12.07.2015 Views

Approval Standard 4991 - FCIA - Firestop Contractors International ...

Approval Standard 4991 - FCIA - Firestop Contractors International ...

Approval Standard 4991 - FCIA - Firestop Contractors International ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>4991</strong> May 20015.2 Facilities and Procedures Audits (F&PA)5.2.1 An initial audit of the contractor’s home office and a job site is part of the <strong>Approval</strong> process. The intentof the audits is to verify the contractor’s quality control program, design selection capabilities, training,transmission of design requirements to field personnel, successful installation, marking of systems andassemblies and handling of non-conformances.5.2.2 Follow-up audits at the home office and at a job site shall be conducted periodically, but at least annually,by FM <strong>Approval</strong>s or its representatives. Additional audits may be conducted based on jurisdictionalrequirements.5.3 Re-Examination5.3.1 The contractor’s Designated Responsible Individual shall be required to pass a written re-examination inaccordance with Para 4.2 every three (3) years. The re-examination may be required sooner if there aresignificant changes to the <strong>FCIA</strong> Manual of Practice or if there is sufficient evidence of poor firestoppingperformance attributable to improper installation or non-conformance with the requirements of this documenton systems and assemblies installed by the contractor.8 FM APPROVALS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!