12.07.2015 Views

(TENDER NO: CDR 16 BRTF/02/2013-14) - Bro.nic.in

(TENDER NO: CDR 16 BRTF/02/2013-14) - Bro.nic.in

(TENDER NO: CDR 16 BRTF/02/2013-14) - Bro.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 1<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>GENERAL RESERVE ENGINEER FORCEBORDER ROADS ORGANISATION<strong>16</strong> BORDER ROADS TASK FORCE, C/O 56 APO, PROJECT HIMANKM<strong>in</strong>istry of Road Transport and Highways, Govt of IndiaNAME OF WORK: SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PERSPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM3.800 OF ROAD SASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FORCARRYING OUT 2.50 CM THICK SDBC FOR RESURFACING WORKSYEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO 34.159 ONKHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF(P) HIMANK IN LEH- LADAKH REGION OF J & K STATESrl<strong>NO</strong>.A(<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>)CONTENTSPART-I (UNPRICED/TECHNICAL BID)Srl Page1. Contents Sheet 012. Tender forward<strong>in</strong>g letter <strong>in</strong>clud<strong>in</strong>g eligibility criteria,<strong>02</strong>-09list & format of qualification documents and<strong>in</strong>struction to tenderers3. Notice Invit<strong>in</strong>g Tender 10-1<strong>14</strong>. General Conditions of Contracts IAFW-1815Z12-59(2007) <strong>in</strong>clud<strong>in</strong>g errata and amendments*5. Special Conditions 60-646. Particular/Tech<strong>nic</strong>al Specifications <strong>in</strong>clud<strong>in</strong>g list of65-66draw<strong>in</strong>gsB. PART-II (PRICED BID)7. Item Rate Contract for works required IAFW-1815Z (2007) <strong>in</strong>clud<strong>in</strong>g Schedule ‘A’ Notes,Schedules A, B, C & D and tenderC. OTHER DOCUMENTS FORMING PART OFCONTRACT AGREEMENT67-718. Errata/Amendments to tender documents9. Relevant Correspondence10. Tender conditions 7211. Acceptance 7312. Total No. of Pages13. Total Nos of Draw<strong>in</strong>gs* Not attached. These documents can be seen <strong>in</strong> the office of HQ DGBR/HQ CE (P)Himank/Cdr Task Force/OC dur<strong>in</strong>g work<strong>in</strong>g hours.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 2<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>FAX- 01982-26<strong>02</strong>78Tele No. 01982-26<strong>02</strong>77Email:bro<strong>16</strong>brtf@<strong>nic</strong>.<strong>in</strong><strong>in</strong>http://www.bro.gov.<strong>in</strong>Registered PostHeadquarters<strong>16</strong> Border Roads Task ForceProject HimankPIN-9300<strong>16</strong>C/O 56 APO8433/ /E8 Jun <strong>2013</strong>M/s_____________________________________________________________________Name of Work: SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PERSPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROADSASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICKSDBC FOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM30.00 TO 34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF(P) HIMANK IN LEH- LADAKH REGION OF J & K STATEDear sir (s),1. A set of tender documents <strong>in</strong> respect of the above work is forwarded herewith. Pleasenote that the tender will be received by the Accept<strong>in</strong>g Officer HQ <strong>16</strong> <strong>BRTF</strong> at the office ofHQ <strong>16</strong> <strong>BRTF</strong>, C/O 56 APO, PIN 9300<strong>16</strong> upto 1500 Hrs on22 Jul <strong>2013</strong>. Tender received afterthe due date and time will not be considered.2. Tenderers or their duly authorized representatives who have submitted their tenders andwho wish to be present at the time of open<strong>in</strong>g of tenders may visit the office of Accept<strong>in</strong>g OfficerHQ <strong>16</strong> <strong>BRTF</strong>,C/o 56 APO at the above mentioned time.3. Applicant contractor have to attach a demand draft for Rs.500.00 (Rupees Fivehundred only) <strong>in</strong> favour of The Commander. <strong>16</strong> <strong>BRTF</strong> (GREF), C/O 56 APO payableatSBI, Leh obta<strong>in</strong>ed from any Nationalized/Scheduled Bank valid for Six months with theirapplication as the cost of tender forms/documents. The all applicable Bank charges shall beborn by the applicant and he shall not have any claim what so ever on this account on Govt.In case of re-tender<strong>in</strong>g, the firms which have submitted the DD <strong>in</strong> earlier calls will require tosubmit DD along with their application also.The tender documents may also be downloaded from BRO websitewww.bro.gov.<strong>in</strong>. orwww.bro.<strong>nic</strong>.<strong>in</strong>. and pr<strong>in</strong>tout is to be taken on A4 size paper. It isadvisable that downloaded tender document preferable to be pr<strong>in</strong>ted through laserpr<strong>in</strong>ter only. Submission of photo copy of tender is not permitted. Cost of tender is tobe attached with downloaded tender. If cost of tender is already submitted <strong>in</strong> the officeof Accept<strong>in</strong>g Officer, it is not required to be attached aga<strong>in</strong> with downloaded tender,however, photocopy of Bank Draft shall be attached. If cost of tender is notattached/not already submitted <strong>in</strong> the office of Accept<strong>in</strong>g Officer, tender shall berejected by the Accept<strong>in</strong>g Officer.4. Tender<strong>in</strong>g procedure shall be s<strong>in</strong>gle stage-two bid system and tender documents shallbe prepared <strong>in</strong> two parts as under:-Part-I (‘Tech<strong>nic</strong>al Bid’ – ‘T’ Bid)Part-II (‘Price/Commercial’ bid- ‘Q’ Bid)(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 3<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>5. Part- I (Tech<strong>nic</strong>al Bid – ‘T’ Bid)5.1 Part-I (Tech<strong>nic</strong>al Bid- ‘T’ Bid) shall comprise of the follow<strong>in</strong>g:-(i) Eligibility/Qualification documents(ii) Tender Forward<strong>in</strong>g letter <strong>in</strong>clud<strong>in</strong>g eligibility criteria, list of qualification documentsand <strong>in</strong>struction to tenderers.(iii) Notice Invit<strong>in</strong>g Tender(iv) General Conditions of Contracts IAFW-1815(Z)-2007 form<strong>in</strong>g part of ContractAgreement.(v) Special Conditions of Contract.(vi) ParticularSpecifications <strong>in</strong>clud<strong>in</strong>g Draw<strong>in</strong>gs, if any.(vii) Any other tender documents except Price Bid.(viii) Cost of tender documents if not already submitted.(ix) Earnest money by “un-enlisted contractors” and “enlisted contractors who have notsubmitted Stand<strong>in</strong>g Security Deposit”.5.2 Tech<strong>nic</strong>al Evaluation Criteria5.2.1 Bidder should have submitted cost of tender documents.5.2.2 If contractor is not enlisted with BRO or enlisted with BRO but has notsubmitted Stand<strong>in</strong>g Security Deposit, he should have submitted Earnest Money.5.2.3 All the pages of T-Bid should have been duly signed by thebidders/authorized representative.5.2.4 Eligibility Criteria.A. Tenderers shall meet the follow<strong>in</strong>g eligibility criteria:A.1 Capabilities (This criteria is exempted for tenderers enlisted with BRO <strong>in</strong> eligibleclass* & above for works with estimated cost up to Rs 25 crores as given <strong>in</strong>NIT).(a) The tenderer should have work<strong>in</strong>g capital and/or credit facilities of at least 10% ofthe estimated cost of work as given <strong>in</strong> NIT.(b) Blank.A.2 Available Bid Capacity (ABC) - BlankA.3 Performance and other Requirements(a) There should not be poor/slow progress <strong>in</strong> runn<strong>in</strong>g works due to defaults of thetenderer.(b) There should not be serious defects observed <strong>in</strong> works which stand un-rectified bythe tenderer.(c) There should not be any cancelled/abandoned contracts <strong>in</strong> which Govt. unrealizedrecoveries exist.(d) Tenderer should have not been blacklisted by any Govt. Dept.(e) There should not be any Govt. dues outstand<strong>in</strong>g aga<strong>in</strong>st the tenderer.(f) Proprietor/partners/directors of firm should not be <strong>in</strong>volved <strong>in</strong> anti-national/socialactivities and should have neither been convicted nor should any proceed<strong>in</strong>gs be pend<strong>in</strong>g<strong>in</strong> court for such activities.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


