12.07.2015 Views

Hydropower Resource Assessment at Existing Reclamation Facilities

Hydropower Resource Assessment at Existing Reclamation Facilities

Hydropower Resource Assessment at Existing Reclamation Facilities

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 1IntroductionChapter 4 <strong>Hydropower</strong> <strong>Assessment</strong> Tool: Describes components andapplic<strong>at</strong>ion of the <strong>Hydropower</strong> <strong>Assessment</strong> Tool developed for this study toevalu<strong>at</strong>e power production potential, benefit cost r<strong>at</strong>io, and internal r<strong>at</strong>e ofreturn (IRR) of potential hydropower sites.Chapter 5 Site Evalu<strong>at</strong>ion Results: Presents results of the <strong>Resource</strong><strong>Assessment</strong>, organized by Reclam<strong>at</strong>ion region, and sensitivity analyses.Chapter 6 Conclusions: Summarizes study results and conclusions, and usesfor future hydropower analyses.Chapter 7 References: Lists references used to develop the report.1-6 – March 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!