> <strong>Arrangements</strong>D. Non porous gloves and clothing will be worn when working with wet concrete to prevent cementburns as per the <strong>Risk</strong> Assessment (refer to SRCA 10).E. Working at Height will be as per the requirements of the Management of Work at Height SM-WI-49.F. CoSHH Assessments will be readily available and followed for any hazardous materials, especiallycementitiousG. Drivers of concrete wagons loading, shall wear the appropriate PPE as SRCA 10 when outside of thecab.H. Reversing concrete wagons loading shall be signalled by a Banksman.I. Site plans shall show designated Wash Down areas.J. Vibrating Equipment must be managed as per the requirements of the Management of Non-OperatedPlant and Tools SM-WI-44.A Balfour Beatty Company© Mansell


aNo.<strong>Standard</strong> <strong>Risk</strong> <strong>Control</strong> <strong>Arrangements</strong>Other Local <strong>Control</strong> <strong>Arrangements</strong>29 Rev 04Page 2 of 2Issues to be Addressed In Inspection Plan1. Setting out2. Mix design approved by engineer3. Clean out formwork prior to concreting4. Test/Check on delivery - test cubes5. Expansion/Construction joints6. Surface FinishA Balfour Beatty Company© Mansell

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!