Nameof work& CANo.CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 4<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>Notes for (A):-(i) * Eligible Class shall be:-Class E for works with estimated cost up to Rs 0.15 crore (as per NIT),Class D for works with estimated cost between Rs 0.15 crore to Rs 0.30 crore (as perNIT),Class C for works with estimated cost between Rs 0.30 crore to Rs 0.60 crore (as perNIT),Class B for works with estimated cost between Rs 0.60 crore to Rs 1.50 crore (as perNIT),Class A for works with estimated cost between Rs 1.50 crore to Rs 3.00 Crore (as perNIT),Class S for works with estimated cost between Rs 3.00 crore to Rs 12 Crore (as per NIT)andClass SS for works with estimated cost between Rs 12 crore to Rs 25 crore (as per NIT).(ii) Blank(iii) Blank.(iv) Blank.(v) Blank.(vi) Blank(vii) Blank.(viii) To determ<strong>in</strong>e the altitude of work, average of m<strong>in</strong>imum and maximum altitudes of thework site shall be considered.(ix) Blank.(x) Blank.(xi) The tenderer may be afforded an opportunity to clarify or modify his qualificationdocuments, if necessary, with respect to any rectifiable defects. The tenderer will respond <strong>in</strong>not more than 15 days of issue of the clarification letter, fail<strong>in</strong>g to which his tender is liable tobe rejected.(B). JOINT VENTURE (JV):-Blank.(C). Disqualification.Even though the tenderers meet the above criteria, they are liable to be disqualified ifthey have made mislead<strong>in</strong>g or false <strong>in</strong>formation <strong>in</strong> bidd<strong>in</strong>g documents submitted.5.2.5 List & format of eligibility documents to be attached along with Part-I of tenderdocuments to prove eligibility:-(i) List of works completed/substantially completed <strong>in</strong> “Last five & current” f<strong>in</strong>ancialyears and ongo<strong>in</strong>g works <strong>in</strong> follow<strong>in</strong>g format:-BriefScopeofWorkName &address ofemployer/clientAcceptedContractAmountDate ofCommencement ofworkOrig<strong>in</strong>aldate ofcompletionExtendeddate ofcompletionActual dateofcompletion/PresentProgressCost ofcompletedworkRemarksexpla<strong>in</strong><strong>in</strong>greasons ofdelay ifany(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 5<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>(ii) Available Bid Capacity - Blank(iii) Equipments, Plants and Vehicles. - Blank(iv)(v)(vi)Performance and other RequirementsTenderer shall submit undertak<strong>in</strong>g that:-(a)(b)(c)(d)(e)(f)BlankThere is no poor/slow progress <strong>in</strong> runn<strong>in</strong>g works. (If yes, he will submit detailsand reasons of delay to check that these are not attributable to him or arebeyond his control).There are no serious defects observed <strong>in</strong> works which stand un-rectified (If yes,he will submit details and reasons).There are no cancelled/abandoned contracts <strong>in</strong> which Govt. unrealisedrecoveries exist (If yes, he will submit details and reasons).He/They have not been blacklisted by any Govt. Dept. (If yes, he will submitdetails and reasons).There are no Govt dues outstand<strong>in</strong>g aga<strong>in</strong>st the firm (If yes, he will submitdetails and reasons).Proprietor/partners/directors of firm are not <strong>in</strong>volved <strong>in</strong> anti-national/socialactivities and have neither been convicted nor are any proceed<strong>in</strong>gs pend<strong>in</strong>g <strong>in</strong>court for such activities (If yes, he will submit details).Work<strong>in</strong>g CapitalCopy of latest balance sheet/<strong>in</strong>come tax return for work<strong>in</strong>g capital and/or Banker’scertificate for credit facilities. If necessary Dept. will make <strong>in</strong>quiries with the tenderer’sbanker.(vii)Blank(viii) Movable Property. Affidavit for movable property (Vehicle, Equipment and Plant etc.heldby the firm with value along with valuation certificate from enlisted valuer).(ix)(x)Solvency certificate from nationalized bank.Copies of PAN Card of proprietor/partners/directors.(xi) Lowest bidder (if his offer is decided for acceptance) will be required to fill enlistment formfor provisional enlistment.Notes:(i) Documents as listed at Sl (vi) above are exempted for tenderers enlisted with BRO <strong>in</strong>eligible class* & above for works with estimated cost up to Rs 25 crores as given <strong>in</strong> NIT.(ii) Documents as listed at Sl (xi) above are exempted for tenderers enlisted with BRO <strong>in</strong>any class.(iii) Affidavits shall be submitted on Non-Judicial stamp papers of appropriate values dulyattested by the Magistrate/Notary Public.(iv) Photocopies of documents shall be attested by Gazetted officer/Public notary and alsoself-attested.5.3 The bidder should meet all the tech<strong>nic</strong>al evaluation criteria <strong>in</strong>dicated <strong>in</strong> the biddocuments <strong>in</strong> order that the bid is considered to be tech<strong>nic</strong>ally responsive and the bidderqualify<strong>in</strong>g to have its commercial Bid opened.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 6<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>6. Part-II (‘Price/commercial’- ‘Q’ Bid)6.1 Part-II Price/Commercial Bid – ‘Q’ Bid) shall comprise of the follow<strong>in</strong>g:-(i) Schedule- ‘A’ Notes(ii) Schedule ‘A’ (to be quoted by Bidder)(iii) Schedules ‘B’, ‘C’ & ‘D’.(iv) Tender page`6.2 Q Bid Evaluation.(i) Arithmetical corrections shall be made as per General Conditions ofcontractsIAFW-1815(Z)-2007.(ii) Commercial bids will be reviewed to ensure that the figures <strong>in</strong>dicated there<strong>in</strong> areconsistent with the details of the correspond<strong>in</strong>g Tech<strong>nic</strong>al Bids.(iii)For the purpose of evaluation “Cost” shall be <strong>in</strong>clusive of all taxes and duties.(iv) Cost of all items of Schedule ‘A’ shall be totaled and the bidder who has quotedlowest total cost <strong>in</strong> Schedule ‘A’ (L-1) shall be considered successful bidder and all otherbidders shall be considered unsuccessful. Offer of successful bidder (L-1) shall only beconsidered for acceptance. If L-1 backs out, re-tender<strong>in</strong>g shall be resorted <strong>in</strong> a fair andtransparent manner.7. All the tender documents (Part-I & Part-II) shall be submitted together at one stagebut placed <strong>in</strong> separate sealed envelopes (supplied by the tenderer) duly marked Part-I andPart-II as stated above. All the two envelopes conta<strong>in</strong><strong>in</strong>g Part-I and Part-II duly sealedshall be put <strong>in</strong> one large size envelope (cloth l<strong>in</strong>ed, outer cover to be supplied by thetenderer). This outer cover shall <strong>in</strong>dicate name of work, name of tenderer, last date andtime of receipt of tender prom<strong>in</strong>ently.8. The tender documents (Part-I and Part-II) should be submitted/should be dropped <strong>in</strong>Tender Box kept at the Office of the SrAdm Officer, HQ <strong>16</strong> <strong>BRTF</strong>, C/o 56 APO, before the dateand time fixed for receipt of tender. The tender received after due date and time shall not beconsidered for acceptance. BRO shall not be responsible for any postal or other delay and shallnot take care to ensure the submission of tender at place and time fixed for receipt of tender.9. Tender shall be opened at 1500 Hrs on 22 Jul <strong>2013</strong> <strong>in</strong> the presence of the tenderers ortheir authorized representative whoever wishes to be present. Part-I only shall be opened first onthis day. Part-II (Priced Bid) shall not be opened. Part-II (Priced bid) envelopes shall be signedby the tender open<strong>in</strong>g officers and some bidders present and shall be put <strong>in</strong> separate largeenvelope and sealed by the open<strong>in</strong>g officer. Large envelope shall also be signed by the tenderopen<strong>in</strong>g officers. This large envelope conta<strong>in</strong><strong>in</strong>g unopened price bids shall be kept <strong>in</strong> safecustody of SrAdm officer. Part-I (Tech<strong>nic</strong>al bid) will be evaluated as per tech<strong>nic</strong>al evaluationcriteria given <strong>in</strong> the tender documents. Qualified tenderers will accord<strong>in</strong>gly be <strong>in</strong>formed along withdate and time of open<strong>in</strong>g of their price bid (However, date of open<strong>in</strong>g of Price Bid shall not beearlier than 7 days from the date of open<strong>in</strong>g of Part-I). Disqualified tenderers will also be<strong>in</strong>formed and their part-II (Price Bid) shall be returned unopened separately. Part-II (Price Bid assealed <strong>in</strong> large size envelope) shall be opened on the appo<strong>in</strong>ted date/time <strong>in</strong> the presence ofsuch tenderers who chose to be present and the amounts quoted by the tenderers shall be readout by the open<strong>in</strong>g officer(s) to the tenderers.10. The Commander, HQ <strong>16</strong> <strong>BRTF</strong>, C/o 56 APO will be Accept<strong>in</strong>g Officer here-<strong>in</strong>-afterreferred to as such for the purpose of this contract.11. Tenderers are requested to quote rates both <strong>in</strong> figure and words aga<strong>in</strong>st each itemof Schedule ‘A’ and extend the amount <strong>in</strong> Schedule ‘A’.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 7<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>12. If tenderers desire that any condition or stipulation given <strong>in</strong> the tender documents is to bemodified or deleted, they may submit their comments/suggestion well before last date ofsubmission of tender for consideration by the Dept. for issue of corrigendum/amendments totender documents. If dept. considers comments/ suggestions suitable, corrigendum/amendmentsto tender documents shall be issued and also uploaded on BRO website. If dept. does notconsider comments/suggestion suitable, corrigendum/amendments to tender documents shall notbe issued/uploaded on BRO website and tenderers shall quote strictly comply<strong>in</strong>g with the variousprovisions given <strong>in</strong> the tender documents. Any tender which stipulates any alterations to anyof the conditions/provisions laid down <strong>in</strong> tender documents (<strong>in</strong>clud<strong>in</strong>gcorrigendum/amendments) or which proposes any other conditions of any descriptionwhatsoever is liable to be rejected.13. The tenderers are advised to visit the work site to acqua<strong>in</strong>t themselves of work<strong>in</strong>g and siteconditions, before submitt<strong>in</strong>g their tender. The submission of tender by a person implies that hehas read this tender forward<strong>in</strong>g letter, the conditions of contract and has made himself aware ofthe scope and specifications of the work to be done and of the conditions and other factors, siteconditions, taxes and levies prevail<strong>in</strong>g etc. which may affect the quotation and execution of thework.