Electronic Service Report Single entry of information - Innosoft GmbH
Electronic Service Report Single entry of information - Innosoft GmbH
Electronic Service Report Single entry of information - Innosoft GmbH
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Steffen Schmidt – 25 Juni 2009<br />
Robotics<br />
Customer <strong>Service</strong><br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 1
Robotics<br />
ABB Overview<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 2
Facts about ABB<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 3<br />
� Headquarters: Zurich, Switzerland<br />
� About 120,000 employees in around 100 countries<br />
� Listed on Stockholm, Swiss and New York exchanges;<br />
traded on SWX Europe
What we <strong>of</strong>fer:<br />
Divisional structure and portfolio<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 4<br />
Power<br />
Products<br />
Power<br />
Systems<br />
Automation<br />
Products<br />
Process<br />
Automation<br />
Robotics<br />
34,000<br />
employees<br />
16,000<br />
employees<br />
36,000<br />
employees<br />
27,000<br />
employees<br />
5,000<br />
employees<br />
2008 employees per division<br />
Range <strong>of</strong> ultrahigh to medium voltage<br />
products; distribution automation<br />
products; transformers<br />
Electrification and control for power<br />
generation; transmission grid solutions;<br />
substations; network management<br />
Low-voltage products, drives, motors,<br />
power electronics and instrumentation<br />
Control systems and application-specific<br />
automation solutions for process<br />
industries<br />
Robots, peripheral devices and modular<br />
manufacturing solutions for industry
Robotics division<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 5<br />
Markets served<br />
� Automotive and their Tier 1 suppliers<br />
� General industries including foundry, metal fabrication,<br />
plastics, electronics, consumer industries, food &<br />
beverage, machine tools, solar, pharmaceuticals &<br />
chemicals, wood<br />
Key deliverables<br />
� Robots, application equipment and s<strong>of</strong>tware<br />
� Standardized manufacturing cells for material handling,<br />
machine tending, welding, cutting, painting, finishing,<br />
etc.<br />
� Engineering for systems in press automation, body-inwhite,<br />
paint processes, power train assembly<br />
� Product & systems service
Robotics Division<br />
Key facts<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 6<br />
� 2008 Facts<br />
� 5000 employees in over 45 countries<br />
� Headquarters in Shanghai, China<br />
� Manufacturing in Europe, Asia & America<br />
� Sales & service operations in over 45 countries & more<br />
than 100 locations<br />
� Introduced painting robots in 1969 and the worlds first<br />
commercially available electric robot in 1974<br />
� Over 160,000 robots installed worldwide at end 2008
Global service organisation - 1500 Employees<br />
Present in 45 countries - in more than 100 locations<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 7<br />
Americas 289 Europe/MEA 1056 Asia/Pacific 171
Global service; a total lifecycle approach<br />
Based on “Remote <strong>Service</strong>” technology<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 8<br />
Partner Support Package<br />
Maintenance Package<br />
Response Package<br />
Commissioning Life <strong>of</strong> installation<br />
1. Faster ramp-up during commissioning<br />
2. Increased uptime at lower cost:<br />
Warranty Package<br />
� by immediate response and diagnostic in case <strong>of</strong> unplanned stops<br />
� by transforming from preventive to predictive maintenance<br />
3. Robot program back-up, securing business continuity<br />
4. On-line access to robot condition status and reports<br />
Productivity<br />
Improvement<br />
<strong>Service</strong><br />
Agreements<br />
& Training<br />
Traditional<br />
Life-Cycle
<strong>Service</strong><br />
<strong>Service</strong> agreements<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 9<br />
<strong>Service</strong> Agreement Packages <strong>of</strong>fer you measurable results<br />
1. Maintenance Package<br />
� Maximize the Mean Time Between Failures <strong>of</strong> your equipment<br />
2. Response Package<br />
� Minimize the Mean Time To Repair when stoppages do occur<br />
3. Warranty Package<br />
� Control the Total Cost <strong>of</strong> Ownership <strong>of</strong> your investment in robots
<strong>Service</strong><br />
Parts & logistics<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 10<br />
It’s all about the right part in the right place at the right time<br />
� Over 20,000 spare parts available<br />
� Upgrade kits<br />
� Accessibility 24/7<br />
� Inventory management<br />
� SmartSpares<br />
� PartsOnline
<strong>Service</strong><br />
Certified refurbished robots<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 11<br />
� Refurbishment programs for customer<br />
owned equipment<br />
� Large global inventory <strong>of</strong> used robot<br />
systems<br />
� Rebuilt to factory specification - using<br />
original parts
Robotics<br />
Project “3 Day to Invoice”<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 12
Field <strong>Service</strong> Process - Target<br />
“3 Day to Invoice”<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 13<br />
Each country <strong>Service</strong> Organization should send the correct<br />
invoice to the customer<br />
maximum 3 days<br />
after the service job was done.
