1Agenda• Introduction• Influencing Parameters• Scenarios• Grid Bottlenecks• Information Demand• OutlookConference Presentation, May 7th 2008


2Introduction to „Vehicle-To-Grid“using „plug-in“-capable electric vehicles as a massivelydistributed storage for grid services such as balancing powerOpportunities:+ in<strong>de</strong>pen<strong>de</strong>ntly controllable+ low risk of failure+ cheap because of double use+ additional energy <strong>de</strong>mandMajor Bottlenecks:- battery capacity- loss of comfort (?)- unknown grid implications- security of communicationAbout 660.000 vehicles could offer morebalancing power (for ~1h) than all Germanpump storage plants.Conference Presentation, May 7th 2008


5Scenario 2020 - PHEVconnection:• bi-directional• ~ 5kWh (100% usable)• 12kW three-phase• 0.4kV 18A• rather <strong>de</strong>central• simultaneity factor<strong>de</strong>pends on usageConference Presentation, May 7th 2008


6Scenario 2030 - BEVconnection:• bi-directional• 20kWh (50% usable)• 24kW three-phase• 0.4kV 34A• <strong>de</strong>central/central• high simultaneity factorConference Presentation, May 7th 2008


7Scenario „Better Place“• exchangeable batteriesconnection fuel station:• 600kW three-phase• 10kV, 35A• 50 batteries @ 12kW• <strong>de</strong>pending on• recharge time• exchange time• number of EVConference Presentation, May 7th 2008


8Scenario „parking lot“• aggregating multiple carsconnection parking lot:• 12MW three-phase• direct bus bar connection,no abrupt changes• 10kV, 700A• max. 1000 cars• <strong>de</strong>pending on• parking time• fluctuation• number of EVConference Presentation, May 7th 2008


9Frequency control via <strong>V2G</strong> vs generator basedadvantages• fast reacting – better frequency stability• reduced strain on generators/pumps• additional load flow management possibledisadvantages• impact on distribution grids• missing real-time capability on MV/LVlevel• missing experience implementing<strong>de</strong>centralised balancing powerConference Presentation, May 7th 2008


11System Perturbation• harmonics (converter)• voltage drop ri<strong>de</strong>-through behavior• power plant features – synchronous motor• advanced grid co<strong>de</strong>s for electric vehicles• three-phase connection, whenever possible• forced infeed @ 49.8 Hz• forced consumption @ 50.2 Hz• power flow control at secondary substation (?)• „slow“ charching characteristicsConference Presentation, May 7th 2008


12Desired Information for Aggregator• battery load• charching characteristic• min./max. charching power• min./max. discharching power• location• estimated parking time• user behavior (discrete types?)• „provi<strong>de</strong>r“• prefered state of charge• ecological aimsConference Presentation, May 7th 2008


13Outlook: <strong>V2G</strong> as part of a Future Energy NetworkIntegrated Energy Supply Concepts (Power, Heat, Mobility)based on innovative Information Technology+ real-time capable+ self-<strong>de</strong>scribing, self-controlling, self-adjusting, selfstabilizingand self-healing+ efficient use of energy supply structures leads to reducedinvestment and operating costs+ new business mo<strong>de</strong>ls based on customer <strong>needs</strong> insteadof energy carrier- multi-carrier-concepts are still in an early stage of<strong>de</strong>velopment- changes in infrastructure are long term investments- unknown emergence featuresConference Presentation, May 7th 2008


14Thank you!Conference Presentation, May 7th 2008


16Technical RequirementsBattery-EV• grid connection alreadyimplemented (for charging), has tobe improved to bi-directional• secure communications link• battery already sufficientHybrid-EV• conversion to „plug-in-hybrid“necessary• bi-directional connection• secure communications link• battery <strong>needs</strong> higher capacity(>10 kWh)Conference Presentation, May 7th 2008


18Regelreserve in DeutschlandRWE negativ-1000 -800 -600 -400 -200 0181614121086420Conference Presentation, May 7th 2008