<strong>14</strong>. Tenderer must be very careful to deliver a bonafide tender; fail<strong>in</strong>g which the tenders areliable to be rejected. Tenderers are, therefore, advised to ensure that their tender must satisfyeach and every condition laid down <strong>in</strong> tender documents.15. Tenderers must ensure that their tender is unambiguous and is completed <strong>in</strong> all respects.Their particular attention is drawn to the follow<strong>in</strong>g requirements, which must be complied with:-(a) Tender documents are to be signed, dated and witnessed as provided for thepurpose.(b)(c)All corrections should be signed or <strong>in</strong>itialled. Use of correct<strong>in</strong>g fluid is not allowed.Cloth l<strong>in</strong>ed envelope shall be used for return<strong>in</strong>g the tender documents.(d) In case they are submitt<strong>in</strong>g a BLANK <strong>TENDER</strong>, word ‘BLANK’ must be prom<strong>in</strong>entlyendorsed on the envelope and <strong>in</strong> Schedule ‘A’ <strong>in</strong>side the tender documents and generalsummary duly signed by the tenderer.(e) If a tender is submitted on behalf of a firm, it may be signed either by all partners ora person hold<strong>in</strong>g a valid power of attorney from all the partners constitut<strong>in</strong>g the firm. Theperson sign<strong>in</strong>g the tender on behalf of another or on behalf of a firm shall attach withtender a proper power of attorney duly executed <strong>in</strong> his favour by such other person or byall the partners stat<strong>in</strong>g specifically that he has authority to b<strong>in</strong>d such other person(s) or thefirm as the case may be <strong>in</strong> all matters perta<strong>in</strong><strong>in</strong>g to the contract <strong>in</strong>clud<strong>in</strong>g the arbitrationclause. The power of attorney shall be executed as <strong>in</strong>dicated below:-(i) In case of proprietorship concern if tender is signed by other than proprietor,person sign<strong>in</strong>g tender documents should hold power of attorney from proprietor.(ii) In case of partnership concern, power of attorney shall be executed byall partners.(iii) In case of company, power of attorney shall be executed <strong>in</strong> accordance withthe constitution of company.<strong>16</strong>. Tenderer who has downloaded the tender from the BRO website shall not tamper/modifythe tender form <strong>in</strong> any manner. In case if the same is found to be tampered/modified <strong>in</strong> anymanner, tender will be completely rejected and tenderer is liable to be banned from do<strong>in</strong>gbus<strong>in</strong>ess with BRO.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 8<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>17. Your attention is drawn to the Indian Official Secret Act-1923 (XIX of 1923) as amendedup to date particularly section 5 thereof.18. Earnest Money:-(a) Earnest money is not required to be attached with tender by the enlisted contractorwith BRO (term “enlisted contractor” used <strong>in</strong> tender documents means “enlisted contractorwith BRO”) who have submitted stand<strong>in</strong>g security but same is required from un-enlistedcontractor/enlisted contractor with BRO, who have not submitted Stand<strong>in</strong>g SecurityDeposit.(b) Un-enlisted contractors with BRO/Enlisted contractors with BRO, who have not submittedstand<strong>in</strong>g security deposit will submit the tender accompanied with Earnest Money amount<strong>in</strong>g toRs. 610<strong>14</strong>/- (Rupees sixty one thousand and fourteen only) <strong>in</strong> the form of Deposit at CallReceipt/Term Deposit Receipt/Special Term Deposit Receipt issued <strong>in</strong> favour of the Commander,HQ <strong>16</strong> <strong>BRTF</strong>, C/o 56 APO by nationalized/scheduled Bank. Tender not accompanied withEarnest Money will not be considered for acceptance. The amount of this receipt should bebasic amount and not their maturity value. Any deposit ly<strong>in</strong>g with the department <strong>in</strong> any formaga<strong>in</strong>st any other tender and/or contract shall not be considered for adjustment as the earnestmoney aga<strong>in</strong>st the tender. Any tender not accompanied with the Earnest Money <strong>in</strong> the form as<strong>in</strong>dicated here-<strong>in</strong>-before or accompanied with any letter/commu<strong>nic</strong>ation conta<strong>in</strong><strong>in</strong>g any request foradjustment of any other deposit as earnest money shall be treated as non bonafied tender.(c) Earnest money shall be returned to unsuccessful bidder (other than L-1) after open<strong>in</strong>g ofPrice Bids and to successful (L-1) bidder after receipt of security deposit.19. Security Deposit:-(a) In case of an enlisted contractor, who has submitted the Stand<strong>in</strong>g Security Deposit,but the tendered cost of the work exceeds the upper tender<strong>in</strong>g limit of the contractor andthe Accept<strong>in</strong>g Officer decides to accept this tender, the contractor has to lodge additionalSecurity Deposit (difference of Security Deposit of work and Stand<strong>in</strong>g Security Deposit) asnotified by the Accept<strong>in</strong>g Officer <strong>in</strong> the prescribed form with<strong>in</strong> 30 days of the receipt by himof notification of acceptance of the tender, fail<strong>in</strong>g which this sum shall be recovered fromthe first RAR payment, and if the date of first RAR is prior to the period mentioned above,the same shall be recovered from such payments.(b) In case of un-enlisted contractor/enlisted contractor who has not deposited thestand<strong>in</strong>g security deposit, and the Accept<strong>in</strong>g Officer decides to accept his tender, thencontractor has to lodge security deposit as notified by the Accept<strong>in</strong>g Officer <strong>in</strong> theprescribed form with<strong>in</strong> 30 days of the receipt by him of notification of acceptance of thetender, fail<strong>in</strong>g which this sum shall be recovered from the first RAR payment, and if thedate of first RAR is prior to the period mentioned above, the same shall be recovered fromsuch payment. The Security Deposit amount will be commu<strong>nic</strong>ated as per departmentalnorms but <strong>in</strong> no case the same shall be more than Rs 11,25,000.00 (Rupees ElevenLakhs Twenty five Thousand Only). Departmental norms of security deposit may beseen <strong>in</strong> any office of BRO.(c) The contractor may at his discretion furnish <strong>in</strong> lieu of Additional Security Deposit orSecurity Deposit a Bank Guarantee Bond executed by any nationalized/scheduled bankfor the said amount. The form of Bank Guarantee Bond may be seen <strong>in</strong> any office ofBRO.20. The Accept<strong>in</strong>g Officer reserves the right to accept a tender submitted by a PublicUndertak<strong>in</strong>g, giv<strong>in</strong>g a purchase preference over other tender(s) as are admissible under theGovernment Policy. No claim for any compensation or otherwise shall be admissible to suchtenders whose tenders may be rejected on account of the said policy.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 9<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>21. In view of postal and other delays, it is suggested that your tender be posted sufficiently <strong>in</strong>advance of the last date fixed for receipt of tenders or sent through a special messenger, ifnecessary. Tender received late will not be considered. Telegraphic commu<strong>nic</strong>ations received <strong>in</strong>connection with this tender will also be not considered.22. The tender shall rema<strong>in</strong> open for acceptance for a period of 120 days from the date ofopen<strong>in</strong>g of the tender (exclud<strong>in</strong>g the date of open<strong>in</strong>g).23. Blank.24. On acceptance of tender, the name of authorized representative (s) of the contractors whowould be responsible for tak<strong>in</strong>g <strong>in</strong>structions from Eng<strong>in</strong>eer-<strong>in</strong>-Charge or its authorizedrepresentative shall be <strong>in</strong>timated by the contractor with<strong>in</strong> 7 days of issue of Acceptance letter.26. Revocation of offer:-In the event of lowest tenderer revokes his offer or revise his rates upward (which will betreated as revocation of offer), after open<strong>in</strong>g of tenders and before expiry of orig<strong>in</strong>al validityperiod stipulated <strong>in</strong> tender documents, the earnest money deposited by him shall be forfeited. Incase of BRO enlisted contractors, the amount equal to the earnest money stipulated <strong>in</strong> the NoticeTender, shall be notified to the tenderer for deposit<strong>in</strong>g the amount through MRO, fail<strong>in</strong>g which theamount shall be recovered from any payment due to such contractor or shall be adjusted fromthe Stand<strong>in</strong>g Security Deposit. In addition, L-1 tenderer revok<strong>in</strong>g offer and his related firms shallnot be issued the tender <strong>in</strong> second or subsequent calls of subject work.Yours faithfully,(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 10<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>GENERAL RESERVE ENGINEER FORCEBORDER ROADS ORGANISATION<strong>16</strong> BORDER ROADS TASK FORCE, C/O 56 APOSHORT TERM <strong>NO</strong>TICE INVITING <strong>TENDER</strong>1. A sealed Tender is <strong>in</strong>vited for “SUPPLY AND STACKING OF STONE CHIPS 13.20 MM ASPER SPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROADSASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBC FORRESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO 39.038 ONKHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANK IN LEH-LADAKH REGION OF J & K STATE.”2. The tender documents may be downloaded from BRO website www.bro.gov.