Why move to a mobile solution?<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 14<br />
� Many companies gained efficiency improvements in field<br />
service processes using mobile technology<br />
� Benchmark <strong>of</strong> 180 companies‘ field service units in high<br />
tech, discrete and process manufacturing as well as utilities<br />
industries using mobile solutions
Current obstacles in the field service process<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 15<br />
� Different processes in each country<br />
� Several systems to manage <strong>information</strong> � Double <strong>entry</strong> <strong>of</strong><br />
<strong>information</strong>, because <strong>of</strong> lacking system connectivity<br />
� Time lag in processing paperwork and sending back the<br />
data: 1-3 weeks<br />
� Additional time lag <strong>of</strong> up to 3 weeks for invoicing<br />
� Lack <strong>of</strong> customer, product and service <strong>information</strong> in the<br />
field<br />
� Lack service history available
Project Objective<br />
Optimizing <strong>of</strong> service job’s<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 16<br />
Call<br />
Handling<br />
Management<br />
� Assure Optimal Field Operation process Optimal Resource<br />
Scheduling<br />
� <strong>Electronic</strong> <strong>Service</strong> <strong>Report</strong>s, paperless Office<br />
� Fast invoicing<br />
Material<br />
Planning<br />
� Tracking Installed Base Development<br />
� Centralized Failure & Route cause analysis – Knowledge<br />
Database<br />
� <strong>Service</strong> Agreement Tracking<br />
Resource<br />
Planning<br />
� Integration <strong>of</strong> IT system landscape<br />
Pre<br />
processing<br />
<strong>Service</strong><br />
job<br />
on-site<br />
Post<br />
processing
Mobile Field <strong>Service</strong> Solution<br />
Workflow Technical Support<br />
Technical <strong>information</strong><br />
Job Evaluation<br />
from Webconfig<br />
Automatic<br />
Invoice<br />
3 days<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 17<br />
Customer<br />
Calls<br />
ERP<br />
SAP<br />
Resource Planning<br />
MFSS<br />
Internet<br />
UMTS<br />
Send Order to FSE<br />
MFSS<br />
•Capture Real Data<br />
•<strong>Service</strong> Job on Site<br />
•Hour expenses<br />
•<strong>Electronic</strong> Signature<br />
MFSS<br />
Failure from Remote <strong>Service</strong><br />
Material <strong>information</strong><br />
From POL<br />
My Robot<br />
PDF to<br />
My robot<br />
<strong>Electronic</strong> <strong>Report</strong>
Major benefits<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 18<br />
� Fast implementation <strong>of</strong> <strong>Electronic</strong> service report, and 3 day<br />
invoice process worldwide<br />
� Implement a common way <strong>of</strong> working<br />
� Transfer <strong>information</strong> real time to FSE<br />
� Increase productivity<br />
� Real Time access for FSE<br />
� Access to Remote <strong>Service</strong> Center<br />
� Eliminate paper<br />
� Create a history per robot<br />
� Differentiate to small companies<br />
� Global Overview <strong>of</strong> Installed Base Dev, service<br />
agreements, Maintenance status, Route Cause analysis
Cost & ROI per standard country<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 19<br />
� Program adaption/training/implementation – one time<br />
� Licenses program modules – one time<br />
� Running costs sum<br />
� Maintenance program modules per year<br />
� central server hardware per year<br />
� Administration & support per year
Status Mobile Field <strong>Service</strong><br />
After 2 year’s preparation<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 20<br />
� GATE 5 prepared<br />
� Review Benefits & costs<br />
� Support model chosen<br />
� Pilot assessment done<br />
� Rollout plan established and agreed<br />
� Roll out checklist & standard delivery documentation<br />
� Maintenance program modules per year<br />
� Standard functions & features established<br />
� SAP interface test phase in Germany ongoing<br />
� Coordination with MSA project ATG/DE using same<br />
