<strong>ILW</strong> WPD Summary SheetWork Package DescriptionPROJECT : ITER-LIKE WALL WP. NO. 1.2.1.1.1WP Title :Contractor :Start Event :End Event :WP Manager :Inputs required :Be SLICED CONCEPT – IWGL – CONCEPT &SCHEME DESIGNSUKAEAStart of Formal ProjectCompletion of Scheme DesignMark Norman ITP from Project Manager PMPTasks to be performed:WP Outputs:Raise & Approve TCD-RPrepare Conceptual Design of IWGL TilesIdentify Special TilesAnalysis of IWGL TilesHold Conceptual Design Review (Preliminary Design Review)Resolve Conceptual Design IssuesConceptual Design CompletePrepare Scheme Design of IWGL TilesHold Scheme Design ReviewResolve Scheme Design IssuesScheme Design CompleteComplete <strong>and</strong> Progress TCD-I for Scheme Design ApprovalApprove TCD-I for Scheme Design Approved Concept <strong>and</strong> Scheme Design of IWGL TilesSheet : 1 of 1Planned Date : 03 January 2005Planned Date : 11 April 2006Issue : A Rev : 1Date : 1 February 2005<strong>ILW</strong> Work PackageDescription SummarySheet – Concept & SchemeTask to be Performed arebars on ScheduleResources are rolled up fromlowest level of the WBS togive overall requirements –both costs <strong>and</strong> manpowerManagement Information : WBS(e): RO - 23611.A0110; DO – 23611.A0210Budget: Man Days: RO - 40; DO – 60; Analyst - 10Man Costs: £26,190Purchases: JOC - £0; Art. 7 - £0Total Budgeted Costs: £26,190

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!