<strong>in</strong> or www.bro.<strong>nic</strong>.<strong>in</strong> andpr<strong>in</strong>t out is to be taken on A4 size paper. It is advisable the downloaded tender documents to be pr<strong>in</strong>ted throughlaser pr<strong>in</strong>ter only. Submission of Xerox copy or photo copy of tender is not permitted.3. The work is estimated to cost Rs. 4796400/- (Rupees forty seven lakh n<strong>in</strong>ety sixthousand fourhundred only) approximately. The estimate, however, is not a guarantee and is merely given as a rough guideand if works costs more or less, tenderer shall have no claim on that account of what so ever nature.4. The tender shall be based on draw<strong>in</strong>g, specification, General Condition of contracts IAFW-1815Z andspecial conditions, particular specifications with Schedule ‘A’ (List of works) to be priced by Tenderers .5. Not more than one tender shall be submitted by one contractor or one firm of contractors. Under nocircumstances will a father or his son(s) or other close relations who have bus<strong>in</strong>ess deal<strong>in</strong>gs with one anotherwill be allowed to tender for the same contract as separate competitors. A breach of this condition will renderthe tender of both parties liable to rejection.6. The work is to be completed with<strong>in</strong> 120 days <strong>in</strong> accordance with the phas<strong>in</strong>g, if any, <strong>in</strong>dicated <strong>in</strong> thetender from the date of hand<strong>in</strong>g over the site, which will be with<strong>in</strong> two months from the date of issue ofacceptance letter. Date of sales/availability of tender document on BRO web site www.bro.gov.<strong>in</strong> will be wef21Jun <strong>2013</strong> onward.7. The Commander, HQ <strong>16</strong> Border Roads Task Force, will be Accept<strong>in</strong>g Officer here-<strong>in</strong>-after referred to assuch for the purpose of this contract.8. Tender (<strong>in</strong> full) either downloaded from BRO website or issued by BRO will be received by HQ <strong>16</strong><strong>BRTF</strong>, C/O 56 APO up to 1500 Hrs of 15 Jul <strong>2013</strong>.9. Intend<strong>in</strong>g tenderers are advised to visit BRO website three days prior to date of open<strong>in</strong>g of tender forany corrigendum/addendum/amendment. Tender received after due date shall not be considered for open<strong>in</strong>gand no reason for delay or claim whatsoever shall be enterta<strong>in</strong>ed.10. The Tender shall be accompanied by Earnest Money amount<strong>in</strong>g to Rs. 71,946/- (Rupees seventy onethousand n<strong>in</strong>e hundred and forty six only)<strong>in</strong> the form of Deposit at call receipt / term deposit receipt / specialterm deposit receipt issued <strong>in</strong> favour of the Commander, <strong>16</strong> Border Roads Task Force, C/O 56 APO by aschedule Bank or <strong>in</strong> the form of receipt of Treasury Challan, the amount be<strong>in</strong>g credited to the revenue depositof Commander, <strong>16</strong> <strong>BRTF</strong>, C/O 56 APO. Contractor, who is not enlisted with Border Roads Organization/who isenlisted but has not executed stand<strong>in</strong>g security bond, while submitt<strong>in</strong>g tender shall be required to furnishearnest money along with the tender.11. Copies of draw<strong>in</strong>gs and other documents perta<strong>in</strong><strong>in</strong>g to the work required to be signed for the purpose ofidentification by the Accept<strong>in</strong>g Officer or his accredited representative and sample of materials and stores to besupplied by the contractor will be opened for <strong>in</strong>spection at the follow<strong>in</strong>g location:-HQ <strong>16</strong> Border Roads Task Force12. The tenderers are advised to visit the site by mak<strong>in</strong>g prior appo<strong>in</strong>tment with the Commander <strong>16</strong> <strong>BRTF</strong>,C/O 56 APO.13. A tenderer shall be deemed to have full knowledge of all relevant documents, samples, site etc whetherhe has <strong>in</strong>spected them or not.Contd….P/2(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 11<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong><strong>14</strong>. Any tender which stipulates any alteration to any of the conditions laid down or proposes any otherconditions of any description whatsoever, is liable to be rejected.15. The Accept<strong>in</strong>g Officer reserves his right to accept a tender submitted by a Public Undertak<strong>in</strong>g, giv<strong>in</strong>g aPrice preference over other tender(s), which may lower, as are admissible under the Government Policy. No claimfor any compensation or otherwise shall be admissible to such tenderer(s) whose tenders may be rejected onaccount of the said policy.<strong>16</strong>. The submission of the tender by a tenderer implies that he has read this notice and conditions of contractand has made himself aware of the scope and specifications of the work to be done and of the conditions and rateat which stores, tools and plants etc will be issued to him and local conditions and other factors bear<strong>in</strong>g on theexecution of the work.17. Applicant contractor have to attach a demand draft for Rs.500.00 (Rupees Five hundred only) <strong>in</strong> favourof The Commander. <strong>16</strong> <strong>BRTF</strong> (GREF), C/O 56 APO payable atSBI, Leh obta<strong>in</strong>ed from anyNationalized/Scheduled Bank valid for Six months with their application as the cost of tender forms/documents.The all applicable Bank charges shall be borne by the applicant and he shall not have any claim what so ever onthis account on Govt. In case of re-tender<strong>in</strong>g, the firms which have submitted the DD <strong>in</strong> earlier calls will require tosubmit DD along with their application also. Tenderer not accompanied with the cost of tender is liable to berejected. However, public sector under tak<strong>in</strong>g firms are exempted from the payment towards cost of tenderdocuments.18. The Demand Draft attached with the application shall be non-refundable if tender documents are issued tothe contractor. However, it shall be returned to the applicant by the Accept<strong>in</strong>g Officer <strong>in</strong> case the tender form is notissued.19. The applicant contractor shall not become automatically entitled for issue of tender by virtue of enclos<strong>in</strong>gDemand Draft along with the application and the Accept<strong>in</strong>g Officer shall reserve the right to deny issue if tender toany applicant contractor.20. In case of selective tender<strong>in</strong>g or where <strong>in</strong> adequate applications are received suitable contractor may beselected and they shall also be asked to forward DD towards the cost of tender. Tender will be issued to suchcontractors only thereafter.21. The Accept<strong>in</strong>g Officer does not b<strong>in</strong>d himself to accept the lowest or any tender or to give any reasons fornot do<strong>in</strong>g.22. Tenderer who have downloaded the tender from the BRO website shall submit declaration along withtender documents that I/we have downloaded the tender from BRO website www.bro.gov.<strong>in</strong> or www.bro.<strong>nic</strong>.<strong>in</strong> andI/we have not tempered/modified the tender form <strong>in</strong> any manner. In case if the same is found to betempered/modified <strong>in</strong> any manner, I/we understand that my/our tender will be summarily rejected and I/we areliable to be banned from do<strong>in</strong>g bus<strong>in</strong>ess with BRO.23. For further particulars, you may also see “Indian Trade Journal” dated 12 Jun <strong>2013</strong> and refer BRO websitewww.bro.gov.<strong>in</strong> and www.bro.<strong>nic</strong>.<strong>in</strong>.24. This notice of tender shall form part of the contract.Case File No. 8433/Tend No.<strong>CDR</strong>-<strong>16</strong> TF/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>/ /E8(Rajendra Kumar)EE (Civ)SWFor Accept<strong>in</strong>g OfficerDated : May <strong>2013</strong>Headquarter<strong>16</strong> Border Roads Task ForceC/o 56 APOP<strong>in</strong> 9300<strong>16</strong>(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 12-59<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>GENERAL CONDITIONS OF CONTRACTS(IAFW-1815(Z)-2007)FOR(Name of work) :“SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PERSPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROADSASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBCFOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANKIN LEH- LADAKH REGION OF J & K STATE”1. A Copy of the GENERAL CONDITIONS OF CONTRACTS (IAFW-1815 (Z)(2007)<strong>in</strong>clud<strong>in</strong>g errata and amendments* has been supplied to me/us and /or is <strong>in</strong> my/our possession.I/We have read and understood the provisions conta<strong>in</strong>ed <strong>in</strong> the aforesaid GENERALCONDITIONS OF CONTRACTS before submission of this tender and I/We agree that I/Weshall abide by the terms and conditions thereof, as modified, if any, elsewhere <strong>in</strong> these TenderDocuments.2. It is hereby further agreed and declared by me/us, the GENERAL CONDITIONS OFCONTRACTS, <strong>in</strong>clud<strong>in</strong>g condition 37 thereof perta<strong>in</strong><strong>in</strong>g to settlement of disputes by arbitration,conta<strong>in</strong><strong>in</strong>g 48 pages (serial page No. 13-60) form part of these Tender Documents.3. Wherever the phrases Commander works Eng<strong>in</strong>eer (CWE) and Garrison Eng<strong>in</strong>eer (GE)have been used <strong>in</strong> the General Conditions of Contracts IAFW-1815 (Z), the same areconsidered as Task Force Commander (TFC) and OC Contract respectively as applicable <strong>in</strong>General Reserve Eng<strong>in</strong>eer Force.