functions & interfaces
Standard delivery Mobile Field <strong>Service</strong><br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 21<br />
� Back <strong>of</strong>fice Scheduling<br />
� Order, invoice, contact & technical data<br />
� Pr<strong>of</strong>essional scheduling with / without ERP<br />
� Machine data & technical documents include RSI & notification<br />
� <strong>Service</strong> & address history, part lists, warranty handling<br />
� Mobile client - Technician<br />
� Times (arrival, departure, work times) Travel expenses<br />
� Parts (consumables, return , replaced, tools)<br />
� Standard fault codes according tech. database<br />
� Master data technical & commercial<br />
� Remarks tracking, Last service history, SI (RSI/TSI )<br />
<strong>information</strong><br />
� Standard data forms for common service process<br />
� Back <strong>of</strong>fice Project Management System<br />
� Overview <strong>of</strong> all activities & calls at customer<br />
� Deep technical view <strong>of</strong> installed base
Optimal resource planning<br />
with scheduling tool<br />
Using 80 % <strong>of</strong><br />
standard functions<br />
Notification <strong>of</strong> SE<br />
when schedule<br />
changes occur<br />
Capability to plan &<br />
schedule jobs done by<br />
service teams<br />
P & S <strong>of</strong> internal (not<br />
customer accountable)<br />
jobs<br />
Project oriented tasks<br />
can be planned with<br />
NN-SE<br />
Consideration <strong>of</strong><br />
requests / changes /<br />
job denials made by<br />
Mobile Work<br />
Environment (MWE)<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 22<br />
NN<br />
Consider personal time schedule <strong>of</strong> SE<br />
by P&S s<strong>of</strong>tware<br />
Consider pr<strong>of</strong>essional skills <strong>of</strong> SE by<br />
P&S s<strong>of</strong>tware<br />
Gantt Chart view with drag &<br />
drop functionality for<br />
planning <strong>of</strong> service jobs<br />
supported by<br />
Additional<br />
features' <strong>of</strong><br />
ABB needs are<br />
implemented<br />
•Machine<br />
architecture<br />
•Internal<br />
technical SI<br />
<strong>information</strong><br />
•BackUp<br />
delivery/storage<br />
•OnCall handling<br />
•Warranty<br />
handling<br />
•Special<br />
Notification’s<br />
•Additional<br />
report’s<br />
•Diverse special<br />
view’s
<strong>Electronic</strong> <strong>Service</strong> <strong>Report</strong><br />
<strong>Single</strong> <strong>entry</strong> <strong>of</strong> <strong>information</strong><br />
� On Site Data gathering<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 23<br />
� Working hours<br />
� Spare parts<br />
� Expenses<br />
� Faults<br />
� Open Leads<br />
� <strong>Electronic</strong> Signature<br />
� Wireless transmission <strong>of</strong><br />
report to ABB and Client<br />
� Back <strong>of</strong>fice integration (data from service report is used to<br />
create invoice automatically)<br />
supported by
<strong>Electronic</strong> <strong>Service</strong> <strong>Report</strong><br />
<strong>Single</strong> <strong>entry</strong> <strong>of</strong> <strong>information</strong><br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 24<br />
supported by
supported by<br />
3 Day to Invoic Invoice Key Factors<br />
Statistics Feedback <strong>of</strong> <strong>Service</strong> <strong>information</strong><br />
Day's feedback receipt<br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 25<br />
Count <strong>of</strong> receipts total = 537 target # 69 percentage = 12,85% - mostly long term projects -<br />
Receipt feedback Days Target 3 days<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0
3 Day to Invoice Key Factors<br />
Statistics Absorption <strong>information</strong><br />
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 26<br />
100%<br />
90%<br />
80%<br />
70%<br />
60%<br />
50%<br />
40%<br />
30%<br />
20%<br />
10%<br />
0%<br />
Absorption by week<br />
supported by<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Sum
© ABB Automation <strong>GmbH</strong><br />
August 11, 2009 | Slide 27