12.07.2015 Views

Guide for Completing Form AB-83F - ABSA

Guide for Completing Form AB-83F - ABSA

Guide for Completing Form AB-83F - ABSA

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>AB</strong>-<strong>83F</strong>a 2013-07For piping construction in a Canadian jurisdiction other than Alberta:If the piping contractor holds a valid certificate of authorization issued bythe jurisdictional authority:If the authorization permits the piping contractor to construct the pipingwithout inspection by the jurisdictional inspector, use <strong>AB</strong>SA <strong>for</strong>m <strong>AB</strong>-83 (or equivalent) to document construction. The <strong>for</strong>m must be certifiedby contractor and by the owner s inspector.If the authorization does not permit construction without inspection bythe jurisdictional inspector, use <strong>AB</strong>SA <strong>for</strong>m <strong>AB</strong>-<strong>83F</strong> (or equivalent) todocument construction. The <strong>for</strong>m must be certified by the contractorand an A.I. who inspected the pressure piping during construction.If the piping contractor does not hold a valid certificate of authorizationissued by the jurisdictional authority:Use <strong>AB</strong>SA <strong>for</strong>m <strong>AB</strong>-<strong>83F</strong>. The <strong>for</strong>m must be certified by the contractorand an A.I. who inspected the pressure piping during construction.Note: All B31.1 Boiler External Piping requires inspection and certification byan Authorized Inspector.Refer to <strong>AB</strong>SA publication <strong>AB</strong>-516 "PESR User <strong>Guide</strong>" section 31 <strong>for</strong> additionaldetails.Page 4 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!