<strong>NO</strong>TE: COPY OF GENERAL CONDITIONS OF CONTRACTS IAFW-1815(Z) CAN BEREFERRED IN ANY OFFICE OF BRO(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 60<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>GENERALSPECIAL CONDITIONS OF CONTRACT1. The follow<strong>in</strong>g Special Conditions shall be read <strong>in</strong> conjunction with the General Conditionsof Contract, IAFW-1815 (Z) and IAFW-1815 (R) <strong>in</strong>clud<strong>in</strong>g errata and amendments thereto. If anyprovision <strong>in</strong> the Special Conditions is at variance with that of the aforesaid documents, theSpecial Conditions will take precedence over the later.INSPECTION OF SITE2. The contractor is particularly advised to <strong>in</strong>spect the site (s) of work by mak<strong>in</strong>g priorappo<strong>in</strong>tment with OC 54 RCC / Commander <strong>16</strong> <strong>BRTF</strong>, C/o 56 APO, so as to acqua<strong>in</strong>t himselfwith regard to the nature and conditions of site, nature and means of local commu<strong>nic</strong>ation,work<strong>in</strong>g hours, conditions of access and all other cognate matters concern<strong>in</strong>g the execution andcompletion of the work. Any paths, tracks, approaches etc. required for the movement of plants,equipments, mach<strong>in</strong>es and vehicles etc. to the work site and platform, bund etc. required for theexecution of work will be the responsibility of the contractor and rates quoted must <strong>in</strong>clude theseaspects also where required. The tenderer shall be deemed to have <strong>in</strong>spected the site andmade himself familiar with various factors which may affects his quotation whether he actually<strong>in</strong>spect the site or not. No extra charges consequent on misunderstand<strong>in</strong>g or otherwise will beallowed.SCOPE OF WORK3. The scope of work shall be <strong>in</strong> accordance with the provisions given <strong>in</strong> schedule ‘A’ oftender documents. The contractor shall supply the items <strong>in</strong> Schedule ‘A’ at the places providedthere<strong>in</strong> and <strong>in</strong> accordance to work order placed by OC Contract.RATES4. The rates quoted <strong>in</strong> schedule-A by the contractor shall be deemed to <strong>in</strong>clude all taxeslike excise, sales tax, service tax, <strong>in</strong>come tax, VAT and all local taxes, octroi, royalty / monopolycharges, if any, charges for vehicles carry<strong>in</strong>g loads and pack<strong>in</strong>g materials, etc. No extra paymentshall be made by the Government on this account.4.1 The Contractor shall ensure that the rates quoted by him <strong>in</strong> schedule-A <strong>in</strong>clude forarrangement of operation viz load<strong>in</strong>g/unload<strong>in</strong>g at site as directed by the Eng<strong>in</strong>eer-In-Charge.No halt<strong>in</strong>g charges will be payable for the period required for unload<strong>in</strong>g.4.2 Contractors shall rema<strong>in</strong> responsible for procurement of any stores/materials <strong>in</strong>clud<strong>in</strong>gany tools/equipments required for procurement and supply of items as mentioned <strong>in</strong> Sch ‘A’ andany other road materials/stores as the case may be, under this contract. His rate shall bedeemed to be <strong>in</strong>clusive of all such eventualities.TIME OF SUPPLY5. Work<strong>in</strong>g hours dur<strong>in</strong>g operation of contract will be 0700 hrs to 1730 hrs on all work<strong>in</strong>gdays.MINIMUM FAIR WAGES PAYABLE TO LABOURERS6. The contractor shall pay wages not less than the fair wages fixed from time to time by theState Government or m<strong>in</strong>imum wages fixed under the m<strong>in</strong>imum wages Act by the CentralGovernment whichever is higher. He shall have no claim whatsoever, if he is required to paywages <strong>in</strong> excess of the wages so fixed on account of any local regulations or otherwise.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 61<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>SECURITY DEPOSITSPECIAL CONDITIONS (CONTD)7. Security Deposit of the work shall be 25% more than the amount of Earnest Money andshall be deposited <strong>in</strong> standard form with<strong>in</strong> 30 days, calculated as per the scale laid down, basedon the value of the work subject to the provision that <strong>in</strong> no case shall the <strong>in</strong>dividual SecurityDeposit exceed Rs. 11,25,000.00. If security deposit not lodged with<strong>in</strong> stipulated time it will bededucted from first RAR.Tender Guarantee <strong>in</strong> the form of Bank Guarantee from a scheduledCommercial Bank based <strong>in</strong> India, for the amount which will be calculated as per laid down scaleon actual tender amount, <strong>in</strong> favour of Commander <strong>16</strong> <strong>BRTF</strong>, C/o 56 APO with a validity periodof 180 days from the date of submission of tender with a provision that it could be suitablyextended on the request of client will also be acceptable. In case the Bank Guarantee isfurnished by a foreign bank it shall be confirmed by Delhi Branch of scheduled commercial bankbased <strong>in</strong> India.RECORDS OF MATERIALS HANDED OVER8. Contractor shall handover the material at the site/ particular location as directed byEng<strong>in</strong>eer- <strong>in</strong> – Charge to Eng<strong>in</strong>eer- <strong>in</strong> – Charge through a delivery note which will show detailslike description of items supplied, quantity supplied and date of measurement.PERIOD OF WORK ORDER9. The materials shall be delivered with<strong>in</strong> the period and phas<strong>in</strong>g mentioned <strong>in</strong> the workorder.RESTRICTION10. Thorough search may be conducted at entry and exit po<strong>in</strong>t of the work site/store yard ofthe contractor and his men and vehicles. The movement of the contractor’s vehicles shall beunder the restricted work<strong>in</strong>g conditions issued by the authorities concerned from time to time.The contractor shall have no claim on account of restrictions and work<strong>in</strong>g conditions imposedon account of adm<strong>in</strong>istrative reasons.SECURITY11.1 These documents are confidential and must be strictly conf<strong>in</strong>ed to the contractor’sown use and for the purpose of carry<strong>in</strong>g out the work.11.2 The contractor shall apply <strong>in</strong> writ<strong>in</strong>g well <strong>in</strong> advance of commencement of work,for the issue of security passes and shall submit list of personnel etc. to concernedauthorities. Eng<strong>in</strong>eer-<strong>in</strong>-Charge at his discretion has the right to issue passes to controlthe admission of contractor, his agents and his workmen.METHOD OF MEASUREMENT AND PAYMENT12.1 The materials supplied by the contractor at site, should be <strong>in</strong> accordance withschedule ‘A’ of these tender documents and Work Order placed by the OC Contract,shall be measured and entered jo<strong>in</strong>tly by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge and contractor <strong>in</strong> MB.12.2 The payment shall be on the basis of rates quoted by the contractor <strong>in</strong> schedule‘A’ for the items mentioned there<strong>in</strong> for the quantities, supplied at site and, measuredjo<strong>in</strong>tly by Eng<strong>in</strong>eer- <strong>in</strong> – Charge and contractor <strong>in</strong> the MB.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 62<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>SPECIAL CONDITIONS (CONTD)12.3 The materials rejected by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge shall be removed from siteunder arrangement of the contractor with<strong>in</strong> 07 days. No claim from contractor forremov<strong>in</strong>g the rejected materials will be enterta<strong>in</strong>ed. Upon failure of the Contractor tocomply with any order of the Eng<strong>in</strong>eer/his representative, given under this Clause, theEng<strong>in</strong>eer-<strong>in</strong>-Charge shall have authority to cause the removal of rejected material and todeduct the removal cost thereof from any payment due to the Contractor.12.4 Contractor shall arrange labour and other tools required for tak<strong>in</strong>g themeasurements. Contractor shall not be entitled to any extra payment on this account. Incase the contractor or his accredited representative fails to report for tak<strong>in</strong>g jo<strong>in</strong>tmeasurements at the appo<strong>in</strong>ted date and time, as <strong>in</strong>timated by the Eng<strong>in</strong>eer-<strong>in</strong>-charge <strong>in</strong>writ<strong>in</strong>g, the measurements shall be taken by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge exparte withoutpresence of contractor or his accredited representative and measurement thus takenshall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the contractor.CONTRACTOR’S EMPLOYEE. The contractor shall employ only Indian nationals as hisrepresentative/agent. The antecedents of the employees and workmen will be verified by thecontractor before employ<strong>in</strong>g them on works. He shall ensure that personnel of doubtfulantecedents and of foreign nationality are not employed and entrusted with the work. Dur<strong>in</strong>g theperiod of work anybody is suspected to have connection with anti-nationals, he will immediatelybe sent out and the contractor shall have no claim whatsoever on this account.VALIDITY PERIOD FOR <strong>TENDER</strong> OFFER.The tender shall rema<strong>in</strong> open for acceptance for aperiod of 120 days from the date specified for its submission.METHOD OF MEASUREMENT15.1 Coarse and f<strong>in</strong>e aggregates supplied at site of work shall be paid for <strong>in</strong> cubic meters. Theactual volume of aggregates to be paid for shall be computed after deduct<strong>in</strong>g thespecified percentage from the volume computed by stack measurement as under as perPara 5<strong>14</strong>.5 of MORT & H specification of Roads & Bridges (4th Revision):-S/No standard size of aggregatespercentage reduction <strong>in</strong> volume computedby stack measurements to arrive at thevolume to be paid for1. Stone Chips 13.20 mm 52. Coarse Sand 5Unless otherwise directed, measurements shall not be taken until sufficient materials foruse on the road have been collected and stacked. Immediately after measurement, the stacksshall be marked by white wash or other means as directed by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge.15.2 In case of materials supplied at site other than coarse and f<strong>in</strong>e aggregates as specifiedunder schedule-A, the items will be accounted for after comply<strong>in</strong>g the complete specificationsas per Tender DocumentsROYALTY: (a) “The Contractor shall submit a certificate as under before submission of his f<strong>in</strong>albill. However, the amount towards royalty shall be kept as reserve till production of thecertificate and related documents as per under: -(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page | 63<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>SPECIAL CONDITIONS (CONTD)CERTIFICATEIt is certified that I/We, M/s (Primary License Holder) hav<strong>in</strong>g a License No……………issued by Forest/M<strong>in</strong><strong>in</strong>g Department, Government of ----------------------- have supplied thefollow<strong>in</strong>g materials to M/s ----------------------------------------(Contractor) aga<strong>in</strong>st CA No. <strong>CDR</strong> <strong>16</strong>TF/ ------------------------- dur<strong>in</strong>g the period from ------------------------------------ to -----------------------------------.MaterialsQuantity supplied(a)(b)It is further certified that Royalty etc. for above quantity of materials at applicable rateshave been paid by us to the concerned Department of the Government of -------------------------. Acopy of No Demand Certificate/Challan/Permit/Affidavit duly verified by the concernedDepartment etc. is attached herewith.MISCELLANEOUS(M/s……………………………)(Primary License Holder)<strong>16</strong>.1 Any Tender which stipulates any alterations to any of the conditions laid down whichproposes any other conditions of any description what so ever, is liable to be rejected.<strong>16</strong>..2 The Accept<strong>in</strong>g Officer reserves the right for acceptance of the tender as a whole or <strong>in</strong>part depend<strong>in</strong>g up on the rates and conveyance for execution and adm<strong>in</strong>istration ofcontract at site.DEDUCTION OF TAXES AT SOURCE17.1 INCOME TAX. Income Tax will be deducted at source as applicable.17.2 Re-Imbursement /Re-Fund on variation <strong>in</strong> “taxes directly related to contract value”a) The rates quoted by the contractor shall be deemed to be <strong>in</strong>clusive of all taxes(<strong>in</strong>clud<strong>in</strong>gSales Tax/VAT on materials, Sales Tax/VAT on Works Contracts. Turnover Tax, Service Tax,Labour Welfare Cess/Tax etc),duties, Royalties, octroi& other levies payable under the respectivestatues. No re-imbursement/refund for variation <strong>in</strong> rates of taxes, duties, royalties, octroi& otherlevies, and/or imposition/abolition or any new/exist<strong>in</strong>g taxes, duties, royalties, octroi& other leviesshall be made except as provided <strong>in</strong> sub para (b) here-<strong>in</strong>-below.b) (i) The taxes which are levied by Govt. at certa<strong>in</strong> percentage rates of contractsum/amount shall be termed as “taxes directly related to contract value” such as Sales Tax/VATon works contracts, Turn over Tax, Labour Welfare Cess/Tax and like but exclud<strong>in</strong>g Income Tax.The tendered rates shall be deemed to be <strong>in</strong>clusive of all “taxes directly related to contract value”with exist<strong>in</strong>g percentage rates as prevail<strong>in</strong>g on last due date for receipt of tenders. Any <strong>in</strong>crease<strong>in</strong> percentage rates of “taxes directly related to contract value” with reference to prevail<strong>in</strong>g rateson last due date for receipt of tenders shall be re-imbursed to the contractor and any decrease <strong>in</strong>percentage rates of “taxes directly related to contract value” with reference to prevail<strong>in</strong>g rates onlast due date for receipt of tenders shall be refunded by the contractor to the Govt./deducted bythe Govt. from any payments due to the contractor. Similarly imposition of any new “taxesdirectly related to contract value” after the last due date for receipt of tenders shall be reimbursedto the contractor and abolition of any taxes “directly related to contract value” prevail<strong>in</strong>gon last due date for receipt of tenders shall be refunded by the contractor to the Govt./deductedby the Govt. from the payments due to the contractor.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page|64<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>SPECIAL CONDITIONS (CONTD)(ii) The contractor shall with<strong>in</strong> a reasonable time of his becom<strong>in</strong>g aware of variation <strong>in</strong>percentage rates and/or imposition of any “taxes directly related to contract value” givewritten notice thereof to OC Contract stat<strong>in</strong>g that the same is given pursuant to theSpecial Condition, together with all <strong>in</strong>formation relat<strong>in</strong>g thereto which he may be <strong>in</strong> aposition to supply. The contractors shall submit the other documentary proof/<strong>in</strong>formationas the OC contract may require.(iii) The contractor shall, for the purpose of this condition keep such books of accountand other documents as are necessarily and shall allow <strong>in</strong>spection of the same by a dulyauthorized representative of Govt., and shall further, at the request of the OC Contractmay require, any documents so kept and such other <strong>in</strong>formation as the OC Contract mayrequire.(iv) Re-imbursement for <strong>in</strong>crease <strong>in</strong> percentage rates/imposition of “taxes directlyrelated to contract value” shall be made only if the contractor necessarily & properly paysadditional “taxes directly related contract value” to the Govt. without gett<strong>in</strong>g the sameadjusted, aga<strong>in</strong>st any other tax liability or without gett<strong>in</strong>g the same refunded from theconcerned Govt. Authority and submit documentary proof for the same as the OCContract may require.ARBITRATION18. (Refer Clause-37 of conditions of contract of IAFW-1815Z) All disputes of differencearis<strong>in</strong>g as aforementioned under condition No-37 of General Condition of contract IAFW-1815(Z) shall be referred to Sole Arbitrator who will be an Eng<strong>in</strong>eer Officer to be appo<strong>in</strong>ted byDirector General Border Roads. The Arbitration award published by the Arbitrator appo<strong>in</strong>ted byDGBR shall be filed <strong>in</strong> the appropriate Court and only Courts at Jammu (J&K) shall be deemedto have jurisdiction on all matters executed/to be executed under this contract. The Arbitratorshall give reasons for the award <strong>in</strong> each and every case irrespective of the value of claims ofcounter claims.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 65<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>SCOPESTONE CHIPS 13.2 mm downwardPARTICULAR SPECIFICATIONS1.1 The contractor should supply the Crusher generated aggregate of size 13.2 mm downwards <strong>in</strong>accordance with specifications given <strong>in</strong> these tender documents.1.2 The aggregates shall satisfy the physical requirements as per Table 5<strong>14</strong> of Specifications forRoad and Bridge Works (Fourth Revision) as under: -IS 2386 Part I Max 30%IS 2386 Part 4 Max 35%IS 2386 Part 3 M<strong>in</strong>imum Reta<strong>in</strong>ed coat<strong>in</strong>g 95%S/No Test Test Method Requirement1. Gra<strong>in</strong> size analysis 1 IS 2386 Part I Max 5% pass<strong>in</strong>g 0.075mm sieve2. Flak<strong>in</strong>ess and ElongationIndex (Comb<strong>in</strong>ed) 23. Los Angeles Abrasion Value 3Aggregate Impact Value 4 Max 27%4. Polished Stone Value 5 IS 2386 Part 4 M<strong>in</strong> 555. Soundness: 6Sodium SulphateMagnesium SulphateBS 812 Part 1<strong>14</strong>BS 812 Part 1<strong>14</strong>Max 12%Max 18%6. Water absorption 7 IS 2386 Part 5 Max 2%7. Coat<strong>in</strong>g and stripp<strong>in</strong>g ofBitumen Aggregate Mixtures 98. Reta<strong>in</strong>ed Tensile Strength 8 AASHTOT283 M<strong>in</strong> 80%SIZE GRADING AND PROPORTIONING OF MATERIALS1.3 The crushed stone chips of size 13.2 mm downward shall satisfy the size, grad<strong>in</strong>g andproportions as below :-S/No Sieve Size <strong>in</strong> MM Percentage pass<strong>in</strong>g1. 13.2 10<strong>02</strong>. 9.5 90 – 1003. 4.75 35 – 5<strong>14</strong>. 2.36 0 – 10Coarse Sand/ F<strong>in</strong>e aggregate2.1 The f<strong>in</strong>e aggregate shall consist of clean, hard, strong and durable piece of crushed gravel, or asuitable comb<strong>in</strong>ation of natural sand or gravel shall conform to IS : 383. F<strong>in</strong>e aggregate shall be freefrom soft or flaky particles, clay, shale, loam, cemented particles, mica and orga<strong>nic</strong> and other foreignmatter. The f<strong>in</strong>e aggregate shall not conta<strong>in</strong> deleterious substances <strong>in</strong> such quantities as to reduce thestrength and durability of concrete.2.2 The f<strong>in</strong>eness modulus of f<strong>in</strong>e aggregate shall neither be less than 2.0 nor more than 3.5.2.3 The sand/f<strong>in</strong>e aggregate for the SDBC 2.50 Cm thickk shall conform to the follow<strong>in</strong>g grad<strong>in</strong>grequirements:S/No Sieve Size Percentage pass<strong>in</strong>g1. 4.75 MM 90 – 10<strong>02</strong>. 2.36 MM 80 – 1003. 1.18 MM 60 – 804. 0.3 MM 30 – 505. 75 Micron 0 – 1<strong>02</strong>.4 Coarse Sand shall conform to the requirements of IS 21<strong>16</strong>. It shall consist of natural sand.Coarse sand shall not consist of dust, lumps, soft or flaky, materials mica or other deleterious materials.Motorized sand wash<strong>in</strong>g mach<strong>in</strong>es should be used to remove impurities from sand. All F<strong>in</strong>e aggregatesshall conform to IS: 383 and tests for conformity shall be carried out as per IS:2386, (Parts I to VIII). Thecontractor shall submit the entire <strong>in</strong>formation <strong>in</strong>dicated <strong>in</strong> Appendix A of IS: 383 for the approval of theEng<strong>in</strong>eer-In-Charge. The f<strong>in</strong>eness modulus of f<strong>in</strong>e aggregate shall neither be less than 2.0 nor greaterthan 3.5. Sand/f<strong>in</strong>e aggregate for structural concrete shall conform to the follow<strong>in</strong>g grad<strong>in</strong>g requirementsas per Table No. 1000-2 of MORT & H specification for road and bridges work (Fourth Revision).(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 66<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>TEST FOR QUALITY CONTROLPARTICULAR CONDITIONS (CONTD)3.1 The materials supplied by the contractor shall confirm to the specifications prescribed <strong>in</strong>the preced<strong>in</strong>g clauses.3.2 For ensur<strong>in</strong>g the requisite quality of construction, the materials shall be subjected toQuality Control Tests at m<strong>in</strong>imum frequency as stipulated <strong>in</strong> table 900-4 under Para 903.4.1 ofM<strong>in</strong>istry of Surface Transport ( Road W<strong>in</strong>g ) Specifications for road and bridge works(4threvision) published by IRC. After receipt of material on ground from contractor, the Eng<strong>in</strong>eer-<strong>in</strong>-Charge will carry out tests at unit/TF/ QCCHimank, before acceptance of materials. Thecontractor shall provide necessary co-operation and assistance <strong>in</strong> obta<strong>in</strong><strong>in</strong>g the samples fortests and carry<strong>in</strong>g out the field tests as required by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge from time to time.This may <strong>in</strong>clude provision of labour, attendants, assistance <strong>in</strong> pack<strong>in</strong>g and dispatch<strong>in</strong>g and anyother assistance considered necessary <strong>in</strong> connection with the tests.3.3 The frequency of various tests for aggregates is stipulated as per table 900-4 and 900-3of M<strong>in</strong>istry of Surface Transport (Road W<strong>in</strong>g) Specifications for road and bridge works (4 threvision) published by IRC as under and shall be carried out by the contractor <strong>in</strong> time.S/No TestFrequency (M<strong>in</strong>) for premix carpet materiala) Aggregate impact value/Los One test per 50 CumAngeles abrasion valueb) Flak<strong>in</strong>ess <strong>in</strong>dex and Elongation One test per 50 Cum<strong>in</strong>dex of aggregatesc) Water Absorption of aggregates Initially one set of 3 representative specimens foreach source of supply subsequently whenwarranted by changes <strong>in</strong> the quality ofaggregates.d) Soundness (Magnesium and Initially one determ<strong>in</strong>ation by each method forsodium sulphate)each source of supply, then as warranted bye) Grad<strong>in</strong>g of coarse and f<strong>in</strong>eaggregatechanges <strong>in</strong> the quality of aggregates.One test per 25 Cum3.4 If the frequency of various test are failed by the contractor, department has the right toconduct various tests as stipulated and test charges shall be deducted from contractors billaccord<strong>in</strong>gly.3.5 The contractor shall submit the samples of materials proposed to be supplied to the OCContract before commencement of supply for approval of Eng<strong>in</strong>eer-In-Charge/OC Contract andsupply shall be commenced only after approval of sample by Eng<strong>in</strong>eer-In-Charge/OC Contract.3.6 The approved samples shall be clearly labeled and sealed <strong>in</strong>dicat<strong>in</strong>g CA No, Name ofwork, Contractor Name, Description of items, and shall be kept <strong>in</strong> the safe custody of the OCContract.(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 67<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>GENERAL RESERVE ENGINEER FORCEIAFW-1815 (Z)(To be used <strong>in</strong> conjunction with Genereal Conditions of contracts IAFW-1815 (R), 2007)Registered/ADHeadquarters<strong>16</strong> Border Roads Task ForcePIN-9300<strong>16</strong>C/O 56 APO8433/ /E8 Jun <strong>2013</strong>Name of works: - SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PERSPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROADSASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBCFOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANKIN LEH- LADAKH REGION OF J & K STATE<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>1. Shri/M/s_________________________________________________________is/are herebyauthorized to tender for the above mentioned work. The tender is to be delivered at the office ofHeadquarters <strong>16</strong> <strong>BRTF</strong>, C/O 56 APO, up to 1500 Hrs on 22 Jul <strong>2013</strong>addressed to theCommander <strong>16</strong> <strong>BRTF</strong>, C/o 56 APO and the cover shall <strong>in</strong>dicate name of work, name ofbidder, last date and time of receipt of tender and <strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>prom<strong>in</strong>ently.2. All documents must be returned whether or not, a tender has been submitted.3. Any correspondence concern<strong>in</strong>g this tender should be addressed, quot<strong>in</strong>g the referenceas given and <strong>in</strong>dicated at the top of this sheet.THE PRESIDENT OF INDIA DOES <strong>NO</strong>T BIND HIMSELF TO ACCEPT THE LOWEST FORANY <strong>TENDER</strong> AND RESERVES THE RIGHT TO DO SO WITHOUT ASSIGNING ANYREASON(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 68<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>BORDER ROADS ORGANISATIONM<strong>in</strong>istry of Road Transport and Highways, Govt of IndiaHEADQUARTERS <strong>16</strong> BORDER ROADS TASK FORCE (P) HIMANKSUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PER SPECIFICATION ANDCOARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROAD SASOMA-WARSI-S<strong>NO</strong>UT(HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBC FOR RESURFACINGWORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO 34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANK IN LEH- LADAKHREGION OF J & K STATEPART–II PRICED BIDThe follow<strong>in</strong>g shall form part of this contract agreement: -Document annexed heretoSrl ParticularsPage NoNo1 Contents 682 Schedule ‘A’ (Notes) 693 Schedule ‘A’ 704 Schedule ‘B’, ‘C’ & ‘D’ 71(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 69<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>SCHEDULE-‘A’LIST OF WORKS AND PRICESNAME OF WORK: “SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PERSPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROADSASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBCFOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANKIN LEH- LADAKH REGION OF J & K STATE”<strong>NO</strong>TES:-1. The rates/amount quoted by the tenderer for the item <strong>in</strong> this schedule shall be deemed to<strong>in</strong>clude for the provisions of all labour and materials, operators, safety measures for labour andmaterials, <strong>in</strong>surance, security, platform, royalty charges for materials to be supplied etc. as perspecial requirements detailed <strong>in</strong> this schedule, <strong>in</strong> the Particular Specifications and elsewhere <strong>in</strong>these tender documents and for the full, entire and f<strong>in</strong>al completion of work <strong>in</strong> accordance withthe provisions of these Tender Documents.2. The total period of completion shall be 120 Days from the date of commencementspecified <strong>in</strong> the First Work Order.3. The work will commence and be completed as per Work Order issued by OC Contract.4. The tenderer is required to quote his rates at serial page No. 70 under Schedule-‘A’both <strong>in</strong> figures and words.5. The quantities quoted <strong>in</strong> column No. 5 are approximate and <strong>in</strong>serted as a guide only.Any item can be varied to an extent up to 50% (Fifty percent) at the discretion of OCContract/Eng<strong>in</strong>eer-<strong>in</strong>-Charge provided the total amount of contract does not <strong>in</strong>crease/decreaseby more than 10% (Ten percent).(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 70<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>SCHEDULE ‘A’NAME OF WORK: “SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PER SPECIFICATION AND COARSE SAND ATDETTCHANGLUNG KM 3.800 OF ROAD SASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBCFOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO 34.159 ON KHALSAR-SASOMA ROADUNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANK IN LEH- LADAKH REGION OF J & K STATE”S/NoDescription ofworkSpecifications A/U QtyPeriod ofcompletionof workUnit rate <strong>in</strong> wordsand figure <strong>in</strong> Rs.TotalAmt <strong>in</strong>RsRemarks1 Supply of Stonechips 13.20mmReferparticularspecificationsCum 2807 120 days2 Supply of CoarseSandCum 1011(Signature of Contractor) SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 71<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>SCHEDULE – ‘B’ISSUE OF STORES TO THE CONTRACTOR(See condition 08 of IAFW-1815(Z) 1969 Repr<strong>in</strong>t)NAME OF WORK: -“SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PERSPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROADSASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBCFOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANKIN LEH- LADAKH REGION OF J & K STATE”S/No Particular Unit rate at which stores will beissued to the contractor_________NIL________Place of issue bynameRemarksSCHEDULE-‘C’LIST OF TOOLS AND PLANTS (OTHERTHAN TRANSPORT) WHICH WILL BE HIRED TOTHE CONTRACTORNAME OF WORK: - “SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PERSPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROADSASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBCFOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANKIN LEH- LADAKH REGION OF J & K STATE”S/No Quantity Particulars Details ofCrewAppliedHire chargePer unit perWork<strong>in</strong>gDay (Rs.)___NIL___Stand byCharges perUnit perDay (Rs.)Place ofIssue byNameRemarksSCHEDULE-‘D’TRANSPORT TO BE HIRED TO THE CONTRACTORNAME OF WORK: - “SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PERSPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OF ROADSASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBCFOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong> BET KM 0.00 TO 20.962 AND KM 30.00 TO34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANKIN LEH- LADAKH REGION OF J & K STATE”S/No Quantity Particulars Rate per Unit per work<strong>in</strong>gDay <strong>in</strong> Rs.________ NIL ________Place of issue Remarks(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 72<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>The President of India<strong>TENDER</strong>Hav<strong>in</strong>g exam<strong>in</strong>ed and perused the follow<strong>in</strong>g documents:-1. Special conditions and Particular Specifications signed by SW of HQ <strong>16</strong> <strong>BRTF</strong>.2. Schedule-‘A’, ‘B’, ‘C’ & ‘D’ attached hereto.3. General Conditions of Contracts IAFW-1815(Z)-2007 <strong>in</strong>clud<strong>in</strong>g errata and Amendmentthereto.Should this Tender be accepted, I/We agree.a) That the sum of Rs. 61,0<strong>14</strong>/- (Rupees sixty onethousand and fourteenonly)realized as Earnest Money shall either be reta<strong>in</strong>ed on account of part of SecurityDeposit or be returned by the Government on receipt of full amount of SecurityDeposit.b) To supply to the extent to which my/our tender may be accepted upon the Termsand Conditions referred to the said documents and the price or prices quoted byus <strong>in</strong> Schedule-‘A’ here<strong>in</strong> before such of the stores and materials listed there<strong>in</strong> asmay be required or demanded from me/us dur<strong>in</strong>g the period as <strong>in</strong>dicated <strong>in</strong>Schedule-’A’ commenc<strong>in</strong>g <strong>in</strong> respect of where my/our tender may here<strong>in</strong> beaccepted. I/We further agree that any conditions or sale of contract or Generalreservation, which may be pr<strong>in</strong>ted or written or any correspondence, deliverynotes, <strong>in</strong>voice, etc., submitted by me/us <strong>in</strong> connection with contract shall not beapplicable here.c) Refer all disputes, as required by condition 37 of IAFW-1815 (Z) to the SoleArbitrator or an Eng<strong>in</strong>eer Officer to be appo<strong>in</strong>ted by DGBR or <strong>in</strong> his absence, theOfficer Officiat<strong>in</strong>g as DGBR whose decision shall be f<strong>in</strong>al, conclusive andb<strong>in</strong>d<strong>in</strong>g.Signature of the WitnessDated:Address: ______________________________________________________________________________________________________Signature of the Contractor <strong>in</strong> the capacityof ____________ Authorised to sign theTender Document for and on behalf of______________________________(In block capital letters)Postal address __________________________________________________Telegraphic Address: _____________________________________________Telephone No(s): _________________(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page| 73<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>ACCEPTANCE______________ alterations have been made <strong>in</strong> this document and as evidence that thesealterations were made before the execution of this contract agreement, they are/have been<strong>in</strong>itialed by the contractor and Shri _______________________________________.The said officer (s) is/are hereby authorized to sign and <strong>in</strong>itial on my behalf, thedocuments form<strong>in</strong>g part of contract.The above tender is accepted by me on ________ day of _______ <strong>2013</strong> on behalf ofthe President of India for the contract sum of Rs. _________________________ (Rupees___________________________________________ only) at the item rates quoted <strong>in</strong>Schedule ‘A’.Signature dated the _____________day of ___________<strong>2013</strong>.CommanderAccept<strong>in</strong>g Officer(For and on behalf of thePresident of India)(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>


CA <strong>NO</strong>. : <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/ /<strong>2013</strong>-<strong>14</strong> Page|<strong>TENDER</strong> <strong>NO</strong>: <strong>CDR</strong> <strong>16</strong> <strong>BRTF</strong>/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>CORRIGENDUM No. 1 TO Short Term Notice Notice Invit<strong>in</strong>g Tender1. Reference this HQ letter No. 8433/Tend No.<strong>CDR</strong>-<strong>16</strong> TF/<strong>02</strong>/<strong>2013</strong>-<strong>14</strong>/04/E8 dated 31 May <strong>2013</strong>.2. The under mentioned corrigendum may please be carried out <strong>in</strong> the Short term Notice Invit<strong>in</strong>g Tender:-For: -SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PER SPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OFROAD SASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBC FOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong>BET KM 0.00 TO 20.962 AND KM 30.00 TO 39.038 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANK INLEH- LADAKH REGION OF J & K STATERead: -SUPPLY AND STACKING OF STONE CHIPS 13.20 MM AS PER SPECIFICATION AND COARSE SAND AT DETTCHANGLUNG KM 3.800 OFROAD SASOMA-WARSI-S<strong>NO</strong>UT (HMP LOCATION) FOR CARRYING OUT 2.50 CM THICK SDBC FOR RESURFACING WORKS YEAR <strong>2013</strong>-<strong>14</strong>BET KM 0.00 TO 20.962 AND KM 30.00 TO 34.159 ON KHALSAR-SASOMA ROAD UNDER 54 RCC/<strong>16</strong> <strong>BRTF</strong> SECTOR OF (P) HIMANK INLEH- LADAKH REGION OF J & K STATE.Para - 03For: - Rs. 47,96,400/- (Rupees forty seven lakh n<strong>in</strong>ety six thousand and four hundred only)Read: - Rs. 40,67,595/-(Rupees forty lakh sixty seven thousand five hundred and n<strong>in</strong>ety five only)Para - 06For: - 21 Jun <strong>2013</strong> onwardsRead: - 28 Jun <strong>2013</strong> onwardsPara - 08For: - 15 Jul <strong>2013</strong>Read: - 22 Jul <strong>2013</strong>Para - 10For: - Rs 71,946/- (Rupees seventy one thousand n<strong>in</strong>e hundred and forty six only)Read: - Rs 61,0<strong>14</strong>/- (Rupees sixty one thousand and fourteen only)Para - 23For: - 12 Jun <strong>2013</strong>Read: - 26 Jun <strong>2013</strong>3. All other entries of Short Term Notice Invit<strong>in</strong>g Tender will rema<strong>in</strong> unchanged.4. For detail refer BRO Website www.bro.gov.<strong>in</strong> or www.bro.<strong>nic</strong>.<strong>in</strong>.5. This amendment to Short term NIT shall form part of the contract.Case File No. 8433/ /E8Dated: _________ <strong>2013</strong>Headquarters<strong>16</strong> Border Roads Task ForcePIN: 9300<strong>16</strong>C/O 56 APO(Rajendra Kumar)EE (Civ)SWFor Accept<strong>in</strong>g Officer(Signature of Contractor)SWDated: <strong>2013</strong> For Accept<strong>in</strong>g OfficerDated: ___ Jun <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!